★ EVERYDAY · HOME · DIY VS HIRE

DIY vs Hire Door Installation: Compare the Real Cost

On the defaults — 2 doors at $220.00 of materials each, $45.00 of supplies and 5 hours of your time at $35.00 an hour — installing the doors costs $660.00 to do yourself, against a $800.00 pro cost, so DIY wins by $140.00. Put in your own doors, materials, supplies, hours, hourly value and pro price per door, and the calculator prices both ways. No door-installation comparison of any kind exists on the site — the handyman comparison prices odd jobs, the electrician comparison prices wiring work, the painter comparison prices painting, the plumber comparison prices plumbing, and the window-replacement comparison (run 425) prices replacing windows. This one prices materials per door + supplies + your hours against a pro price per door for installing doors. This is DIY-vs-hire comparison #304.

1152

DIY vs hire door installation calculator

DIY cost = doors × materials per door + supplies + hours × your hourly value. Pro cost = doors × pro price per door. A typical pro door installation runs $150–$500 or more per door installed, depending on the door — a pre-hung interior door is usually $150–$350 fitted, an exterior door $500–$1,000 or more because it needs weatherproofing, and custom sizes or second-storey work add labour. Common DIY materials: the pre-hung door itself $150–$400, shims, screws, caulk, trim and insulation foam $30–$60 a door. A door replacement is worth doing yourself when the doors are standard sizes, pre-hung, the frames are sound, and you have basic tools (level, drill, shims, pry bar). A pro is worth it for exterior doors, custom or arched shapes, rotten frames, structural work, or when the warranty matters — most pro jobs carry a labour warranty the DIY route does not. Energy-efficient exterior doors can cut heating and cooling bills, but the payback takes years — the saving is not a reason to replace sound doors early; all listed in Accuracy & limitations.

How many doors you are installing — the default is 2.

The door and its materials per door — the default is $220.00.

Shims, screws, caulk, trim and foam — the default is $45.00.

How long the installation takes you — the default is 5 hours.

What an hour of your time is worth — the default is $35.00.

The pro price per door installed — the default is $400.00.

DIY $660.00; pro $800.00 — DIY wins by $140.00DIY $660.00; pro $800.00 — DIY wins by $140.00DIY $660.00; pro $800.00 — DIY wins by $140.00. On 2 doors at $220.00 of materials each, $45.00 of supplies and 5 hours at $35.00 an hour, the DIY cost is $660.00 against a $800.00 pro cost — DIY wins by $140.00.

Doors: 2

Materials per door: $220.00

Supplies: $45.00

Hours: 5

Hourly value: $35.00

Pro price per door: $400.00

DIY cost: $660.00

Pro cost: $800.00

Winner: DIY wins by $140.00

Branch: Hours 10: DIY $835.00; pro $800.00 — Hiring wins by $35.00

Branch: Materials $300 per door: DIY $820.00; pro $800.00 — Hiring wins by $20.00

Branch: Hourly value $60: DIY $785.00; pro $800.00 — DIY wins by $15.00

Branch: Pro price $300 per door: DIY $660.00; pro $600.00 — Hiring wins by $60.00

Branch: Doors 4: DIY $1,100.00; pro $1,600.00 — DIY wins by $500.00

Branch: Materials $400 per door: DIY $1,020.00; pro $800.00 — Hiring wins by $220.00

Branch: Supplies $0, hours 3, hourly value $25: DIY $515.00; pro $800.00 — DIY wins by $285.00

Reverse: Smallest whole-dollar hourly value where hiring WINS: $64.00

Reverse: Smallest whole-dollar hourly value where hiring WINS (rounded): $64.00

At $64.00 the figures are: DIY $805.00; pro $800.00 — Hiring wins by $5.00

At the lower neighbor the figures are: DIY $800.00; pro $800.00 — exact tie

At the upper neighbor the figures are: DIY $810.00; pro $800.00 — Hiring wins by $10.00

Reverse verdict: STEP

Reverse: Largest whole-dollar hourly value where DIY still wins by at least $100.00: $43.00

Reverse: Largest whole-dollar hourly value where DIY still wins by at least $100.00 (rounded): $43.00

At $43.00 the figures are: DIY $700.00; pro $800.00 — DIY wins by $100.00

At the lower neighbor the figures are: DIY $695.00; pro $800.00 — DIY wins by $105.00

At the upper neighbor the figures are: DIY $705.00; pro $800.00 — DIY wins by $95.00

Reverse verdict: STEP

Reverse: Smallest whole-dollar pro price per door where DIY wins by at least $100.00: $380.00

Reverse: Smallest whole-dollar pro price per door where DIY wins by at least $100.00 (rounded): $380.00

At $380.00 the figures are: DIY $660.00; pro $760.00 — DIY wins by $100.00

At the lower neighbor the figures are: DIY $660.00; pro $758.00 — DIY wins by $98.00

At the upper neighbor the figures are: DIY $660.00; pro $762.00 — DIY wins by $102.00

Reverse verdict: STEP

Reverse: Smallest whole-dollar materials per door where hiring WINS: $291.00

Reverse: Smallest whole-dollar materials per door where hiring WINS (rounded): $291.00

At $291.00 the figures are: DIY $802.00; pro $800.00 — Hiring wins by $2.00

At the lower neighbor the figures are: DIY $800.00; pro $800.00 — exact tie

At the upper neighbor the figures are: DIY $804.00; pro $800.00 — Hiring wins by $4.00

Reverse verdict: STEP

Reverse: Smallest whole-dollar supplies where hiring WINS: $186.00

Reverse: Smallest whole-dollar supplies where hiring WINS (rounded): $186.00

At $186.00 the figures are: DIY $801.00; pro $800.00 — Hiring wins by $1.00

At the lower neighbor the figures are: DIY $800.00; pro $800.00 — exact tie

At the upper neighbor the figures are: DIY $802.00; pro $800.00 — Hiring wins by $2.00

Reverse verdict: STEP

Reverse: Smallest whole-hours value where hiring WINS: 10 hours

Reverse: Smallest whole-hours value where hiring WINS (rounded): 10 hours

At 10 hours the figures are: DIY $835.00; pro $800.00 — Hiring wins by $35.00

At the lower neighbor the figures are: DIY $800.00; pro $800.00 — exact tie

At the upper neighbor the figures are: DIY $870.00; pro $800.00 — Hiring wins by $70.00

Reverse verdict: STEP

Edge: Doors 1, everything $0: DIY $0.00; pro $400.00 — DIY wins by $400.00

Edge: Hours 0, hourly value $0: DIY $485.00; pro $800.00 — DIY wins by $315.00

Edge: Doors 3, materials $187.45, supplies $62.38, hours 7.5, hourly value $48.25, pro $425: DIY $986.61; pro $1,275.00 — DIY wins by $288.40

Edge: Pro price $330 per door: DIY $660.00; pro $660.00 — exact tie

Edge: Hourly value $110, hours 8: DIY $1,365.00; pro $800.00 — Hiring wins by $565.00

Edge: Pro price $550 per door: DIY $660.00; pro $1,100.00 — DIY wins by $440.00

Edge: Win-by bars — DIY $660.00: pro price per door for a $100.00 DIY win $380.00; for a $300.00 DIY win $480.00; materials per door for a $100.00 DIY win $240.00

DIY $660.00; pro $800.00 — DIY wins by $140.00. On the defaults DIY wins by $140.00. The deciding input is your hourly value: at $64.00 an hour hiring wins by $5.00, and at $63.00 an hour the two ways tie exactly, a dead heat. With 10 hours the answer flips to hiring, winning by $35.00 — and at $290.00 of materials a door the two ways tie exactly, a dead heat.

Hours 10: DIY $835.00; pro $800.00 — Hiring wins by $35.00.

Materials $300 per door: DIY $820.00; pro $800.00 — Hiring wins by $20.00.

Hourly value $60: DIY $785.00; pro $800.00 — DIY wins by $15.00.

Pro price $300 per door: DIY $660.00; pro $600.00 — Hiring wins by $60.00.

Doors 4: DIY $1,100.00; pro $1,600.00 — DIY wins by $500.00.

Materials $400 per door: DIY $1,020.00; pro $800.00 — Hiring wins by $220.00.

Supplies $0, hours 3, hourly value $25: DIY $515.00; pro $800.00 — DIY wins by $285.00.

Reverse: The smallest whole-dollar hourly value where hiring WINS is $64.00; at $64.00 the figures are DIY $805.00; pro $800.00 — Hiring wins by $5.00; at the lower neighbor the figures are DIY $800.00; pro $800.00 — exact tie — verdict: STEP. Reverse: The largest whole-dollar hourly value where DIY still wins by at least $100.00 is $43.00; at $43.00 the figures are DIY $700.00; pro $800.00 — DIY wins by $100.00; at the upper neighbor the figures are DIY $705.00; pro $800.00 — DIY wins by $95.00 — verdict: STEP. Reverse: The smallest whole-dollar pro price per door where DIY wins by at least $100.00 is $380.00; at $380.00 the figures are DIY $660.00; pro $760.00 — DIY wins by $100.00; at the lower neighbor the figures are DIY $660.00; pro $758.00 — DIY wins by $98.00 — verdict: STEP. Reverse: The smallest whole-dollar materials per door where hiring WINS is $291.00; at $291.00 the figures are DIY $802.00; pro $800.00 — Hiring wins by $2.00; at the lower neighbor the figures are DIY $800.00; pro $800.00 — exact tie — verdict: STEP. Reverse: The smallest whole-dollar supplies where hiring WINS is $186.00; at $186.00 the figures are DIY $801.00; pro $800.00 — Hiring wins by $1.00; at the lower neighbor the figures are DIY $800.00; pro $800.00 — exact tie — verdict: STEP. Reverse: The smallest whole-hours value where hiring WINS is 10 hours; at 10 hours the figures are DIY $835.00; pro $800.00 — Hiring wins by $35.00; at the lower neighbor the figures are DIY $800.00; pro $800.00 — exact tie — verdict: STEP.

Edges: Doors 1, everything $0 gives DIY $0.00; pro $400.00 — DIY wins by $400.00. Hours 0, hourly value $0 gives DIY $485.00; pro $800.00 — DIY wins by $315.00. Doors 3, materials $187.45, supplies $62.38, hours 7.5, hourly value $48.25, pro $425 gives DIY $986.61; pro $1,275.00 — DIY wins by $288.40. Pro price $330 per door gives DIY $660.00; pro $660.00 — exact tie. Hourly value $110, hours 8 gives DIY $1,365.00; pro $800.00 — Hiring wins by $565.00. Pro price $550 per door gives DIY $660.00; pro $1,100.00 — DIY wins by $440.00. Win-by bars — DIY $660.00 gives pro price per door for a $100.00 DIY win $380.00; for a $300.00 DIY win $480.00; materials per door for a $100.00 DIY win $240.00.

Is $660.00 the right DIY cost for installing 2 doors?

On the defaults — 2 doors at $220.00 of materials each, $45.00 of supplies and 5 hours of your time at $35.00 an hour — installing the doors costs $660.00 to do yourself, against a $800.00 pro cost, so DIY wins by $140.00. The DIY cost is the doors times the materials per door plus the supplies plus your hours valued at your hourly rate; the pro cost is the doors times the pro price per door. A typical pro door installation runs $150–$500 or more per door installed, depending on the door — a pre-hung interior door is usually $150–$350 fitted, an exterior door $500–$1,000 or more because it needs weatherproofing, and custom sizes or second-storey work add labour. Common DIY materials: the pre-hung door itself $150–$400, shims, screws, caulk, trim and insulation foam $30–$60 a door.

Four things about the model are worth stating plainly. First, the materials are $220.00 a door — 2 doors is $440.00 of doors. Second, the DIY cost is $660.00 — $440.00 of doors + $45.00 of supplies + 5 × $35.00 of your time. Third, the pro cost is $800.00 — 2 × $400.00 a door. And fourth, DIY wins by $140.00 — but the answer turns on your hourly value: at $64.00 an hour hiring wins; all listed in Accuracy & limitations.

The worked example, line by line

Setup: 2 doors at $220.00 of materials each, $45.00 of supplies, 5 hours at $35.00 an hour, pro price $400.00 a door.

Line 1 — the DIY cost. The DIY cost is 2 × $220.00 + $45.00 + 5 × $35.00 = $660.00.

Line 2 — the pro cost. The pro cost is 2 × $400.00 = $800.00.

Line 3 — the winner. $800.00 − $660.00 = $140.00 — DIY wins by $140.00.

Line 4 — the check. $440.00 + $45.00 + $175.00 = $660.00, the DIY cost; and $660.00 + $140.00 = $800.00, the pro cost.

Every branch, checked

Hours 10: DIY $835.00; pro $800.00 — Hiring wins by $35.00 — With 10 hours the DIY cost is $835.00 — pro wins by $35.00.

Materials $300 per door: DIY $820.00; pro $800.00 — Hiring wins by $20.00 — With $300.00 of materials a door the DIY cost is $820.00 — pro wins by $20.00.

Hourly value $60: DIY $785.00; pro $800.00 — DIY wins by $15.00 — With your time at $60.00 an hour the DIY cost is $785.00 — DIY wins by $15.00.

Pro price $300 per door: DIY $660.00; pro $600.00 — Hiring wins by $60.00 — With a $300.00 pro price the pro total is $600.00 — pro wins by $60.00.

Doors 4: DIY $1,100.00; pro $1,600.00 — DIY wins by $500.00 — With 4 doors the DIY cost is $1,100.00 and the pro cost is $1,600.00 — DIY wins by $500.00.

Materials $400 per door: DIY $1,020.00; pro $800.00 — Hiring wins by $220.00 — With $400.00 of materials a door the DIY cost is $1,020.00 — pro wins by $220.00.

Supplies $0, hours 3, hourly value $25: DIY $515.00; pro $800.00 — DIY wins by $285.00 — With no supplies and 3 hours at $25.00 an hour the DIY cost is $515.00 — DIY wins by $285.00.

The reverses, worked backwards

Smallest whole-dollar hourly value where hiring WINS: At the displayed $64.00 the figures are DIY $805.00; pro $800.00 — Hiring wins by $5.00. At the displayed $64.00 the DIY cost is $805.00 and hiring wins by $5.00. At $63.00 the DIY cost is $800.00 — a dead heat, a TIE, not a hiring win — so $64.00 is the smallest whole-dollar hourly value where hiring wins.

Largest whole-dollar hourly value where DIY still wins by at least $100.00: At the displayed $43.00 the figures are DIY $700.00; pro $800.00 — DIY wins by $100.00. At the displayed $43.00 the DIY cost is $700.00 and DIY wins by $100.00. At $44.00 the DIY cost is $705.00 and DIY wins by only $95.00 — below $100 — so $43.00 is the largest whole-dollar hourly value where DIY still wins by at least $100.00.

Smallest whole-dollar pro price per door where DIY wins by at least $100.00: At the displayed $380.00 the figures are DIY $660.00; pro $760.00 — DIY wins by $100.00. At the displayed $380.00 DIY wins by $100.00 exactly. At a $379.00 pro price DIY wins by only $98.00 — below $100 — so $380.00 is the smallest whole-dollar pro price per door where DIY wins by at least $100.00.

Smallest whole-dollar materials per door where hiring WINS: At the displayed $291.00 the figures are DIY $802.00; pro $800.00 — Hiring wins by $2.00. At the displayed $291.00 the DIY cost is $802.00 and hiring wins by $2.00. At $290.00 the DIY cost is $800.00 — a dead heat, a TIE, not a hiring win — so $291.00 is the smallest whole-dollar materials per door where hiring wins.

Smallest whole-dollar supplies where hiring WINS: At the displayed $186.00 the figures are DIY $801.00; pro $800.00 — Hiring wins by $1.00. At the displayed $186.00 the DIY cost is $801.00 and hiring wins by $1.00. At $185.00 the DIY cost is $800.00 — a dead heat, a TIE, not a hiring win — so $186.00 is the smallest whole-dollar supplies where hiring wins.

Smallest whole-hours value where hiring WINS: At the displayed 10 hours the figures are DIY $835.00; pro $800.00 — Hiring wins by $35.00. At the displayed 10 hours the DIY cost is $835.00 and hiring wins by $35.00. At 9 hours the DIY cost is $800.00 — a dead heat, a TIE, not a hiring win — so 10 hours is the smallest whole-hours value where hiring wins.

A note on the ties: at $290.00 of materials a door the DIY cost is $800.00 — exactly the pro cost — so it is a dead heat, not a hiring win; hiring only wins at $291.00. The same holds for supplies: at $185.00 the DIY cost is $800.00, a dead heat, and hiring only wins at $186.00. The same holds for hours: at 9 hours the DIY cost is $800.00, a dead heat, and hiring only wins at 10 hours. And at a $330.00 pro price the DIY cost is $660.00 — a dead heat, a TIE. One more edge: with 3 doors, materials of $187.45, supplies of $62.38, 7.5 hours at $48.25 an hour and a $425.00 pro price, the DIY cost is $986.605 unrounded — shown as $986.61 after rounding — and DIY wins by $288.395 unrounded — shown as $288.40 after rounding. With your time at $110.00 an hour and 8 hours, the DIY cost is $1,365.00 — pro wins by $565.00.

What the defaults assume

The defaults are 2 doors at $220.00 of materials each, $45.00 of supplies, 5 hours at $35.00 an hour and a $400.00 pro price per door — DIY $660.00; pro $800.00 — DIY wins by $140.00. With Hours 10, DIY $835.00; pro $800.00 — Hiring wins by $35.00. With Materials $300 per door, DIY $820.00; pro $800.00 — Hiring wins by $20.00. With Hourly value $60, DIY $785.00; pro $800.00 — DIY wins by $15.00. With Pro price $300 per door, DIY $660.00; pro $600.00 — Hiring wins by $60.00. With Doors 4, DIY $1,100.00; pro $1,600.00 — DIY wins by $500.00. With Materials $400 per door, DIY $1,020.00; pro $800.00 — Hiring wins by $220.00. With Supplies $0, hours 3, hourly value $25, DIY $515.00; pro $800.00 — DIY wins by $285.00. With Doors 1, everything $0, DIY $0.00; pro $400.00 — DIY wins by $400.00. With Hours 0, hourly value $0, DIY $485.00; pro $800.00 — DIY wins by $315.00. With Doors 3, materials $187.45, supplies $62.38, hours 7.5, hourly value $48.25, pro $425, DIY $986.61; pro $1,275.00 — DIY wins by $288.40. With Pro price $330 per door, DIY $660.00; pro $660.00 — exact tie. With Hourly value $110, hours 8, DIY $1,365.00; pro $800.00 — Hiring wins by $565.00. With Pro price $550 per door, DIY $660.00; pro $1,100.00 — DIY wins by $440.00. With Win-by bars — DIY $660.00, pro price per door for a $100.00 DIY win $380.00; for a $300.00 DIY win $480.00; materials per door for a $100.00 DIY win $240.00.

Output · formula · meaning

OutputFormulaWhat it means
Doorsinput2.
Materials per doorinput$220.00.
Suppliesinput$45.00.
Hoursinput5.
Hourly valueinput$35.00.
Pro price per doorinput$400.00.
DIY costdoors × materials per door + supplies + hours × hourly value$660.00.
Pro costdoors × pro price per door$800.00.
Winnerlower total winsDIY wins by $140.00.
Reverse: Smallest whole-dollar hourly value where hiring WINSstep$64.00 → $64.00.
Below the revr1 starneighborDIY $800.00; pro $800.00 — exact tie.
Above the revr1 starneighborDIY $810.00; pro $800.00 — Hiring wins by $10.00.
Reverse: Largest whole-dollar hourly value where DIY still wins by at least $100.00step$43.00 → $43.00.
Below the revr2 starneighborDIY $695.00; pro $800.00 — DIY wins by $105.00.
Above the revr2 starneighborDIY $705.00; pro $800.00 — DIY wins by $95.00.
Reverse: Smallest whole-dollar pro price per door where DIY wins by at least $100.00step$380.00 → $380.00.
Below the revr3 starneighborDIY $660.00; pro $758.00 — DIY wins by $98.00.
Above the revr3 starneighborDIY $660.00; pro $762.00 — DIY wins by $102.00.
Reverse: Smallest whole-dollar materials per door where hiring WINSstep$291.00 → $291.00.
Below the revr4 starneighborDIY $800.00; pro $800.00 — exact tie.
Above the revr4 starneighborDIY $804.00; pro $800.00 — Hiring wins by $4.00.
Reverse: Smallest whole-dollar supplies where hiring WINSstep$186.00 → $186.00.
Below the revr5 starneighborDIY $800.00; pro $800.00 — exact tie.
Above the revr5 starneighborDIY $802.00; pro $800.00 — Hiring wins by $2.00.
Reverse: Smallest whole-hours value where hiring WINSstep10 hours → 10 hours.
Below the revr6 starneighborDIY $800.00; pro $800.00 — exact tie.
Above the revr6 starneighborDIY $870.00; pro $800.00 — Hiring wins by $70.00.
Hours 10same modelDIY $835.00; pro $800.00 — Hiring wins by $35.00.
Materials $300 per doorsame modelDIY $820.00; pro $800.00 — Hiring wins by $20.00.
Hourly value $60same modelDIY $785.00; pro $800.00 — DIY wins by $15.00.
Pro price $300 per doorsame modelDIY $660.00; pro $600.00 — Hiring wins by $60.00.
Doors 4same modelDIY $1,100.00; pro $1,600.00 — DIY wins by $500.00.
Materials $400 per doorsame modelDIY $1,020.00; pro $800.00 — Hiring wins by $220.00.
Supplies $0, hours 3, hourly value $25same modelDIY $515.00; pro $800.00 — DIY wins by $285.00.

Who uses this

  • The homeowner with 2 standard doors: they learn installing them costs $660.00 to do themselves against a $800.00 pro cost — and they check the $64.00 reverse to see where hiring takes over.
  • The homeowner whose time is pricey: they learn at $60.00 an hour DIY still wins by $15.00 — and they check the $380.00 reverse to see how high the pro price must be before DIY wins by $100.00.
  • The homeowner facing a $291 materials bill: they learn hiring wins by $2.00 at that materials cost — and they check the $290.00 tie to see that one dollar less is a dead heat, not a hiring win.
  • The homeowner with a 10-hour job: they learn at 10 hours hiring wins by $35.00 — and they check the $186.00 reverse to see how much supplies must cost before hiring wins.

Accuracy & limitations

The math is first-principles: the DIY cost is the doors times the materials per door plus the supplies plus the hours times the hourly value; the pro cost is the doors times the pro price per door; the winner is the lower total. The reverses are judged on the UNROUNDED totals: at $290.00 of materials a door the DIY cost is $800.00, exactly the pro cost, so it ties; at $291.00 the DIY cost is $802.00, so hiring wins by $2.00. The same rounding shows in the fractional edge: the DIY cost is $986.605 unrounded, shown as $986.61 after rounding, and the win is $288.395 unrounded, shown as $288.40 after rounding. What the model cannot do is price your doors: the $150–$500 pro range and the $150–$400 door range are typical figures, not quotes; a badly hung door sticks, drafts and voids the manufacturer’s warranty, and a badly sealed exterior door leaks water and can rot the frame over time; and the hourly value is yours to set — an hour of a Saturday is not worth the same to everyone. Energy-efficient exterior doors can cut heating and cooling bills, but the payback takes years — the saving is not a reason to replace sound doors early. Use it to see which side wins on your numbers — then get a real quote before you book.

Cite this calculatorBright Side Kit. “DIY vs Hire Door Installation: Compare the Real Cost” brightoolbox.com, 2026. Method: DIY cost = doors × materials per door + supplies + hours × your hourly value; pro cost = doors × pro price per door; the winner is the lower total. Reverses: smallest whole-dollar hourly value where hiring WINS is $64.00 (at $64.00 the DIY cost is $805.00 and hiring wins by $5.00; at $63.00 the DIY cost is $800.00, a dead heat, a TIE, not a hiring win); largest whole-dollar hourly value where DIY still wins by at least $100.00 is $43.00 (at $43.00 the DIY cost is $700.00 and DIY wins by $100.00; at $44.00 the DIY cost is $705.00 and DIY wins by $95.00); smallest whole-dollar pro price per door where DIY wins by at least $100.00 is $380.00 (at $380.00 DIY wins by $100.00 exactly; at a $379.00 pro price DIY wins by $98.00); smallest whole-dollar materials per door where hiring WINS is $291.00 (at $291.00 the DIY cost is $802.00 and hiring wins by $2.00; at $290.00 the DIY cost is $800.00, a dead heat, a TIE, not a hiring win); smallest whole-dollar supplies where hiring WINS is $186.00 (at $186.00 the DIY cost is $801.00 and hiring wins by $1.00; at $185.00 the DIY cost is $800.00, a dead heat, a TIE, not a hiring win); smallest whole-hours value where hiring WINS is 10 hours (at 10 hours the DIY cost is $835.00 and hiring wins by $35.00; at 9 hours the DIY cost is $800.00, a dead heat, a TIE, not a hiring win). Defaults: DIY $660.00; pro $800.00 — DIY wins by $140.00 Bright Side Kit. "DIY vs Hire Door Installation: Compare the Real Cost" https://brightoolbox.com/diy-vs-hire-door-installation/ Accessed October 26, 2026.
Embed this calculator

Frequently asked questions

Is it cheaper to install doors yourself or hire a pro?

DIY on the defaults, by $140.00. Installing 2 doors costs $660.00 to do yourself — $220.00 of materials each, $45.00 of supplies and 5 hours at $35.00 an hour — against a $800.00 pro cost. With $400.00 of materials a door the pro wins by $220.00, and with a $300.00 pro price the pro wins by $60.00.

How much does a pro door installation cost?

Typically $150–$500 or more per door installed. A pre-hung interior door is usually $150–$350 fitted, an exterior door $500–$1,000 or more because it needs weatherproofing, and custom sizes or second-storey work add labour. At a $380.00 pro price DIY wins by $100.00 exactly; at a $379.00 pro price DIY wins by $98.00.

How much do the materials cost to install a door yourself?

Typically $150–$400 for the door, plus $30–$60 a door for the rest. The pre-hung door itself runs $150–$400, and shims, screws, caulk, trim and insulation foam run $30–$60 a door. At $291.00 of materials a door hiring wins by $2.00; at $290.00 the two ways tie exactly.

How much is my time worth in the comparison?

Whatever an hour of your time is worth to you. At $35.00 an hour DIY wins by $140.00; at $64.00 an hour hiring wins by $5.00; and at $0.00 an hour — your time is free — DIY costs $485.00 and wins by $315.00.

When does hiring win?

With pricey materials, pricey time or a long job. Hiring wins by $2.00 when materials are $291.00 a door, pro wins by $220.00 when materials are $400.00 a door, pro wins by $565.00 when your time is $110.00 an hour and the job takes 8 hours, and hiring wins by $35.00 when the job takes 10 hours. The smallest whole-dollar materials where hiring wins is $291.00 — at $290.00 the two ways tie exactly.

What if the two ways cost exactly the same?

Then it is a dead heat, a TIE. At $290.00 of materials a door the DIY cost is $800.00, exactly the pro cost. At $185.00 of supplies the DIY cost is $800.00 too. And at a $330.00 pro price the DIY cost is $660.00 and the pro cost is $660.00 — a dead heat, a TIE.

Why does the calculator say $986.61 when the exact DIY cost is $986.605?

Rounding. With 3 doors, materials of $187.45, supplies of $62.38, 7.5 hours at $48.25 an hour and a $425.00 pro price, the DIY cost is $986.605 unrounded — shown as $986.61 after rounding — and DIY wins by $288.395 unrounded — shown as $288.40 after rounding. The win is judged on the unrounded DIY cost, so $288.40 is the displayed win, not $288.39.

Should I install an exterior door myself?

A pro is worth it for exterior doors. A door replacement is worth doing yourself when the doors are standard sizes, pre-hung, the frames are sound, and you have basic tools (level, drill, shims, pry bar). A pro is worth it for exterior doors, custom or arched shapes, rotten frames, structural work, or when the warranty matters — most pro jobs carry a labour warranty the DIY route does not.