★ EVERYDAY · HOME · DIY VS HIRE

DIY vs Hire a Painter Calculator: Which Costs Less?

On the defaults — $150.00 of paint & supplies, 10 hours of your time at $30.00 an hour, a painter at $45.00 an hour for 8 hours, and $50.00 of prep & repair — painting it yourself costs $450.00 and hiring a painter costs $560.00, so DIY wins by $110.00. Put in your own materials, hours, and rates, and the calculator works out both sides of the same room and which one costs less. This comparison is part of the comparisons library. The existing DIY vs hire a plumber page is the same DIY-versus-hire format for plumbing; the existing DIY vs hire an electrician page is the same format for electrical work; the existing repair vs replace a car page compares repairing a car against replacing it — none of them compares painting a room yourself against hiring a painter with your own time valued in dollars. No DIY-vs-hire-painter calculator exists.

1086

DIY vs hire a painter

The same room, on both sides. DIY cost = paint & supplies + your hours × what your time is worth per hour. Hiring cost = painter hours × painter rate + paint & supplies + prep & repair cost. The gap = hiring total − DIY total (positive means hiring costs more, so DIY wins; negative means DIY costs more, so HIRING wins). Each total is rounded to cents first; the gap is computed from the rounded totals; a gap of exactly $0.00 is a Tie. Paint & supplies appear on BOTH sides, so changing the materials cost never changes the gap — only your time, the painter’s rate and hours, and the prep cost move the winner. Professional painters typically charge $25–$75 an hour, or $2–$6 per square foot of wall; a standard 12×12-foot room typically costs $300–$800 to paint professionally, paint included; a gallon of paint covers about 350 square feet and costs $25–$70; two coats are standard for a good finish, and new drywall needs a coat of primer first; prep work — filling holes, sanding, taping, moving furniture — is where DIY jobs most often run over budget on time; a bad DIY paint job can cost more to fix than hiring a painter would have cost in the first place; never paint over a glossy surface without sanding or priming — the new paint will peel. DIY wins the headline job by $110.00 because eight hours of a painter at $45 an hour plus $50.00 of prep costs more than ten hours of your own time at $30 an hour — but at 16 hours of your time hiring wins by $70.00; the prep cost is the line that decides close jobs (at $0.00 prep the DIY win shrinks to $60.00); the hire total ignores the cost of waiting for a painter’s opening; the DIY total ignores the cost of a finish you have to redo; all listed in Accuracy & limitations.

The cost of paint and supplies for the room — the default is $150.00.

How many hours the job takes you — the default is 10.

What your time is worth per hour — the default is $30.00.

The painter’s hourly rate — the default is $45.00.

How many hours the painter takes — the default is 8.

The cost of prep and repair work — the default is $50.00.

DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $560.00 (8 hours × $45.00 + $150.00 materials + $50.00 prep): gap +$110.00 — DIY wins by $110.00DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $560.00 (8 hours × $45.00 + $150.00 materials + $50.00 prep): gap +$110.00 — DIY wins by $110.00DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $560.00 (8 hours × $45.00 + $150.00 materials + $50.00 prep): gap +$110.00 — DIY wins by $110.00. The DIY cost is $150.00 + 10 × $30.00 = $450.00, and the hiring cost is 8 × $45.00 + $150.00 + $50.00 = $560.00. The gap is $560.00 − $450.00 = $110.00, so DIY wins by $110.00.

Paint & supplies: $150.00

Your DIY hours: 10 hours

Your hourly value: $30.00/hour

Painter rate: $45.00/hour

Painter labor hours: 8 hours

Prep & repair cost: $50.00

DIY cost: $450.00

Hiring cost: $560.00

Gap (hiring − DIY): +$110.00

Winner: DIY wins by $110.00

Branch: paint & supplies $300.00: DIY $600.00 ($300.00 materials + 10 hours × $30.00) vs hiring $710.00 (8 hours × $45.00 + $300.00 materials + $50.00 prep): gap +$110.00 — DIY wins by $110.00

Branch: painter $60.00/hour: DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $680.00 (8 hours × $60.00 + $150.00 materials + $50.00 prep): gap +$230.00 — DIY wins by $230.00

Branch: DIY 16 hours: DIY $630.00 ($150.00 materials + 16 hours × $30.00) vs hiring $560.00 (8 hours × $45.00 + $150.00 materials + $50.00 prep): gap −$70.00 — HIRING wins by $70.00

Branch: painter 12 hours: DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $740.00 (12 hours × $45.00 + $150.00 materials + $50.00 prep): gap +$290.00 — DIY wins by $290.00

Branch: your time $50.00/hour: DIY $650.00 ($150.00 materials + 10 hours × $50.00) vs hiring $560.00 (8 hours × $45.00 + $150.00 materials + $50.00 prep): gap −$90.00 — HIRING wins by $90.00

Branch: prep $0.00: DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $510.00 (8 hours × $45.00 + $150.00 materials + $0.00 prep): gap +$60.00 — DIY wins by $60.00

Branch: prep $200.00: DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $710.00 (8 hours × $45.00 + $150.00 materials + $200.00 prep): gap +$260.00 — DIY wins by $260.00

Reverse: painter rate for an exact tie: $31.25/hour

Reverse: painter rate for an exact tie: (rounded): $31.25/hour

Exact painter rate for an exact tie: 31.2500

At $31.25/hour the figures are: DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $450.00 (8 hours × $31.25 + $150.00 materials + $50.00 prep): gap $0.00 — Tie

At the lower neighbor the figures are: DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $449.92 (8 hours × $31.24 + $150.00 materials + $50.00 prep): gap −$0.08 — HIRING wins by $0.08

At the upper neighbor the figures are: DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $450.08 (8 hours × $31.26 + $150.00 materials + $50.00 prep): gap +$0.08 — DIY wins by $0.08

Reverse verdict: CONTINUOUS

Reverse: smallest 2-decimal DIY hours whose DIY cost reaches the $560.00 hiring total: 13.67 hours

Reverse: smallest 2-decimal DIY hours whose DIY cost reaches the $560.00 hiring total: (rounded): 13.67 hours

Exact smallest 2-decimal DIY hours whose DIY cost reaches the $560.00 hiring total: 13.6667

At 13.67 hours the figures are: DIY $560.10 ($150.00 materials + 13.67 hours × $30.00) vs hiring $560.00 (8 hours × $45.00 + $150.00 materials + $50.00 prep): gap −$0.10 — HIRING wins by $0.10

At the lower neighbor the figures are: DIY $559.80 ($150.00 materials + 13.66 hours × $30.00) vs hiring $560.00 (8 hours × $45.00 + $150.00 materials + $50.00 prep): gap +$0.20 — DIY wins by $0.20

At the upper neighbor the figures are: DIY $560.40 ($150.00 materials + 13.68 hours × $30.00) vs hiring $560.00 (8 hours × $45.00 + $150.00 materials + $50.00 prep): gap −$0.40 — HIRING wins by $0.40

Reverse verdict: CONTINUOUS

Reverse: smallest 2-decimal painter hours whose ROUNDED hiring total reaches the $450.00 DIY total: 5.56 hours

Reverse: smallest 2-decimal painter hours whose ROUNDED hiring total reaches the $450.00 DIY total: (rounded): 5.56 hours

Exact smallest 2-decimal painter hours whose ROUNDED hiring total reaches the $450.00 DIY total: 5.5556

At 5.56 hours the figures are: DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $450.20 (5.56 hours × $45.00 + $150.00 materials + $50.00 prep): gap +$0.20 — DIY wins by $0.20

At the lower neighbor the figures are: DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $449.75 (5.55 hours × $45.00 + $150.00 materials + $50.00 prep): gap −$0.25 — HIRING wins by $0.25

At the upper neighbor the figures are: DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $450.65 (5.57 hours × $45.00 + $150.00 materials + $50.00 prep): gap +$0.65 — DIY wins by $0.65

Reverse verdict: CONTINUOUS

Reverse: your hourly value so DIY wins by exactly $50.00: $36.00/hour

Reverse: your hourly value so DIY wins by exactly $50.00: (rounded): $36.00/hour

Exact your hourly value so DIY wins by exactly $50.00: 36.0000

At $36.00/hour the figures are: DIY $510.00 ($150.00 materials + 10 hours × $36.00) vs hiring $560.00 (8 hours × $45.00 + $150.00 materials + $50.00 prep): gap +$50.00 — DIY wins by $50.00

At the lower neighbor the figures are: DIY $509.90 ($150.00 materials + 10 hours × $35.99) vs hiring $560.00 (8 hours × $45.00 + $150.00 materials + $50.00 prep): gap +$50.10 — DIY wins by $50.10

At the upper neighbor the figures are: DIY $510.10 ($150.00 materials + 10 hours × $36.01) vs hiring $560.00 (8 hours × $45.00 + $150.00 materials + $50.00 prep): gap +$49.90 — DIY wins by $49.90

Reverse verdict: CONTINUOUS

Reverse: prep cost so DIY wins by exactly $150.00: $90.00

Reverse: prep cost so DIY wins by exactly $150.00: (rounded): $90.00

Exact prep cost so DIY wins by exactly $150.00: 90.0000

At $90.00 the figures are: DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $600.00 (8 hours × $45.00 + $150.00 materials + $90.00 prep): gap +$150.00 — DIY wins by $150.00

At the lower neighbor the figures are: DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $599.99 (8 hours × $45.00 + $150.00 materials + $89.99 prep): gap +$149.99 — DIY wins by $149.99

At the upper neighbor the figures are: DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $600.01 (8 hours × $45.00 + $150.00 materials + $90.01 prep): gap +$150.01 — DIY wins by $150.01

Reverse verdict: CONTINUOUS

Reverse: smallest 2-decimal DIY hours whose DIY cost reaches $660.00 (hiring wins by $100.00 at exactly $660.00): 17.00 hours

Reverse: smallest 2-decimal DIY hours whose DIY cost reaches $660.00 (hiring wins by $100.00 at exactly $660.00): (rounded): 17.00 hours

Exact smallest 2-decimal DIY hours whose DIY cost reaches $660.00 (hiring wins by $100.00 at exactly $660.00): 17.0000

At 17.00 hours the figures are: DIY $660.00 ($150.00 materials + 17 hours × $30.00) vs hiring $560.00 (8 hours × $45.00 + $150.00 materials + $50.00 prep): gap −$100.00 — HIRING wins by $100.00

At the lower neighbor the figures are: DIY $659.70 ($150.00 materials + 16.99 hours × $30.00) vs hiring $560.00 (8 hours × $45.00 + $150.00 materials + $50.00 prep): gap −$99.70 — HIRING wins by $99.70

At the upper neighbor the figures are: DIY $660.30 ($150.00 materials + 17.01 hours × $30.00) vs hiring $560.00 (8 hours × $45.00 + $150.00 materials + $50.00 prep): gap −$100.30 — HIRING wins by $100.30

Reverse verdict: CONTINUOUS

Edge: paint & supplies $0.00: DIY $300.00 ($0.00 materials + 10 hours × $30.00) vs hiring $410.00 (8 hours × $45.00 + $0.00 materials + $50.00 prep): gap +$110.00 — DIY wins by $110.00

Edge: DIY 0 hours: DIY $150.00 ($150.00 materials + 0 hours × $30.00) vs hiring $560.00 (8 hours × $45.00 + $150.00 materials + $50.00 prep): gap +$410.00 — DIY wins by $410.00

Edge: painter $25.00/hour: DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $400.00 (8 hours × $25.00 + $150.00 materials + $50.00 prep): gap −$50.00 — HIRING wins by $50.00

Edge: painter 16 hours: DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $920.00 (16 hours × $45.00 + $150.00 materials + $50.00 prep): gap +$470.00 — DIY wins by $470.00

Edge: your time $0.00/hour: DIY $150.00 ($150.00 materials + 10 hours × $0.00) vs hiring $560.00 (8 hours × $45.00 + $150.00 materials + $50.00 prep): gap +$410.00 — DIY wins by $410.00

Edge: prep $300.00: DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $810.00 (8 hours × $45.00 + $150.00 materials + $300.00 prep): gap +$360.00 — DIY wins by $360.00

Edge: painter $75.00/hour: DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $800.00 (8 hours × $75.00 + $150.00 materials + $50.00 prep): gap +$350.00 — DIY wins by $350.00

DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $560.00 (8 hours × $45.00 + $150.00 materials + $50.00 prep): gap +$110.00 — DIY wins by $110.00. On the defaults doing it yourself costs $450.00 against $560.00 to hire a painter — DIY wins by $110.00. Your time is the lever: at 16 hours of your time hiring wins by $70.00.

Paint & supplies $300.00: DIY $600.00 ($300.00 materials + 10 hours × $30.00) vs hiring $710.00 (8 hours × $45.00 + $300.00 materials + $50.00 prep): gap +$110.00 — DIY wins by $110.00.

Painter $60.00/hour: DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $680.00 (8 hours × $60.00 + $150.00 materials + $50.00 prep): gap +$230.00 — DIY wins by $230.00.

Diy 16 hours: DIY $630.00 ($150.00 materials + 16 hours × $30.00) vs hiring $560.00 (8 hours × $45.00 + $150.00 materials + $50.00 prep): gap −$70.00 — HIRING wins by $70.00.

Painter 12 hours: DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $740.00 (12 hours × $45.00 + $150.00 materials + $50.00 prep): gap +$290.00 — DIY wins by $290.00.

Your time $50.00/hour: DIY $650.00 ($150.00 materials + 10 hours × $50.00) vs hiring $560.00 (8 hours × $45.00 + $150.00 materials + $50.00 prep): gap −$90.00 — HIRING wins by $90.00.

Prep $0.00: DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $510.00 (8 hours × $45.00 + $150.00 materials + $0.00 prep): gap +$60.00 — DIY wins by $60.00.

Prep $200.00: DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $710.00 (8 hours × $45.00 + $150.00 materials + $200.00 prep): gap +$260.00 — DIY wins by $260.00.

Reverse: Painter rate for an exact tie is $31.25/hour (exact 31.2500); at $31.25/hour the figures are DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $450.00 (8 hours × $31.25 + $150.00 materials + $50.00 prep): gap $0.00 — Tie; at the lower neighbor the figures are DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $449.92 (8 hours × $31.24 + $150.00 materials + $50.00 prep): gap −$0.08 — HIRING wins by $0.08 — verdict: CONTINUOUS. Smallest 2-decimal diy hours whose diy cost reaches the $560.00 hiring total is 13.67 hours (exact 13.6667); at 13.67 hours the figures are DIY $560.10 ($150.00 materials + 13.67 hours × $30.00) vs hiring $560.00 (8 hours × $45.00 + $150.00 materials + $50.00 prep): gap −$0.10 — HIRING wins by $0.10; at the lower neighbor the figures are DIY $559.80 ($150.00 materials + 13.66 hours × $30.00) vs hiring $560.00 (8 hours × $45.00 + $150.00 materials + $50.00 prep): gap +$0.20 — DIY wins by $0.20 — verdict: CONTINUOUS. Smallest 2-decimal painter hours whose rounded hiring total reaches the $450.00 diy total is 5.56 hours (exact 5.5556); at 5.56 hours the figures are DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $450.20 (5.56 hours × $45.00 + $150.00 materials + $50.00 prep): gap +$0.20 — DIY wins by $0.20; at the lower neighbor the figures are DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $449.75 (5.55 hours × $45.00 + $150.00 materials + $50.00 prep): gap −$0.25 — HIRING wins by $0.25 — verdict: CONTINUOUS. Your hourly value so diy wins by exactly $50.00 is $36.00/hour (exact 36.0000); at $36.00/hour the figures are DIY $510.00 ($150.00 materials + 10 hours × $36.00) vs hiring $560.00 (8 hours × $45.00 + $150.00 materials + $50.00 prep): gap +$50.00 — DIY wins by $50.00; at the lower neighbor the figures are DIY $509.90 ($150.00 materials + 10 hours × $35.99) vs hiring $560.00 (8 hours × $45.00 + $150.00 materials + $50.00 prep): gap +$50.10 — DIY wins by $50.10 — verdict: CONTINUOUS. Prep cost so diy wins by exactly $150.00 is $90.00 (exact 90.0000); at $90.00 the figures are DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $600.00 (8 hours × $45.00 + $150.00 materials + $90.00 prep): gap +$150.00 — DIY wins by $150.00; at the lower neighbor the figures are DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $599.99 (8 hours × $45.00 + $150.00 materials + $89.99 prep): gap +$149.99 — DIY wins by $149.99 — verdict: CONTINUOUS. Smallest 2-decimal diy hours whose diy cost reaches $660.00 (hiring wins by $100.00 at exactly $660.00) is 17.00 hours (exact 17.0000); at 17.00 hours the figures are DIY $660.00 ($150.00 materials + 17 hours × $30.00) vs hiring $560.00 (8 hours × $45.00 + $150.00 materials + $50.00 prep): gap −$100.00 — HIRING wins by $100.00; at the lower neighbor the figures are DIY $659.70 ($150.00 materials + 16.99 hours × $30.00) vs hiring $560.00 (8 hours × $45.00 + $150.00 materials + $50.00 prep): gap −$99.70 — HIRING wins by $99.70 — verdict: CONTINUOUS.

Edges: Paint & supplies $0.00 gives DIY $300.00 ($0.00 materials + 10 hours × $30.00) vs hiring $410.00 (8 hours × $45.00 + $0.00 materials + $50.00 prep): gap +$110.00 — DIY wins by $110.00. Diy 0 hours gives DIY $150.00 ($150.00 materials + 0 hours × $30.00) vs hiring $560.00 (8 hours × $45.00 + $150.00 materials + $50.00 prep): gap +$410.00 — DIY wins by $410.00. Painter $25.00/hour gives DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $400.00 (8 hours × $25.00 + $150.00 materials + $50.00 prep): gap −$50.00 — HIRING wins by $50.00. Painter 16 hours gives DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $920.00 (16 hours × $45.00 + $150.00 materials + $50.00 prep): gap +$470.00 — DIY wins by $470.00. Your time $0.00/hour gives DIY $150.00 ($150.00 materials + 10 hours × $0.00) vs hiring $560.00 (8 hours × $45.00 + $150.00 materials + $50.00 prep): gap +$410.00 — DIY wins by $410.00. Prep $300.00 gives DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $810.00 (8 hours × $45.00 + $150.00 materials + $300.00 prep): gap +$360.00 — DIY wins by $360.00. Painter $75.00/hour gives DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $800.00 (8 hours × $75.00 + $150.00 materials + $50.00 prep): gap +$350.00 — DIY wins by $350.00.

Should you DIY it or hire a painter?

On the defaults — $150.00 of paint & supplies, 10 hours of your time at $30.00 an hour, a painter at $45.00 an hour for 8 hours, and $50.00 of prep & repair — the DIY cost is $450.00 ($150.00 + 10 × $30.00) and the hiring cost is $560.00 (8 × $45.00 + $150.00 + $50.00), so DIY wins by $110.00. The same room, on both sides: the paint & supplies appear on both sides, so changing the materials cost never changes the gap — only your time, the painter’s rate and hours, and the prep cost move the winner. Professional painters typically charge $25–$75 an hour, or $2–$6 per square foot of wall; a standard 12×12-foot room typically costs $300–$800 to paint professionally, paint included; a gallon of paint covers about 350 square feet and costs $25–$70.

Five things about the model are worth stating plainly. First, the DIY cost is the paint & supplies plus your hours times what your time is worth — $150.00 + 10 × $30.00 = $450.00. Second, the hiring cost is the painter’s hours times the rate plus the paint & supplies plus the prep cost — 8 × $45.00 + $150.00 + $50.00 = $560.00. Third, the gap is the hiring total minus the DIY total — $560.00 − $450.00 = +$110.00, so DIY wins. Fourth, the materials cancel out — at $300.00 of paint & supplies both sides rise by $150.00 and the gap stays $110.00. And fifth, your time is the lever: at 16 hours the DIY cost is $630.00 and hiring wins by $70.00; all listed in Accuracy & limitations.

The worked example, line by line

Setup: $150.00 paint & supplies, 10 DIY hours at $30.00 an hour, painter $45.00 an hour for 8 hours, $50.00 prep & repair.

Line 1 — the DIY cost. The DIY cost is $150.00 + 10 × $30.00 = $450.00.

Line 2 — the hiring cost. The hiring cost is 8 × $45.00 + $150.00 + $50.00 = $560.00.

Line 3 — the gap. The gap is $560.00 − $450.00 = +$110.00, so DIY wins by $110.00.

Line 4 — the flip. At 16 hours of your time the DIY cost is $150.00 + 16 × $30.00 = $630.00, so the gap is $560.00 − $630.00 = −$70.00 and hiring wins by $70.00.

Line 5 — the prep cost. With $0.00 of prep the hiring cost is $510.00, so the gap is $510.00 − $450.00 = +$60.00 and DIY wins by $60.00 — the prep cost is the line that decides close jobs.

Every branch, checked

Paint & supplies $300.00: DIY $600.00 ($300.00 materials + 10 hours × $30.00) vs hiring $710.00 (8 hours × $45.00 + $300.00 materials + $50.00 prep): gap +$110.00 — DIY wins by $110.00 — At $300.00 of paint & supplies both sides rise by $150.00 and the gap stays $110.00 — materials never move the winner.

Painter $60.00/hour: DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $680.00 (8 hours × $60.00 + $150.00 materials + $50.00 prep): gap +$230.00 — DIY wins by $230.00 — At $60.00 an hour the hiring cost is $680.00 and DIY wins by $230.00.

Diy 16 hours: DIY $630.00 ($150.00 materials + 16 hours × $30.00) vs hiring $560.00 (8 hours × $45.00 + $150.00 materials + $50.00 prep): gap −$70.00 — HIRING wins by $70.00 — At 16 DIY hours the DIY cost is $630.00 — hiring wins by $70.00.

Painter 12 hours: DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $740.00 (12 hours × $45.00 + $150.00 materials + $50.00 prep): gap +$290.00 — DIY wins by $290.00 — At 12 hours of painter labor the hiring cost is $740.00 and DIY wins by $290.00.

Your time $50.00/hour: DIY $650.00 ($150.00 materials + 10 hours × $50.00) vs hiring $560.00 (8 hours × $45.00 + $150.00 materials + $50.00 prep): gap −$90.00 — HIRING wins by $90.00 — Value your time at $50.00 an hour and the DIY cost is $650.00 — hiring wins by $90.00.

Prep $0.00: DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $510.00 (8 hours × $45.00 + $150.00 materials + $0.00 prep): gap +$60.00 — DIY wins by $60.00 — With no prep the hiring cost is $510.00 and DIY wins by only $60.00 — prep is the line that decides close jobs.

Prep $200.00: DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $710.00 (8 hours × $45.00 + $150.00 materials + $200.00 prep): gap +$260.00 — DIY wins by $260.00 — At $200.00 of prep the hiring cost is $710.00 and DIY wins by $260.00.

The reverses, worked backwards

Painter rate for an exact tie: The painter rate for an exact tie is $31.25/hour (exact). At $31.25 an hour the DIY cost is $450.00, the hiring cost is $450.00, and the gap is $0.00 — a Tie. An unusually low rate — it shows how far the rate must fall for hiring to tie.

Smallest 2-decimal diy hours whose diy cost reaches the $560.00 hiring total: The smallest 2-decimal DIY hours whose DIY cost reaches the $560.00 hiring total are 13.67 hours (exact 13.6667). At 13.67 hours the DIY cost is $560.10 and the gap is −$0.10 — HIRING wins by $0.10; at 13.66 hours the DIY cost is $559.80 and the gap is +$0.20 — DIY wins by $0.20.

Smallest 2-decimal painter hours whose rounded hiring total reaches the $450.00 diy total: The smallest 2-decimal painter hours whose ROUNDED hiring total reaches the $450.00 DIY total are 5.56 hours (exact 5.5556). At 5.56 hours the hiring total is $450.20 and the gap is +$0.20 — DIY wins by $0.20; at 5.55 hours the hiring total is $449.75 and the gap is −$0.25 — HIRING wins by $0.25.

Your hourly value so diy wins by exactly $50.00: Your hourly value so DIY wins by exactly $50.00 is $36.00/hour (exact). At $36.00 an hour the DIY cost is $510.00, the hiring cost is $560.00, and the gap is +$50.00 — DIY wins by $50.00.

Prep cost so diy wins by exactly $150.00: The prep cost so DIY wins by exactly $150.00 is $90.00 (exact). At $90.00 of prep the hiring cost is $600.00, the DIY cost is $450.00, and the gap is +$150.00 — DIY wins by $150.00.

Smallest 2-decimal diy hours whose diy cost reaches $660.00 (hiring wins by $100.00 at exactly $660.00): The smallest 2-decimal DIY hours whose DIY cost reaches $660.00 are 17.00 hours (exact 17.0000). At 17.00 hours the DIY cost is $660.00 and the gap is −$100.00 — HIRING wins by $100.00; at 16.99 hours the DIY cost is $659.70 and the gap is −$99.70 — HIRING wins by $99.70.

What the defaults assume

The defaults are $150.00 of paint & supplies, 10 DIY hours at $30.00 an hour, a painter at $45.00 an hour for 8 hours, and $50.00 of prep & repair — DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $560.00 (8 hours × $45.00 + $150.00 materials + $50.00 prep): gap +$110.00 — DIY wins by $110.00. With paint & supplies $300.00, DIY $600.00 ($300.00 materials + 10 hours × $30.00) vs hiring $710.00 (8 hours × $45.00 + $300.00 materials + $50.00 prep): gap +$110.00 — DIY wins by $110.00 — At $300.00 of paint & supplies both sides rise by $150.00 and the gap stays $110.00 — materials never move the winner. With painter $60.00/hour, DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $680.00 (8 hours × $60.00 + $150.00 materials + $50.00 prep): gap +$230.00 — DIY wins by $230.00 — At $60.00 an hour the hiring cost is $680.00 and DIY wins by $230.00. With DIY 16 hours, DIY $630.00 ($150.00 materials + 16 hours × $30.00) vs hiring $560.00 (8 hours × $45.00 + $150.00 materials + $50.00 prep): gap −$70.00 — HIRING wins by $70.00 — At 16 DIY hours the DIY cost is $630.00 — hiring wins by $70.00. With painter 12 hours, DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $740.00 (12 hours × $45.00 + $150.00 materials + $50.00 prep): gap +$290.00 — DIY wins by $290.00 — At 12 hours of painter labor the hiring cost is $740.00 and DIY wins by $290.00. With your time $50.00/hour, DIY $650.00 ($150.00 materials + 10 hours × $50.00) vs hiring $560.00 (8 hours × $45.00 + $150.00 materials + $50.00 prep): gap −$90.00 — HIRING wins by $90.00 — Value your time at $50.00 an hour and the DIY cost is $650.00 — hiring wins by $90.00. With prep $0.00, DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $510.00 (8 hours × $45.00 + $150.00 materials + $0.00 prep): gap +$60.00 — DIY wins by $60.00 — With no prep the hiring cost is $510.00 and DIY wins by only $60.00 — prep is the line that decides close jobs. With prep $200.00, DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $710.00 (8 hours × $45.00 + $150.00 materials + $200.00 prep): gap +$260.00 — DIY wins by $260.00 — At $200.00 of prep the hiring cost is $710.00 and DIY wins by $260.00. With paint & supplies $0.00, DIY $300.00 ($0.00 materials + 10 hours × $30.00) vs hiring $410.00 (8 hours × $45.00 + $0.00 materials + $50.00 prep): gap +$110.00 — DIY wins by $110.00 — With $0.00 of materials the DIY cost is $300.00 and the hiring cost is $410.00 — DIY still wins by $110.00. With DIY 0 hours, DIY $150.00 ($150.00 materials + 0 hours × $30.00) vs hiring $560.00 (8 hours × $45.00 + $150.00 materials + $50.00 prep): gap +$410.00 — DIY wins by $410.00 — With 0 DIY hours the DIY cost is just the $150.00 of materials and DIY wins by $410.00. With painter $25.00/hour, DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $400.00 (8 hours × $25.00 + $150.00 materials + $50.00 prep): gap −$50.00 — HIRING wins by $50.00 — At $25.00 an hour the hiring cost is $400.00 — hiring wins by $50.00. With painter 16 hours, DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $920.00 (16 hours × $45.00 + $150.00 materials + $50.00 prep): gap +$470.00 — DIY wins by $470.00 — At 16 hours of painter labor the hiring cost is $920.00 and DIY wins by $470.00. With your time $0.00/hour, DIY $150.00 ($150.00 materials + 10 hours × $0.00) vs hiring $560.00 (8 hours × $45.00 + $150.00 materials + $50.00 prep): gap +$410.00 — DIY wins by $410.00 — Value your time at $0.00 an hour and the DIY cost is $150.00 — DIY wins by $410.00. With prep $300.00, DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $810.00 (8 hours × $45.00 + $150.00 materials + $300.00 prep): gap +$360.00 — DIY wins by $360.00 — At $300.00 of prep the hiring cost is $810.00 and DIY wins by $360.00. With painter $75.00/hour, DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $800.00 (8 hours × $75.00 + $150.00 materials + $50.00 prep): gap +$350.00 — DIY wins by $350.00 — At $75.00 an hour the hiring cost is $800.00 and DIY wins by $350.00.

Output · formula · meaning

OutputFormulaWhat it means
Paint & suppliesinput$150.00.
Your DIY hoursinput10 hours.
Your hourly valueinput$30.00/hour.
Painter rateinput$45.00/hour.
Painter labor hoursinput8 hours.
Prep & repair costinput$50.00.
DIY costpaint & supplies + your hours × your hourly value$450.00.
Hiring costpainter hours × painter rate + paint & supplies + prep$560.00.
Gaphiring total − DIY total+$110.00.
WinnerDIY wins if the gap is positive, HIRING wins if it is negative, Tie at $0.00DIY wins by $110.00.
painter rate for an exact tieexact 31.2500$31.25/hour → $31.25/hour.
Below the revr1 starneighborDIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $449.92 (8 hours × $31.24 + $150.00 materials + $50.00 prep): gap −$0.08 — HIRING wins by $0.08.
Above the revr1 starneighborDIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $450.08 (8 hours × $31.26 + $150.00 materials + $50.00 prep): gap +$0.08 — DIY wins by $0.08.
smallest 2-decimal DIY hours whose DIY cost reaches the $560.00 hiring totalexact 13.666713.67 hours → 13.67 hours.
Below the revr2 starneighborDIY $559.80 ($150.00 materials + 13.66 hours × $30.00) vs hiring $560.00 (8 hours × $45.00 + $150.00 materials + $50.00 prep): gap +$0.20 — DIY wins by $0.20.
Above the revr2 starneighborDIY $560.40 ($150.00 materials + 13.68 hours × $30.00) vs hiring $560.00 (8 hours × $45.00 + $150.00 materials + $50.00 prep): gap −$0.40 — HIRING wins by $0.40.
smallest 2-decimal painter hours whose ROUNDED hiring total reaches the $450.00 DIY totalexact 5.55565.56 hours → 5.56 hours.
Below the revr3 starneighborDIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $449.75 (5.55 hours × $45.00 + $150.00 materials + $50.00 prep): gap −$0.25 — HIRING wins by $0.25.
Above the revr3 starneighborDIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $450.65 (5.57 hours × $45.00 + $150.00 materials + $50.00 prep): gap +$0.65 — DIY wins by $0.65.
your hourly value so DIY wins by exactly $50.00exact 36.0000$36.00/hour → $36.00/hour.
Below the revr4 starneighborDIY $509.90 ($150.00 materials + 10 hours × $35.99) vs hiring $560.00 (8 hours × $45.00 + $150.00 materials + $50.00 prep): gap +$50.10 — DIY wins by $50.10.
Above the revr4 starneighborDIY $510.10 ($150.00 materials + 10 hours × $36.01) vs hiring $560.00 (8 hours × $45.00 + $150.00 materials + $50.00 prep): gap +$49.90 — DIY wins by $49.90.
prep cost so DIY wins by exactly $150.00exact 90.0000$90.00 → $90.00.
Below the revr5 starneighborDIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $599.99 (8 hours × $45.00 + $150.00 materials + $89.99 prep): gap +$149.99 — DIY wins by $149.99.
Above the revr5 starneighborDIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $600.01 (8 hours × $45.00 + $150.00 materials + $90.01 prep): gap +$150.01 — DIY wins by $150.01.
smallest 2-decimal DIY hours whose DIY cost reaches $660.00 (hiring wins by $100.00 at exactly $660.00)exact 17.000017.00 hours → 17.00 hours.
Below the revr6 starneighborDIY $659.70 ($150.00 materials + 16.99 hours × $30.00) vs hiring $560.00 (8 hours × $45.00 + $150.00 materials + $50.00 prep): gap −$99.70 — HIRING wins by $99.70.
Above the revr6 starneighborDIY $660.30 ($150.00 materials + 17.01 hours × $30.00) vs hiring $560.00 (8 hours × $45.00 + $150.00 materials + $50.00 prep): gap −$100.30 — HIRING wins by $100.30.
paint & supplies $300.00same modelDIY $600.00 ($300.00 materials + 10 hours × $30.00) vs hiring $710.00 (8 hours × $45.00 + $300.00 materials + $50.00 prep): gap +$110.00 — DIY wins by $110.00.
painter $60.00/hoursame modelDIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $680.00 (8 hours × $60.00 + $150.00 materials + $50.00 prep): gap +$230.00 — DIY wins by $230.00.
DIY 16 hourssame modelDIY $630.00 ($150.00 materials + 16 hours × $30.00) vs hiring $560.00 (8 hours × $45.00 + $150.00 materials + $50.00 prep): gap −$70.00 — HIRING wins by $70.00.
painter 12 hourssame modelDIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $740.00 (12 hours × $45.00 + $150.00 materials + $50.00 prep): gap +$290.00 — DIY wins by $290.00.
your time $50.00/hoursame modelDIY $650.00 ($150.00 materials + 10 hours × $50.00) vs hiring $560.00 (8 hours × $45.00 + $150.00 materials + $50.00 prep): gap −$90.00 — HIRING wins by $90.00.
prep $0.00same modelDIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $510.00 (8 hours × $45.00 + $150.00 materials + $0.00 prep): gap +$60.00 — DIY wins by $60.00.
prep $200.00same modelDIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $710.00 (8 hours × $45.00 + $150.00 materials + $200.00 prep): gap +$260.00 — DIY wins by $260.00.

Who uses this

  • The homeowner pricing a room repaint: they learn DIY costs $450.00 against $560.00 to hire — and they check the $31.25-an-hour reverse to see how far the painter’s rate would have to fall for hiring to tie.
  • The renter deciding whether to paint: they learn prep is the line that decides close jobs — with no prep DIY wins by only $60.00 — and they check the $90.00 prep reverse to see the prep cost where DIY wins by $150.00.
  • The homeowner with a slow weekend: they learn at 16 hours hiring wins by $70.00 — and they check the 13.67-hour reverse to see the smallest time whose DIY cost reaches the hiring total.
  • The DIYer valuing their evening: they learn value their time at $50.00 an hour and hiring wins by $90.00 — and they check the $36.00-an-hour reverse to see the exact value where DIY wins by $50.00.

Accuracy & limitations

The math is first-principles: the DIY cost is the paint & supplies plus your hours times what your time is worth, the hiring cost is the painter’s hours times the rate plus the paint & supplies plus the prep cost, and the gap is the hiring total minus the DIY total — each total rounded to cents half-up, and the gap computed from the rounded totals, so a gap of exactly $0.00 is a Tie. What the model cannot do is price your actual job: the hire total ignores the cost of waiting for a painter’s opening, which can be days on a small job; the DIY total ignores the cost of a finish you have to redo, which can cost more than hiring a painter in the first place; prep work — filling holes, sanding, taping, moving furniture — is where DIY jobs most often run over budget on time; a bad DIY paint job can cost more to fix than hiring a painter would have cost; never paint over a glossy surface without sanding or priming — the new paint will peel; and the rates here are typical ranges ($25–$75 an hour, $2–$6 per square foot), not a quote from your painter. Use it to find the cheaper side — then get a real quote before you decide.

Cite this calculatorBright Side Kit. “DIY vs Hire a Painter Calculator: Which Costs Less?” brightoolbox.com, 2026. Method: DIY cost = paint & supplies + your hours × what your time is worth per hour; hiring cost = painter hours × painter rate + paint & supplies + prep & repair cost; gap = hiring total − DIY total, computed from the ROUNDED totals; a gap of exactly $0.00 is a Tie. Reverses: painter rate for an exact tie is $31.25/hour (at $31.25/hour the figures are DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $450.00 (8 hours × $31.25 + $150.00 materials + $50.00 prep): gap $0.00 — Tie; at the lower neighbor the figures are DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $449.92 (8 hours × $31.24 + $150.00 materials + $50.00 prep): gap −$0.08 — HIRING wins by $0.08); smallest 2-decimal DIY hours whose DIY cost reaches the $560.00 hiring total is 13.67 hours (at 13.67 hours the figures are DIY $560.10 ($150.00 materials + 13.67 hours × $30.00) vs hiring $560.00 (8 hours × $45.00 + $150.00 materials + $50.00 prep): gap −$0.10 — HIRING wins by $0.10; at the lower neighbor the figures are DIY $559.80 ($150.00 materials + 13.66 hours × $30.00) vs hiring $560.00 (8 hours × $45.00 + $150.00 materials + $50.00 prep): gap +$0.20 — DIY wins by $0.20); smallest 2-decimal painter hours whose ROUNDED hiring total reaches the $450.00 DIY total is 5.56 hours (at 5.56 hours the figures are DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $450.20 (5.56 hours × $45.00 + $150.00 materials + $50.00 prep): gap +$0.20 — DIY wins by $0.20; at the lower neighbor the figures are DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $449.75 (5.55 hours × $45.00 + $150.00 materials + $50.00 prep): gap −$0.25 — HIRING wins by $0.25); your hourly value so DIY wins by exactly $50.00 is $36.00/hour (at $36.00/hour the figures are DIY $510.00 ($150.00 materials + 10 hours × $36.00) vs hiring $560.00 (8 hours × $45.00 + $150.00 materials + $50.00 prep): gap +$50.00 — DIY wins by $50.00; at the lower neighbor the figures are DIY $509.90 ($150.00 materials + 10 hours × $35.99) vs hiring $560.00 (8 hours × $45.00 + $150.00 materials + $50.00 prep): gap +$50.10 — DIY wins by $50.10); prep cost so DIY wins by exactly $150.00 is $90.00 (at $90.00 the figures are DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $600.00 (8 hours × $45.00 + $150.00 materials + $90.00 prep): gap +$150.00 — DIY wins by $150.00; at the lower neighbor the figures are DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $599.99 (8 hours × $45.00 + $150.00 materials + $89.99 prep): gap +$149.99 — DIY wins by $149.99); smallest 2-decimal DIY hours whose DIY cost reaches $660.00 (hiring wins by $100.00 at exactly $660.00) is 17.00 hours (at 17.00 hours the figures are DIY $660.00 ($150.00 materials + 17 hours × $30.00) vs hiring $560.00 (8 hours × $45.00 + $150.00 materials + $50.00 prep): gap −$100.00 — HIRING wins by $100.00; at the lower neighbor the figures are DIY $659.70 ($150.00 materials + 16.99 hours × $30.00) vs hiring $560.00 (8 hours × $45.00 + $150.00 materials + $50.00 prep): gap −$99.70 — HIRING wins by $99.70). Defaults: DIY $450.00 ($150.00 materials + 10 hours × $30.00) vs hiring $560.00 (8 hours × $45.00 + $150.00 materials + $50.00 prep): gap +$110.00 — DIY wins by $110.00 Bright Side Kit. "DIY vs Hire a Painter Calculator: Which Costs Less?" https://brightoolbox.com/diy-vs-hire-painter/ Accessed October 26, 2026.
Embed this calculator

Frequently asked questions

How much does it cost to hire a painter for a room?

$560.00 on the defaults, against $450.00 to do it yourself. The hiring cost is 8 hours at $45.00 an hour plus $150.00 of paint & supplies plus $50.00 of prep — a standard 12×12-foot room typically costs $300–$800 to paint professionally, paint included.

What do painters charge per hour?

Typically $25–$75 an hour. Painters also quote $2–$6 per square foot of wall; at $25.00 an hour the hiring cost here is $400.00 and hiring wins by $50.00.

When is hiring cheaper than painting it yourself?

When your time is worth enough — at 16 hours, hiring wins by $70.00. At 10 hours DIY wins by $110.00; at $50.00 an hour the DIY cost is $650.00 and hiring wins by $90.00.

What painter rate would tie the DIY cost?

$31.25 an hour. At $31.25 an hour the hiring cost is $450.00, the same as the DIY cost — an unusually low rate that shows how far the rate must fall for hiring to tie.

How many DIY hours would tie the hiring cost?

13.67 hours is the smallest 2-decimal time whose DIY cost reaches the $560.00 hiring total. At 13.67 hours the DIY cost is $560.10 and hiring wins by $0.10; at 13.66 hours the DIY cost is $559.80 and DIY wins by $0.20.

Does the materials cost change which side wins?

No. Paint & supplies appear on both sides, so at $300.00 of materials both sides rise by $150.00 and the gap stays $110.00.

How much does prep work change the answer?

Prep is the line that decides close jobs. With no prep DIY wins by $60.00; at $90.00 of prep DIY wins by $150.00; at $200.00 of prep DIY wins by $260.00.

How much paint do I need for a room?

A gallon covers about 350 square feet and costs $25–$70. Two coats are standard for a good finish, and new drywall needs a coat of primer first.