Is DIY cheaper for a kitchen remodel?
On the defaults — a 200 sq ft kitchen, $60.00 of materials per sq ft, $1,500 of supplies, 120 hours at $55 an hour, against a pro price of $250.00 per sq ft — remodeling it yourself costs $20,100.00 against a $50,000.00 pro quote: DIY wins by $29,900.00. A pro kitchen remodel is usually priced per square foot — and a typical kitchen is 100–250 square feet. A pro kitchen remodel usually runs $150–$350 per square foot depending on the cabinets, counters and appliances, so a 200 sq ft pro job commonly lands between $30,000 and $70,000. A 200 sq ft kitchen is a middle-of-the-road job — big enough to matter, small enough to remodel yourself. DIY is worth it when the remodel is a cosmetic refresh — new paint, new hardware, new flooring, no walls moving, no plumbing moving — the kitchen is small and you have time; hire a pro when cabinets or counters are custom, plumbing or gas lines move, walls come down, the deadline is tight, or the warranty matters — most pro jobs carry a labour warranty the DIY route does not.
Three things about the model are worth stating plainly.
First, the DIY cost is 200 × $60.00 + $1,500 + 120 × $55 = $20,100.00. Second, the pro cost is 200 × $250.00 = $50,000.00. And third, DIY wins by $29,900.00; all listed in Accuracy & limitations.
The worked example, line by line
Setup: 200 sq ft kitchen, $60.00 of materials per sq ft, $1,500 of supplies, 120 hours at $55 an hour, pro price $250.00 per sq ft.
Line 1 — the DIY cost. The DIY cost is 200 × $60.00 = $12,000.00 of materials, + $1,500.00 of supplies, + 120 × $55.00 = $6,600.00 of labour = $20,100.00.
Line 2 — the pro cost. The pro cost is 200 × $250.00 = $50,000.00.
Line 3 — who wins. $50,000.00 − $20,100.00 = $29,900.00, so DIY wins by $29,900.00.
Line 4 — the check. $12,000.00 + $1,500.00 + $6,600.00 = $20,100.00, the DIY cost; and $50,000.00 − $20,100.00 = $29,900.00, the DIY win.
Every branch, checked
Hours 60: DIY $16,800.00; pro $50,000.00 — DIY wins by $33,200.00 — With 60 hours instead of 120 the DIY cost falls to $16,800.00 and DIY wins by $33,200.00.
Hours 180: DIY $23,400.00; pro $50,000.00 — DIY wins by $26,600.00 — With 180 hours the DIY cost rises to $23,400.00 and DIY wins by $26,600.00.
Materials $40.00: DIY $16,100.00; pro $50,000.00 — DIY wins by $33,900.00 — With materials at $40.00 per sq ft the DIY cost falls to $16,100.00 and DIY wins by $33,900.00.
Materials $90.00: DIY $26,100.00; pro $50,000.00 — DIY wins by $23,900.00 — With materials at $90.00 per sq ft the DIY cost rises to $26,100.00 and DIY wins by $23,900.00.
Materials $209.50: DIY $50,000.00; pro $50,000.00 — exact tie — With materials at $209.50 per sq ft the DIY cost is $50,000.00, exactly the pro cost — a dead heat, a TIE.
Supplies $36,500: DIY $55,100.00; pro $50,000.00 — Hiring wins by $5,100.00 — With supplies of $36,500 the DIY cost rises to $55,100.00 and hiring wins by $5,100.00.
Hours 240: DIY $26,700.00; pro $50,000.00 — DIY wins by $23,300.00 — With 240 hours the DIY cost is $26,700.00 and DIY wins by $23,300.00.
The reverses, worked backwards
Smallest hourly value where hiring WINS: At the displayed $305 the figures are DIY $50,100.00; pro $50,000.00 — Hiring wins by $100.00. At the displayed $305 the DIY cost is $50,100.00 against a $50,000.00 pro quote, so hiring wins by $100.00. At $304 the DIY cost is $49,980.00 and DIY wins by $20.00 — so $305 is the smallest hourly value where hiring wins.
Largest hourly value where DIY still wins by at least $5,000: At the displayed $262 the figures are DIY $44,940.00; pro $50,000.00 — DIY wins by $5,060.00. At the displayed $262 the DIY cost is $44,940.00 and DIY wins by $5,060.00. At $263 the DIY cost is $45,060.00 and DIY wins by only $4,940.00 — under the $5,000 target — so $262 is the largest hourly value where DIY still wins by at least $5,000.
Smallest supplies where hiring WINS: At the displayed $31,401 the figures are DIY $50,001.00; pro $50,000.00 — Hiring wins by $1.00. At the displayed $31,401 the DIY cost is $50,001.00 against a $50,000.00 pro quote, so hiring wins by $1.00. At $31,400 the DIY cost is $50,000.00, exactly the pro cost — a dead heat, a TIE — so $31,401 is the smallest supplies where hiring wins.
Smallest whole-cent materials where hiring WINS: At the displayed $209.51 the figures are DIY $50,002.00; pro $50,000.00 — Hiring wins by $2.00. At the displayed $209.51 the DIY cost is $50,002.00 against a $50,000.00 pro quote, so hiring wins by $2.00. At $209.50 the DIY cost is $50,000.00, exactly the pro cost — a dead heat, a TIE — so $209.51 is the smallest whole-cent materials where hiring wins.
Smallest hours where hiring WINS: At the displayed 664 the figures are DIY $50,020.00; pro $50,000.00 — Hiring wins by $20.00. At the displayed 664 hours the DIY cost is $50,020.00 against a $50,000.00 pro quote, so hiring wins by $20.00. At 663 hours the DIY cost is $49,965.00 and DIY wins by $35.00 — so 664 is the smallest hours where hiring wins.
Smallest pro price per sq ft where DIY wins at all: At the displayed $101 the figures are DIY $20,100.00; pro $20,200.00 — DIY wins by $100.00. At the displayed $101 per sq ft the pro cost is $20,200.00 against a $20,100.00 DIY cost, so DIY wins by $100.00. At $100 per sq ft the pro cost is $20,000.00 and hiring wins by $100.00. At $100.50 per sq ft the pro cost is $20,100.00 — a dead heat, a TIE, not a DIY win — so $101 is the smallest pro price where DIY wins at all.
A warning about the neighbours: every neighbour above sits one step from the star — $1 of supplies, one cent of materials, one hour, one dollar of hourly value, one dollar of pro price. A pro quote that moves by a dollar changes the answer. The page prints the neighbour values in full so the rounding does not mislead you: at $304 the DIY cost is $49,980.00 and DIY wins by $20.00; at $263 DIY wins by only $4,940.00; at $31,400 the DIY cost is $50,000.00, a dead heat; at $209.50 the DIY cost is $50,000.00, a dead heat; at 663 hours the DIY cost is $49,965.00 and DIY wins by $35.00; at $100 per sq ft the pro cost is $20,000.00 and hiring wins by $100.00; at $100.50 per sq ft the pro cost is $20,100.00, a dead heat.
What the defaults assume
The defaults are a 200 sq ft kitchen, $60.00 of materials per sq ft, $1,500 of supplies, 120 hours at $55 an hour, and a pro price of $250.00 per sq ft — DIY $20,100.00; pro $50,000.00 — DIY wins by $29,900.00. With Hours 60, DIY $16,800.00; pro $50,000.00 — DIY wins by $33,200.00. With Hours 180, DIY $23,400.00; pro $50,000.00 — DIY wins by $26,600.00. With Materials $40.00, DIY $16,100.00; pro $50,000.00 — DIY wins by $33,900.00. With Materials $90.00, DIY $26,100.00; pro $50,000.00 — DIY wins by $23,900.00. With Materials $209.50, DIY $50,000.00; pro $50,000.00 — exact tie. With Supplies $36,500, DIY $55,100.00; pro $50,000.00 — Hiring wins by $5,100.00. With Hours 240, DIY $26,700.00; pro $50,000.00 — DIY wins by $23,300.00. With All zero, DIY $0.00; pro $0.00 — exact tie. With 120 sq ft, materials $45.00, supplies $900, hours 40, hourly $50, pro $220.00, DIY $8,300.00; pro $26,400.00 — DIY wins by $18,100.00. With 150 sq ft, materials $62.375, supplies $1,237.50, hours 22.5, hourly $68.25, pro $212.50, DIY $12,129.38; pro $31,875.00 — DIY wins by $19,745.63. With Materials $220.00, supplies $2,000, hours 150, hourly $70, pro $250.00, DIY $56,500.00; pro $50,000.00 — Hiring wins by $6,500.00. With Hours 0, DIY $13,500.00; pro $50,000.00 — DIY wins by $36,500.00. With Hours 22.5, DIY $14,737.50; pro $50,000.00 — DIY wins by $35,262.50. With Win-by bars, supplies for a $10,000.00 DIY win $21,400; pro price per square foot for a $14,900.00 DIY win $175.00; materials per square foot for a $21,900.00 DIY win $100.00.
A note on the rounding: with 150 sq ft, materials $62.375, supplies $1,237.50, 22.5 hours at $68.25 an hour and a pro price of $212.50 per sq ft, the unrounded DIY cost is 12129.375 — which rounds half-up to $12,129.38 — and the unrounded win is 19745.625 — which rounds half-up to $19,745.63. The page prints the unrounded values so the rounding does not mislead you.
Output · formula · meaning
| Output | Formula | What it means |
|---|
| Kitchen size | input | 200 sq ft. |
| Materials per sq ft | input | $60.00. |
| Supplies | input | $1,500.00. |
| Your hours | input | 120. |
| Your hourly value | input | $55.00. |
| Pro price per sq ft | input | $250.00. |
| DIY cost | sq ft × materials per sq ft + supplies + hours × hourly value | $20,100.00. |
| Pro cost | sq ft × pro price per sq ft | $50,000.00. |
| Difference | pro cost − DIY cost | $29,900.00. |
| Reverse: Smallest whole-dollar hourly value where hiring WINS | step | $305 → $305. |
| Below the revr1 star | neighbor | DIY $49,980.00; pro $50,000.00 — DIY wins by $20.00. |
| Above the revr1 star | neighbor | DIY $50,220.00; pro $50,000.00 — Hiring wins by $220.00. |
| Reverse: Largest whole-dollar hourly value where DIY still wins by at least $5,000.00 | step | $262 → $262. |
| Below the revr2 star | neighbor | DIY $44,820.00; pro $50,000.00 — DIY wins by $5,180.00. |
| Above the revr2 star | neighbor | DIY $45,060.00; pro $50,000.00 — DIY wins by $4,940.00. |
| Reverse: Smallest whole-dollar supplies where hiring WINS | step | $31,401 → $31,401. |
| Below the revr3 star | neighbor | DIY $50,000.00; pro $50,000.00 — exact tie. |
| Above the revr3 star | neighbor | DIY $50,002.00; pro $50,000.00 — Hiring wins by $2.00. |
| Reverse: Smallest whole-cent materials per square foot where hiring WINS | step | $209.51 → $209.51. |
| Below the revr4 star | neighbor | DIY $50,000.00; pro $50,000.00 — exact tie. |
| Above the revr4 star | neighbor | DIY $50,004.00; pro $50,000.00 — Hiring wins by $4.00. |
| Reverse: Smallest whole-hour hours where hiring WINS | step | 664 hours → 664 hours. |
| Below the revr5 star | neighbor | DIY $49,965.00; pro $50,000.00 — DIY wins by $35.00. |
| Above the revr5 star | neighbor | DIY $50,075.00; pro $50,000.00 — Hiring wins by $75.00. |
| Reverse: Smallest whole-dollar pro price per square foot where DIY wins at all | step | $101 → $101. |
| Below the revr6 star | neighbor | DIY $20,100.00; pro $20,000.00 — Hiring wins by $100.00. |
| Above the revr6 star | neighbor | DIY $20,100.00; pro $20,400.00 — DIY wins by $300.00. |
| Hours 60 | same model | DIY $16,800.00; pro $50,000.00 — DIY wins by $33,200.00. |
| Hours 180 | same model | DIY $23,400.00; pro $50,000.00 — DIY wins by $26,600.00. |
| Materials $40.00 per square foot | same model | DIY $16,100.00; pro $50,000.00 — DIY wins by $33,900.00. |
| Materials $90.00 per square foot | same model | DIY $26,100.00; pro $50,000.00 — DIY wins by $23,900.00. |
| Materials $209.50 per square foot | same model | DIY $50,000.00; pro $50,000.00 — exact tie. |
| Supplies $36,500 | same model | DIY $55,100.00; pro $50,000.00 — Hiring wins by $5,100.00. |
| Hours 240 | same model | DIY $26,700.00; pro $50,000.00 — DIY wins by $23,300.00. |
Who uses this
- The homeowner with a 200 sq ft kitchen: they learn remodeling it themselves costs $20,100.00 against a $50,000.00 pro quote — and they check the $305 reverse to see the hourly value where hiring wins.
- The DIYer pricing cabinets and counters: they learn a pro kitchen remodel usually runs $150–$350 per square foot — and they check the $209.51 reverse to see the materials price where hiring wins.
- The busy parent with no weekends free: they learn a pro crew finishes in three to six weeks while a DIYer takes three to six months — and they check the 664 reverse to see the hours where hiring wins.
- The buyer comparing quotes: they learn a 200 sq ft pro job commonly lands between $30,000 and $70,000 — and they check the $101 reverse to see the pro price where DIY wins at all.
Accuracy & limitations
The math is first-principles: the DIY cost is sq ft × materials per sq ft + supplies + hours × hourly value; the pro cost is sq ft × pro price per sq ft; the winner is the lower cost, and equal costs are a dead heat — all rounded to two decimals half-up. What the model cannot do is price your kitchen: pro prices vary by region and by cabinet, counter and appliance — a pro kitchen remodel usually runs $150–$350 per square foot depending on the cabinets, counters and appliances; materials vary by grade; the hourly value is your own time, so price it honestly — an hour of your weekend is worth more than an hour you would spend idle. The model also cannot see the plumbing: cabinets hung out of level leave gaps and doors that will not close, a countertop measured wrong cannot be cut twice, plumbing connections that are not sealed properly drip behind the wall, electrical work that does not meet code fails inspection, and a remodel without the right permits causes problems when the home is sold — all risks the calculator cannot price; and it does not include permits, inspections, or a pro’s labour warranty. Use it to see the money — then walk the kitchen before you decide.
Cite this calculatorBright Side Kit. “DIY vs Hire Kitchen Remodel: Cost Comparison Calculator” brightoolbox.com, 2026. Method: DIY cost = sq ft × materials per sq ft + supplies + hours × hourly value; pro cost = sq ft × pro price per sq ft; DIY wins when the DIY cost is below the pro cost; equal costs are a dead heat. Reverses: smallest hourly value where hiring WINS is $305 (at $305 the DIY cost is $50,100.00 against a $50,000.00 pro quote, so hiring wins by $100.00; at $304 the DIY cost is $49,980.00 and DIY wins by $20.00); largest hourly value where DIY still wins by at least $5,000 is $262 (at $262 the DIY cost is $44,940.00 and DIY wins by $5,060.00; at $263 the DIY cost is $45,060.00 and DIY wins by only $4,940.00); smallest supplies where hiring WINS is $31,401 (at $31,401 the DIY cost is $50,001.00 against a $50,000.00 pro quote, so hiring wins by $1.00; at $31,400 the DIY cost is $50,000.00, exactly the pro cost — a dead heat, a TIE); smallest whole-cent materials where hiring WINS is $209.51 (at $209.51 the DIY cost is $50,002.00 against a $50,000.00 pro quote, so hiring wins by $2.00; at $209.50 the DIY cost is $50,000.00, exactly the pro cost — a dead heat, a TIE); smallest hours where hiring WINS is 664 (at 664 hours the DIY cost is $50,020.00 against a $50,000.00 pro quote, so hiring wins by $20.00; at 663 hours the DIY cost is $49,965.00 and DIY wins by $35.00); smallest pro price per sq ft where DIY wins at all is $101 (at $101 per sq ft the pro cost is $20,200.00 against a $20,100.00 DIY cost, so DIY wins by $100.00; at $100 per sq ft the pro cost is $20,000.00 and hiring wins by $100.00; at $100.50 per sq ft the pro cost is $20,100.00 — a dead heat, a TIE). Defaults: DIY $20,100.00; pro $50,000.00 — DIY wins by $29,900.00 Bright Side Kit. "DIY vs Hire Kitchen Remodel: Cost Comparison Calculator" https://brightoolbox.com/diy-vs-hire-kitchen-remodel/ Accessed October 27, 2026.
Embed this calculator
Frequently asked questions
How much does it cost to remodel a kitchen yourself?
$20,100.00 for a 200 sq ft kitchen. 200 × $60.00 of materials is $12,000.00, plus $1,500 of supplies, plus 120 hours at $55 an hour is $6,600.00 — $20,100.00 in all.
How much does a pro charge to remodel a kitchen?
$50,000.00 for a 200 sq ft kitchen. A pro kitchen remodel usually runs $150–$350 per square foot; at $250.00 per sq ft a 200 sq ft kitchen is $50,000.00. A 200 sq ft pro job commonly lands between $30,000 and $70,000.
Is it cheaper to remodel a kitchen yourself?
Yes, on the defaults — by $29,900.00. DIY costs $20,100.00 against a $50,000.00 pro quote. But the answer flips if your time is expensive: at an hourly value of $305, hiring wins by $100.00.
When should I hire a pro instead?
When cabinets or counters are custom, plumbing or gas lines move, walls come down, the deadline is tight, or the warranty matters. A pro crew finishes in three to six weeks; a DIYer takes three to six months — and most pro jobs carry a labour warranty the DIY route does not.
What materials does a DIY kitchen remodel need?
Cabinets, countertops, tile backsplash, flooring, paint, sink and faucet, and lighting. On the defaults the materials cost $12,000.00 for a 200 sq ft kitchen.
How long does a DIY kitchen remodel take?
Three to six months working evenings and weekends. A pro crew finishes in three to six weeks — the DIY route trades money for time, and a kitchen out of action that long means months of takeout.
What if the DIY cost and the pro cost are equal?
That is a dead heat, a TIE. At materials of $209.50 per sq ft, or at supplies of $31,400, or at a pro price of $100.50 per sq ft, the DIY cost is $50,000.00 — exactly the pro cost — so neither side wins.
Why does the calculator show $12,129.38 for the edge case?
Because the unrounded DIY cost is 12129.375. With 150 sq ft, materials $62.375, supplies $1,237.50, 22.5 hours at $68.25 an hour and a pro price of $212.50 per sq ft, the unrounded DIY cost is 12129.375 — which rounds half-up to $12,129.38 — and the unrounded win is 19745.625 — which rounds half-up to $19,745.63. The page prints the unrounded values so the rounding does not mislead you.