★ EVERYDAY · DIY · HOME

DIY vs Hire Bathroom Remodel: Cost Comparison Calculator

On the defaults — an 80 sq ft bathroom, $45.00 of materials per sq ft, $800 of supplies, 60 hours at $60 an hour, against a pro price of $175.00 per sq ft — remodeling it yourself costs $8,000.00 against a $14,000.00 pro quote: DIY wins by $6,000.00. Put in your own bathroom size, materials, supplies, hours, hourly value and pro price, and the calculator works out the DIY cost, the pro cost, and who wins by how much. No bathroom-REMODEL comparison exists on the site — the pergola, shed, deck and patio DIY-vs-hire pages price different jobs, and no bathroom page prices remodeling one at all. This one prices remodeling an 80 sq ft bathroom from scratch — materials, supplies and your hours — against a pro price per square foot.

1182

DIY vs hire bathroom remodel calculator

DIY cost = sq ft × materials per sq ft + supplies + hours × hourly value; pro cost = sq ft × pro price per sq ft. A pro bathroom remodel is usually priced per square foot — and a typical small bathroom is 40–100 square feet. A pro bathroom remodel usually runs $100–$250 per square foot depending on the fixtures and finishes, so an 80 sq ft pro job commonly lands between $8,000 and $20,000. Labour is often 40–60% of the pro price, which is why doing it yourself saves so much on paper — but a pro crew finishes in one to two weeks while a DIYer working evenings and weekends can take two to three months. Common DIY materials: tile, vanity, toilet, faucet and shower fixtures, paint, and flooring. The risks of doing it yourself: a shower or tub surround that is not waterproofed properly leaks into the floor below, plumbing connections that are not sealed properly drip behind the wall, electrical work that does not meet code fails inspection, and a remodel without the right permits causes problems when the home is sold. A bathroom remodel is worth doing yourself when it is a cosmetic refresh — new paint, new fixtures, new flooring, no walls moving — the bathroom is small, and you have time. A pro is worth it when plumbing or drains move, the shower or tub is rebuilt, structural work is involved, the deadline is tight, or the warranty matters — most pro jobs carry a labour warranty the DIY route does not. If the DIY cost and the pro cost are equal, that is a dead heat, not a win either way; all listed in Accuracy & limitations.

The bathroom size in square feet — the default is 80 sq ft.

The materials cost per sq ft — the default is $45.00.

The supplies cost — the default is $800.00.

The hours you will spend — the default is 60.

What an hour of your time is worth — the default is $60.00.

The pro price per sq ft — the default is $175.00.

DIY $8,000.00; pro $14,000.00 — DIY wins by $6,000.00DIY $8,000.00; pro $14,000.00 — DIY wins by $6,000.00DIY $8,000.00; pro $14,000.00 — DIY wins by $6,000.00. On an 80 sq ft bathroom, remodeling it yourself costs $8,000.00 against a $14,000.00 pro quote — DIY wins by $6,000.00.

Bathroom size: 80 sq ft

Materials per sq ft: $45.00

Supplies: $800.00

Your hours: 60

Your hourly value: $60.00

Pro price per sq ft: $175.00

DIY cost: $8,000.00

Pro cost: $14,000.00

DIY wins by: $6,000.00

Branch: Hours 30: DIY $6,200.00; pro $14,000.00 — DIY wins by $7,800.00

Branch: Hours 90: DIY $9,800.00; pro $14,000.00 — DIY wins by $4,200.00

Branch: Materials $30.00 per square foot: DIY $6,800.00; pro $14,000.00 — DIY wins by $7,200.00

Branch: Materials $70.00 per square foot: DIY $10,000.00; pro $14,000.00 — DIY wins by $4,000.00

Branch: Hours 160: DIY $14,000.00; pro $14,000.00 — exact tie

Branch: Materials $120.00 per square foot: DIY $14,000.00; pro $14,000.00 — exact tie

Branch: Hours 80: DIY $9,200.00; pro $14,000.00 — DIY wins by $4,800.00

Reverse: Smallest whole-dollar hourly value where hiring WINS: $161

Reverse: Smallest whole-dollar hourly value where hiring WINS (rounded): $161

At $161 the figures are: DIY $14,060.00; pro $14,000.00 — Hiring wins by $60.00

At the lower neighbor the figures are: DIY $14,000.00; pro $14,000.00 — exact tie

At the upper neighbor the figures are: DIY $14,120.00; pro $14,000.00 — Hiring wins by $120.00

Reverse verdict: STEP

Reverse: Largest whole-dollar hourly value where DIY still wins by at least $1,000.00: $143

Reverse: Largest whole-dollar hourly value where DIY still wins by at least $1,000.00 (rounded): $143

At $143 the figures are: DIY $12,980.00; pro $14,000.00 — DIY wins by $1,020.00

At the lower neighbor the figures are: DIY $12,920.00; pro $14,000.00 — DIY wins by $1,080.00

At the upper neighbor the figures are: DIY $13,040.00; pro $14,000.00 — DIY wins by $960.00

Reverse verdict: STEP

Reverse: Smallest whole-dollar supplies where hiring WINS: $6,801

Reverse: Smallest whole-dollar supplies where hiring WINS (rounded): $6,801

At $6,801 the figures are: DIY $14,001.00; pro $14,000.00 — Hiring wins by $1.00

At the lower neighbor the figures are: DIY $14,000.00; pro $14,000.00 — exact tie

At the upper neighbor the figures are: DIY $14,002.00; pro $14,000.00 — Hiring wins by $2.00

Reverse verdict: STEP

Reverse: Smallest whole-cent materials per square foot where hiring WINS: $120.01

Reverse: Smallest whole-cent materials per square foot where hiring WINS (rounded): $120.01

At $120.01 the figures are: DIY $14,000.80; pro $14,000.00 — Hiring wins by $0.80

At the lower neighbor the figures are: DIY $14,000.00; pro $14,000.00 — exact tie

At the upper neighbor the figures are: DIY $14,001.60; pro $14,000.00 — Hiring wins by $1.60

Reverse verdict: STEP

Reverse: Smallest whole-hour hours where hiring WINS: 161 hours

Reverse: Smallest whole-hour hours where hiring WINS (rounded): 161 hours

At 161 hours the figures are: DIY $14,060.00; pro $14,000.00 — Hiring wins by $60.00

At the lower neighbor the figures are: DIY $14,000.00; pro $14,000.00 — exact tie

At the upper neighbor the figures are: DIY $14,120.00; pro $14,000.00 — Hiring wins by $120.00

Reverse verdict: STEP

Reverse: Smallest whole-dollar pro price per square foot where DIY wins at all: $101

Reverse: Smallest whole-dollar pro price per square foot where DIY wins at all (rounded): $101

At $101 the figures are: DIY $8,000.00; pro $8,080.00 — DIY wins by $80.00

At the lower neighbor the figures are: DIY $8,000.00; pro $8,000.00 — exact tie

At the upper neighbor the figures are: DIY $8,000.00; pro $8,160.00 — DIY wins by $160.00

Reverse verdict: STEP

Edge: Square feet 0, materials $0, supplies $0, hours 0, hourly value $0: DIY $0.00; pro $0.00 — exact tie

Edge: Square feet 50, materials $40.00, supplies $500, hours 25, hourly value $50, pro $160.00 per square foot: DIY $3,750.00; pro $8,000.00 — DIY wins by $4,250.00

Edge: Square feet 65, materials $52.375, supplies $437.50, hours 18.5, hourly value $75.50, pro $188.75 per square foot: DIY $5,238.63; pro $12,268.75 — DIY wins by $7,030.13

Edge: Materials $110.00 per square foot, supplies $1,200, hours 80, hourly value $85, pro $175.00 per square foot: DIY $16,800.00; pro $14,000.00 — Hiring wins by $2,800.00

Edge: Hours 0: DIY $4,400.00; pro $14,000.00 — DIY wins by $9,600.00

Edge: Hours 18.5: DIY $5,510.00; pro $14,000.00 — DIY wins by $8,490.00

Edge: Win-by bars: hourly value for a $1,500.00 DIY win $135.00; pro price per square foot for a $2,000.00 DIY win $125.00; materials per square foot for a $3,000.00 DIY win $82.50

DIY $8,000.00; pro $14,000.00 — DIY wins by $6,000.00. On the defaults remodeling it yourself costs $8,000.00 against a $14,000.00 pro quote — DIY wins by $6,000.00. If your hourly value rose to $161, hiring would win by $60.00 — and at $160 DIY costs $14,000.00, exactly the pro cost — a dead heat, a TIE.

Hours 30: DIY $6,200.00; pro $14,000.00 — DIY wins by $7,800.00.

Hours 90: DIY $9,800.00; pro $14,000.00 — DIY wins by $4,200.00.

Materials $30.00 per square foot: DIY $6,800.00; pro $14,000.00 — DIY wins by $7,200.00.

Materials $70.00 per square foot: DIY $10,000.00; pro $14,000.00 — DIY wins by $4,000.00.

Hours 160: DIY $14,000.00; pro $14,000.00 — exact tie.

Materials $120.00 per square foot: DIY $14,000.00; pro $14,000.00 — exact tie.

Hours 80: DIY $9,200.00; pro $14,000.00 — DIY wins by $4,800.00.

Reverse: The smallest whole-dollar hourly value where hiring WINS is $161; at $161 the figures are DIY $14,060.00; pro $14,000.00 — Hiring wins by $60.00; at the lower neighbor the figures are DIY $14,000.00; pro $14,000.00 — exact tie — verdict: STEP. Reverse: The largest whole-dollar hourly value where DIY still wins by at least $1,000.00 is $143; at $143 the figures are DIY $12,980.00; pro $14,000.00 — DIY wins by $1,020.00; at the upper neighbor the figures are DIY $13,040.00; pro $14,000.00 — DIY wins by $960.00 — verdict: STEP. Reverse: The smallest whole-dollar supplies where hiring WINS is $6,801; at $6,801 the figures are DIY $14,001.00; pro $14,000.00 — Hiring wins by $1.00; at the lower neighbor the figures are DIY $14,000.00; pro $14,000.00 — exact tie — verdict: STEP. Reverse: The smallest whole-cent materials per square foot where hiring WINS is $120.01; at $120.01 the figures are DIY $14,000.80; pro $14,000.00 — Hiring wins by $0.80; at the lower neighbor the figures are DIY $14,000.00; pro $14,000.00 — exact tie — verdict: STEP. Reverse: The smallest whole-hour hours where hiring WINS is 161 hours; at 161 the figures are DIY $14,060.00; pro $14,000.00 — Hiring wins by $60.00; at the lower neighbor the figures are DIY $14,000.00; pro $14,000.00 — exact tie — verdict: STEP. Reverse: The smallest whole-dollar pro price per square foot where DIY wins at all is $101; at $101 the figures are DIY $8,000.00; pro $8,080.00 — DIY wins by $80.00; at the lower neighbor the figures are DIY $8,000.00; pro $8,000.00 — exact tie — verdict: STEP.

Edges: Square feet 0, materials $0, supplies $0, hours 0, hourly value $0 gives DIY $0.00; pro $0.00 — exact tie. Square feet 50, materials $40.00, supplies $500, hours 25, hourly value $50, pro $160.00 per square foot gives DIY $3,750.00; pro $8,000.00 — DIY wins by $4,250.00. Square feet 65, materials $52.375, supplies $437.50, hours 18.5, hourly value $75.50, pro $188.75 per square foot gives DIY $5,238.63; pro $12,268.75 — DIY wins by $7,030.13. Materials $110.00 per square foot, supplies $1,200, hours 80, hourly value $85, pro $175.00 per square foot gives DIY $16,800.00; pro $14,000.00 — Hiring wins by $2,800.00. Hours 0 gives DIY $4,400.00; pro $14,000.00 — DIY wins by $9,600.00. Hours 18.5 gives DIY $5,510.00; pro $14,000.00 — DIY wins by $8,490.00. Win-by bars — DIY $8,000.00 gives hourly value for a $1,500.00 DIY win $135.00; pro price per square foot for a $2,000.00 DIY win $125.00; materials per square foot for a $3,000.00 DIY win $82.50.

Is DIY cheaper for a bathroom remodel?

On the defaults — an 80 sq ft bathroom, $45.00 of materials per sq ft, $800 of supplies, 60 hours at $60 an hour, against a pro price of $175.00 per sq ft — remodeling it yourself costs $8,000.00 against a $14,000.00 pro quote: DIY wins by $6,000.00. A pro bathroom remodel is usually priced per square foot — and a typical small bathroom is 40–100 square feet. A pro bathroom remodel usually runs $100–$250 per square foot depending on the fixtures and finishes, so an 80 sq ft pro job commonly lands between $8,000 and $20,000. An 80 sq ft bathroom is a middle-of-the-road job — big enough to matter, small enough to remodel yourself. DIY is worth it when the remodel is a cosmetic refresh — new paint, new fixtures, new flooring, no walls moving — the bathroom is small and you have time; hire a pro when plumbing or drains move, the shower or tub is rebuilt, structural work is involved, the deadline is tight, or the warranty matters — most pro jobs carry a labour warranty the DIY route does not.

Three things about the model are worth stating plainly.

First, the DIY cost is 80 × $45.00 + $800 + 60 × $60 = $8,000.00. Second, the pro cost is 80 × $175.00 = $14,000.00. And third, DIY wins by $6,000.00; all listed in Accuracy & limitations.

The worked example, line by line

Setup: 80 sq ft bathroom, $45.00 of materials per sq ft, $800 of supplies, 60 hours at $60 an hour, pro price $175.00 per sq ft.

Line 1 — the DIY cost. The DIY cost is 80 × $45.00 = $3,600.00 of materials, + $800.00 of supplies, + 60 × $60.00 = $3,600.00 of labour = $8,000.00.

Line 2 — the pro cost. The pro cost is 80 × $175.00 = $14,000.00.

Line 3 — who wins. $14,000.00 − $8,000.00 = $6,000.00, so DIY wins by $6,000.00.

Line 4 — the check. $3,600.00 + $800.00 + $3,600.00 = $8,000.00, the DIY cost; and $14,000.00 − $8,000.00 = $6,000.00, the DIY win.

Every branch, checked

Hours 30: DIY $6,200.00; pro $14,000.00 — DIY wins by $7,800.00 — With 30 hours instead of 60 the DIY cost falls to $6,200.00 and DIY wins by $7,800.00.

Hours 90: DIY $9,800.00; pro $14,000.00 — DIY wins by $4,200.00 — With 90 hours the DIY cost rises to $9,800.00 and DIY wins by $4,200.00.

Materials $30.00: DIY $6,800.00; pro $14,000.00 — DIY wins by $7,200.00 — With materials at $30.00 per sq ft the DIY cost falls to $6,800.00 and DIY wins by $7,200.00.

Materials $70.00: DIY $10,000.00; pro $14,000.00 — DIY wins by $4,000.00 — With materials at $70.00 per sq ft the DIY cost rises to $10,000.00 and DIY wins by only $4,000.00.

Hours 160: DIY $14,000.00; pro $14,000.00 — exact tie — With 160 hours the DIY cost is $14,000.00, exactly the pro cost — a dead heat, a TIE.

Materials $120.00: DIY $14,000.00; pro $14,000.00 — exact tie — With materials at $120.00 per sq ft the DIY cost is $14,000.00, exactly the pro cost — a dead heat, a TIE.

Hours 80: DIY $9,200.00; pro $14,000.00 — DIY wins by $4,800.00 — With 80 hours the DIY cost is $9,200.00 and DIY wins by $4,800.00.

The reverses, worked backwards

Smallest hourly value where hiring WINS: At the displayed $161 the figures are DIY $14,060.00; pro $14,000.00 — Hiring wins by $60.00. At the displayed $161 the DIY cost is $14,060.00 against a $14,000.00 pro quote, so hiring wins by $60.00. At $160 the DIY cost is $14,000.00, exactly the pro cost — a dead heat, a TIE — so $161 is the smallest hourly value where hiring wins.

Largest hourly value where DIY still wins by at least $1,000: At the displayed $143 the figures are DIY $12,980.00; pro $14,000.00 — DIY wins by $1,020.00. At the displayed $143 the DIY cost is $12,980.00 and DIY wins by $1,020.00. At $144 the DIY cost is $13,040.00 and DIY wins by only $960.00 — under the $1,000 target — so $143 is the largest hourly value where DIY still wins by at least $1,000.

Smallest supplies where hiring WINS: At the displayed $6,801 the figures are DIY $14,001.00; pro $14,000.00 — Hiring wins by $1.00. At the displayed $6,801 the DIY cost is $14,001.00 against a $14,000.00 pro quote, so hiring wins by $1.00. At $6,800 the DIY cost is $14,000.00, exactly the pro cost — a dead heat, a TIE — so $6,801 is the smallest supplies where hiring wins.

Smallest whole-cent materials where hiring WINS: At the displayed $120.01 the figures are DIY $14,000.80; pro $14,000.00 — Hiring wins by $0.80. At the displayed $120.01 the DIY cost is $14,000.80 against a $14,000.00 pro quote, so hiring wins by $0.80. At $120.00 the DIY cost is $14,000.00, exactly the pro cost — a dead heat, a TIE — so $120.01 is the smallest whole-cent materials where hiring wins.

Smallest hours where hiring WINS: At the displayed 161 the figures are DIY $14,060.00; pro $14,000.00 — Hiring wins by $60.00. At the displayed 161 hours the DIY cost is $14,060.00 against a $14,000.00 pro quote, so hiring wins by $60.00. At 160 hours the DIY cost is $14,000.00, exactly the pro cost — a dead heat, a TIE — so 161 is the smallest hours where hiring wins.

Smallest pro price per sq ft where DIY wins at all: At the displayed $101 the figures are DIY $8,000.00; pro $8,080.00 — DIY wins by $80.00. At the displayed $101 per sq ft the pro cost is $8,080.00 against an $8,000.00 DIY cost, so DIY wins by $80.00. At $100 per sq ft the pro cost is $8,000.00 — a dead heat, a TIE, not a DIY win. At $99 per sq ft the pro cost is $7,920.00 and hiring wins by $80.00 — so $101 is the smallest pro price where DIY wins at all.

A warning about the neighbours: every neighbour above sits one step from the star — $1 of supplies, one cent of materials, one hour, one dollar of hourly value, one dollar of pro price. A pro quote that moves by a dollar changes the answer. The page prints the neighbour values in full so the rounding does not mislead you: at $160 the DIY cost is $14,000.00, a dead heat; at $144 DIY wins by only $960.00; at $6,800 the DIY cost is $14,000.00, a dead heat; at $120.00 the DIY cost is $14,000.00, a dead heat; at 160 hours the DIY cost is $14,000.00, a dead heat; at $100 per sq ft the pro cost is $8,000.00, a dead heat; at $99 per sq ft the pro cost is $7,920.00 and hiring wins by $80.00.

What the defaults assume

The defaults are an 80 sq ft bathroom, $45.00 of materials per sq ft, $800 of supplies, 60 hours at $60 an hour, and a pro price of $175.00 per sq ft — DIY $8,000.00; pro $14,000.00 — DIY wins by $6,000.00. With Hours 30, DIY $6,200.00; pro $14,000.00 — DIY wins by $7,800.00. With Hours 90, DIY $9,800.00; pro $14,000.00 — DIY wins by $4,200.00. With Materials $30.00, DIY $6,800.00; pro $14,000.00 — DIY wins by $7,200.00. With Materials $70.00, DIY $10,000.00; pro $14,000.00 — DIY wins by $4,000.00. With Hours 160, DIY $14,000.00; pro $14,000.00 — exact tie. With Materials $120.00, DIY $14,000.00; pro $14,000.00 — exact tie. With Hours 80, DIY $9,200.00; pro $14,000.00 — DIY wins by $4,800.00. With All zero, DIY $0.00; pro $0.00 — exact tie. With 50 sq ft, materials $40.00, supplies $500, hours 25, hourly $50, pro $160.00, DIY $3,750.00; pro $8,000.00 — DIY wins by $4,250.00. With 65 sq ft, materials $52.375, supplies $437.50, hours 18.5, hourly $75.50, pro $188.75, DIY $5,238.63; pro $12,268.75 — DIY wins by $7,030.13. With Materials $110.00, supplies $1,200, hours 80, hourly $85, pro $175.00, DIY $16,800.00; pro $14,000.00 — Hiring wins by $2,800.00. With Hours 0, DIY $4,400.00; pro $14,000.00 — DIY wins by $9,600.00. With Hours 18.5, DIY $5,510.00; pro $14,000.00 — DIY wins by $8,490.00. With Win-by bars, hourly value for a $1,500.00 DIY win $135.00; pro price per square foot for a $2,000.00 DIY win $125.00; materials per square foot for a $3,000.00 DIY win $82.50.

A note on the rounding: with 65 sq ft, materials $52.375, supplies $437.50, 18.5 hours at $75.50 an hour and a pro price of $188.75 per sq ft, the unrounded DIY cost is 5238.625 — which rounds half-up to $5,238.63 — and the unrounded win is 7030.125 — which rounds half-up to $7,030.13. The page prints the unrounded values so the rounding does not mislead you.

Output · formula · meaning

OutputFormulaWhat it means
Bathroom sizeinput80 sq ft.
Materials per sq ftinput$45.00.
Suppliesinput$800.00.
Your hoursinput60.
Your hourly valueinput$60.00.
Pro price per sq ftinput$175.00.
DIY costsq ft × materials per sq ft + supplies + hours × hourly value$8,000.00.
Pro costsq ft × pro price per sq ft$14,000.00.
Differencepro cost − DIY cost$6,000.00.
Reverse: Smallest whole-dollar hourly value where hiring WINSstep$161 → $161.
Below the revr1 starneighborDIY $14,000.00; pro $14,000.00 — exact tie.
Above the revr1 starneighborDIY $14,120.00; pro $14,000.00 — Hiring wins by $120.00.
Reverse: Largest whole-dollar hourly value where DIY still wins by at least $1,000.00step$143 → $143.
Below the revr2 starneighborDIY $12,920.00; pro $14,000.00 — DIY wins by $1,080.00.
Above the revr2 starneighborDIY $13,040.00; pro $14,000.00 — DIY wins by $960.00.
Reverse: Smallest whole-dollar supplies where hiring WINSstep$6,801 → $6,801.
Below the revr3 starneighborDIY $14,000.00; pro $14,000.00 — exact tie.
Above the revr3 starneighborDIY $14,002.00; pro $14,000.00 — Hiring wins by $2.00.
Reverse: Smallest whole-cent materials per square foot where hiring WINSstep$120.01 → $120.01.
Below the revr4 starneighborDIY $14,000.00; pro $14,000.00 — exact tie.
Above the revr4 starneighborDIY $14,001.60; pro $14,000.00 — Hiring wins by $1.60.
Reverse: Smallest whole-hour hours where hiring WINSstep161 hours → 161 hours.
Below the revr5 starneighborDIY $14,000.00; pro $14,000.00 — exact tie.
Above the revr5 starneighborDIY $14,120.00; pro $14,000.00 — Hiring wins by $120.00.
Reverse: Smallest whole-dollar pro price per square foot where DIY wins at allstep$101 → $101.
Below the revr6 starneighborDIY $8,000.00; pro $8,000.00 — exact tie.
Above the revr6 starneighborDIY $8,000.00; pro $8,160.00 — DIY wins by $160.00.
Hours 30same modelDIY $6,200.00; pro $14,000.00 — DIY wins by $7,800.00.
Hours 90same modelDIY $9,800.00; pro $14,000.00 — DIY wins by $4,200.00.
Materials $30.00 per square footsame modelDIY $6,800.00; pro $14,000.00 — DIY wins by $7,200.00.
Materials $70.00 per square footsame modelDIY $10,000.00; pro $14,000.00 — DIY wins by $4,000.00.
Hours 160same modelDIY $14,000.00; pro $14,000.00 — exact tie.
Materials $120.00 per square footsame modelDIY $14,000.00; pro $14,000.00 — exact tie.
Hours 80same modelDIY $9,200.00; pro $14,000.00 — DIY wins by $4,800.00.

Who uses this

  • The homeowner with a small bathroom: they learn remodeling an 80 sq ft bathroom themselves costs $8,000.00 against a $14,000.00 pro quote — and they check the $161 reverse to see the hourly value where hiring wins.
  • The DIYer pricing tile and fixtures: they learn a pro bathroom remodel usually runs $100–$250 per square foot — and they check the $120.01 reverse to see the materials price where hiring wins.
  • The busy parent with no weekends free: they learn a pro crew finishes in one to two weeks while a DIYer takes two to three months — and they check the 161 reverse to see the hours where hiring wins.
  • The buyer comparing quotes: they learn an 80 sq ft pro job commonly lands between $8,000 and $20,000 — and they check the $101 reverse to see the pro price where DIY wins at all.

Accuracy & limitations

The math is first-principles: the DIY cost is sq ft × materials per sq ft + supplies + hours × hourly value; the pro cost is sq ft × pro price per sq ft; the winner is the lower cost, and equal costs are a dead heat — all rounded to two decimals half-up. What the model cannot do is price your bathroom: pro prices vary by region and by fixture — a pro bathroom remodel usually runs $100–$250 per square foot depending on the fixtures and finishes; materials vary by grade; the hourly value is your own time, so price it honestly — an hour of your weekend is worth more than an hour you would spend idle. The model also cannot see the plumbing: a shower or tub surround that is not waterproofed properly leaks into the floor below, plumbing connections that are not sealed properly drip behind the wall, electrical work that does not meet code fails inspection, and a remodel without the right permits causes problems when the home is sold — all risks the calculator cannot price; and it does not include permits, inspections, or a pro’s labour warranty. Use it to see the money — then walk the bathroom before you decide.

Cite this calculatorBright Side Kit. “DIY vs Hire Bathroom Remodel: Cost Comparison Calculator” brightoolbox.com, 2026. Method: DIY cost = sq ft × materials per sq ft + supplies + hours × hourly value; pro cost = sq ft × pro price per sq ft; DIY wins when the DIY cost is below the pro cost; equal costs are a dead heat. Reverses: smallest hourly value where hiring WINS is $161 (at $161 the DIY cost is $14,060.00 against a $14,000.00 pro quote, so hiring wins by $60.00; at $160 the DIY cost is $14,000.00, exactly the pro cost — a dead heat, a TIE); largest hourly value where DIY still wins by at least $1,000 is $143 (at $143 the DIY cost is $12,980.00 and DIY wins by $1,020.00; at $144 the DIY cost is $13,040.00 and DIY wins by only $960.00); smallest supplies where hiring WINS is $6,801 (at $6,801 the DIY cost is $14,001.00 against a $14,000.00 pro quote, so hiring wins by $1.00; at $6,800 the DIY cost is $14,000.00, exactly the pro cost — a dead heat, a TIE); smallest whole-cent materials where hiring WINS is $120.01 (at $120.01 the DIY cost is $14,000.80 against a $14,000.00 pro quote, so hiring wins by $0.80; at $120.00 the DIY cost is $14,000.00, exactly the pro cost — a dead heat, a TIE); smallest hours where hiring WINS is 161 (at 161 hours the DIY cost is $14,060.00 against a $14,000.00 pro quote, so hiring wins by $60.00; at 160 hours the DIY cost is $14,000.00, exactly the pro cost — a dead heat, a TIE); smallest pro price per sq ft where DIY wins at all is $101 (at $101 per sq ft the pro cost is $8,080.00 against an $8,000.00 DIY cost, so DIY wins by $80.00; at $100 per sq ft the pro cost is $8,000.00 — a dead heat, a TIE; at $99 per sq ft the pro cost is $7,920.00 and hiring wins by $80.00). Defaults: DIY $8,000.00; pro $14,000.00 — DIY wins by $6,000.00 Bright Side Kit. "DIY vs Hire Bathroom Remodel: Cost Comparison Calculator" https://brightoolbox.com/diy-vs-hire-bathroom-remodel/ Accessed October 27, 2026.
Embed this calculator

Frequently asked questions

How much does it cost to remodel a bathroom yourself?

$8,000.00 for an 80 sq ft bathroom. 80 × $45.00 of materials is $3,600.00, plus $800 of supplies, plus 60 hours at $60 an hour is $3,600.00 — $8,000.00 in all.

How much does a pro charge to remodel a bathroom?

$14,000.00 for an 80 sq ft bathroom. A pro bathroom remodel usually runs $100–$250 per square foot; at $175.00 per sq ft an 80 sq ft bathroom is $14,000.00. An 80 sq ft pro job commonly lands between $8,000 and $20,000.

Is it cheaper to remodel a bathroom yourself?

Yes, on the defaults — by $6,000.00. DIY costs $8,000.00 against a $14,000.00 pro quote. But the answer flips if your time is expensive: at an hourly value of $161, hiring wins by $60.00.

When should I hire a pro instead?

When plumbing or drains move, the shower or tub is rebuilt, structural work is involved, the deadline is tight, or the warranty matters. A pro crew finishes in one to two weeks; a DIYer takes two to three months — and most pro jobs carry a labour warranty the DIY route does not.

What materials does a DIY bathroom remodel need?

Tile, vanity, toilet, faucet and shower fixtures, paint, and flooring. On the defaults the materials cost $3,600.00 for an 80 sq ft bathroom.

How long does a DIY bathroom remodel take?

Two to three months working evenings and weekends. A pro crew finishes in one to two weeks — the DIY route trades money for time.

What if the DIY cost and the pro cost are equal?

That is a dead heat, a TIE. At 160 hours, or at materials of $120.00 per sq ft, or at supplies of $6,800, the DIY cost is $14,000.00 — exactly the pro cost — so neither side wins.

Why does the calculator show $5,238.63 for the edge case?

Because the unrounded DIY cost is 5238.625. With 65 sq ft, materials $52.375, supplies $437.50, 18.5 hours at $75.50 an hour and a pro price of $188.75 per sq ft, the unrounded DIY cost is 5238.625 — which rounds half-up to $5,238.63 — and the unrounded win is 7030.125 — which rounds half-up to $7,030.13. The page prints the unrounded values so the rounding does not mislead you.