★ EVERYDAY · HOME · DIY VS HIRE

DIY vs Hire Deck Building: Cost Comparison Calculator

On the defaults — 400 square feet at $8.00 of materials each, $300.00 of supplies and 40 hours of your time at $45.00 an hour — building the deck costs $5,300.00 to do yourself, against a $10,000.00 pro cost, so DIY wins by $4,700.00. Put in your own square feet, materials, supplies, hours, hourly value and pro price per square foot, and the calculator prices both ways. No deck-BUILDING comparison exists on the site — the deck-staining comparison prices staining an existing deck, not building one. This one prices building a new 400 sq ft deck from scratch — decking boards, supplies and your hours — against a pro price per square foot. This is DIY-vs-hire comparison #310.

1170

DIY vs hire deck building calculator

DIY cost = square feet × materials per square foot + supplies + hours × your hourly value. Pro cost = square feet × pro price per square foot. A pro deck build is usually priced per square foot — and a typical backyard deck is 300–500 square feet. Pressure-treated pine installed by a pro usually runs $15–$25 per square foot, cedar or redwood $20–$35, and composite $25–$45, so a 400 sq ft pro job commonly lands between $6,000 and $14,000 depending on the material and the site. Common DIY materials: decking boards by the square foot, joists and beams, posts and concrete footings, screws and hidden fasteners, stain or sealant, and a permit in most towns. The risks of doing it yourself: footings that are too shallow heave in winter, railings that are too low or too far apart fail inspection, a deck that is not level or not properly flashed against the house rots the framing, and a big deck takes a pro crew days but a DIYer several weekends. A deck is worth building yourself when it is small and low to the ground, the design is a simple rectangle, and you have a helper — boards are long and awkward alone, and a second pair of hands halves the time. A pro is worth it for a raised or second-story deck, composite decking (special fasteners and expansion gaps), tight deadlines, or when the permit and inspection process matters — most pro jobs carry a labour warranty the DIY route does not; all listed in Accuracy & limitations.

How many square feet of deck — the default is 400.

The decking materials per square foot — the default is $8.00.

Joists, posts, footings, fasteners, stain, permit — the default is $300.00.

How long the deck build takes you — the default is 40 hours.

What an hour of your time is worth — the default is $45.00.

The pro price per square foot installed — the default is $25.00.

DIY $5,300.00; pro $10,000.00 — DIY wins by $4,700.00DIY $5,300.00; pro $10,000.00 — DIY wins by $4,700.00DIY $5,300.00; pro $10,000.00 — DIY wins by $4,700.00. On 400 square feet at $8.00 of materials each, $300.00 of supplies and 40 hours at $45.00 an hour, the DIY cost is $5,300.00 against a $10,000.00 pro cost — DIY wins by $4,700.00.

Square feet: 400

Materials per square foot: $8.00

Supplies: $300.00

Hours: 40

Hourly value: $45.00

Pro price per square foot: $25.00

DIY cost: $5,300.00

Pro cost: $10,000.00

Winner: DIY wins by $4,700.00

Branch: Hours 20: DIY $4,400.00; pro $10,000.00 — DIY wins by $5,600.00

Branch: Hours 60: DIY $6,200.00; pro $10,000.00 — DIY wins by $3,800.00

Branch: Materials $5.00 per square foot: DIY $4,100.00; pro $10,000.00 — DIY wins by $5,900.00

Branch: Materials $15.00 per square foot: DIY $8,100.00; pro $10,000.00 — DIY wins by $1,900.00

Branch: Hours 80: DIY $7,100.00; pro $10,000.00 — DIY wins by $2,900.00

Branch: Materials $19.75 per square foot: DIY $10,000.00; pro $10,000.00 — exact tie

Branch: Hours 30: DIY $4,850.00; pro $10,000.00 — DIY wins by $5,150.00

Reverse: Smallest whole-dollar hourly value where hiring WINS: $163

Reverse: Smallest whole-dollar hourly value where hiring WINS (rounded): $163

At $163 the figures are: DIY $10,020.00; pro $10,000.00 — Hiring wins by $20.00

At the lower neighbor the figures are: DIY $9,980.00; pro $10,000.00 — DIY wins by $20.00

At the upper neighbor the figures are: DIY $10,060.00; pro $10,000.00 — Hiring wins by $60.00

Reverse verdict: STEP

Reverse: Largest whole-dollar hourly value where DIY still wins by at least $500.00: $150

Reverse: Largest whole-dollar hourly value where DIY still wins by at least $500.00 (rounded): $150

At $150 the figures are: DIY $9,500.00; pro $10,000.00 — DIY wins by $500.00

At the lower neighbor the figures are: DIY $9,460.00; pro $10,000.00 — DIY wins by $540.00

At the upper neighbor the figures are: DIY $9,540.00; pro $10,000.00 — DIY wins by $460.00

Reverse verdict: STEP

Reverse: Smallest whole-dollar supplies where hiring WINS: $5,001

Reverse: Smallest whole-dollar supplies where hiring WINS (rounded): $5,001

At $5,001 the figures are: DIY $10,001.00; pro $10,000.00 — Hiring wins by $1.00

At the lower neighbor the figures are: DIY $10,000.00; pro $10,000.00 — exact tie

At the upper neighbor the figures are: DIY $10,002.00; pro $10,000.00 — Hiring wins by $2.00

Reverse verdict: STEP

Reverse: Smallest whole-cent materials per square foot where hiring WINS: $19.76

Reverse: Smallest whole-cent materials per square foot where hiring WINS (rounded): $19.76

At $19.76 the figures are: DIY $10,004.00; pro $10,000.00 — Hiring wins by $4.00

At the lower neighbor the figures are: DIY $10,000.00; pro $10,000.00 — exact tie

At the upper neighbor the figures are: DIY $10,008.00; pro $10,000.00 — Hiring wins by $8.00

Reverse verdict: STEP

Reverse: Smallest whole-hour hours where hiring WINS: 145 hours

Reverse: Smallest whole-hour hours where hiring WINS (rounded): 145 hours

At 145 hours the figures are: DIY $10,025.00; pro $10,000.00 — Hiring wins by $25.00

At the lower neighbor the figures are: DIY $9,980.00; pro $10,000.00 — DIY wins by $20.00

At the upper neighbor the figures are: DIY $10,070.00; pro $10,000.00 — Hiring wins by $70.00

Reverse verdict: STEP

Reverse: Smallest whole-dollar pro price per square foot where DIY wins at all: $14

Reverse: Smallest whole-dollar pro price per square foot where DIY wins at all (rounded): $14

At $14 the figures are: DIY $5,300.00; pro $5,600.00 — DIY wins by $300.00

At the lower neighbor the figures are: DIY $5,300.00; pro $5,200.00 — Hiring wins by $100.00

At the upper neighbor the figures are: DIY $5,300.00; pro $6,000.00 — DIY wins by $700.00

Reverse verdict: STEP

Edge: Square feet 0, materials $0, supplies $0, hours 0, hourly value $0: DIY $0.00; pro $0.00 — exact tie

Edge: Square feet 100, materials $10.00, supplies $50, hours 5, hourly value $30, pro $20.00 per square foot: DIY $1,200.00; pro $2,000.00 — DIY wins by $800.00

Edge: Square feet 250, materials $12.375, supplies $215.75, hours 18.5, hourly value $42.25, pro $28.50 per square foot: DIY $4,091.13; pro $7,125.00 — DIY wins by $3,033.88

Edge: Materials $30.00 per square foot, supplies $500, hours 60, hourly value $75, pro $20.00 per square foot: DIY $17,000.00; pro $8,000.00 — Hiring wins by $9,000.00

Edge: Hours 0: DIY $3,500.00; pro $10,000.00 — DIY wins by $6,500.00

Edge: Hours 12.5: DIY $4,062.50; pro $10,000.00 — DIY wins by $5,937.50

Edge: Win-by bars — DIY $5,300.00: hourly value for a $500.00 DIY win $150.00; pro price per square foot for a $1,000.00 DIY win $15.75; materials per square foot for a $1,000.00 DIY win $17.25

DIY $5,300.00; pro $10,000.00 — DIY wins by $4,700.00. On the defaults DIY wins by $4,700.00. The deciding input is your hourly value: at $163.00 an hour hiring wins by $20.00, and at $162.00 an hour DIY still wins by $20.00. With 145 hours the answer flips to hiring, winning by $25.00 — and at $19.76 of materials a square foot hiring wins by $4.00, while at $19.75 the two ways tie exactly, a dead heat.

Hours 20: DIY $4,400.00; pro $10,000.00 — DIY wins by $5,600.00.

Hours 60: DIY $6,200.00; pro $10,000.00 — DIY wins by $3,800.00.

Materials $5.00 per square foot: DIY $4,100.00; pro $10,000.00 — DIY wins by $5,900.00.

Materials $15.00 per square foot: DIY $8,100.00; pro $10,000.00 — DIY wins by $1,900.00.

Hours 80: DIY $7,100.00; pro $10,000.00 — DIY wins by $2,900.00.

Materials $19.75 per square foot: DIY $10,000.00; pro $10,000.00 — exact tie.

Hours 30: DIY $4,850.00; pro $10,000.00 — DIY wins by $5,150.00.

Reverse: The smallest whole-dollar hourly value where hiring WINS is $163; at $163 the figures are DIY $10,020.00; pro $10,000.00 — Hiring wins by $20.00; at the lower neighbor the figures are DIY $9,980.00; pro $10,000.00 — DIY wins by $20.00 — verdict: STEP. Reverse: The largest whole-dollar hourly value where DIY still wins by at least $500.00 is $150; at $150 the figures are DIY $9,500.00; pro $10,000.00 — DIY wins by $500.00; at the upper neighbor the figures are DIY $9,540.00; pro $10,000.00 — DIY wins by $460.00 — verdict: STEP. Reverse: The smallest whole-dollar supplies where hiring WINS is $5,001; at $5,001 the figures are DIY $10,001.00; pro $10,000.00 — Hiring wins by $1.00; at the lower neighbor the figures are DIY $10,000.00; pro $10,000.00 — exact tie — verdict: STEP. Reverse: The smallest whole-cent materials per square foot where hiring WINS is $19.76; at $19.76 the figures are DIY $10,004.00; pro $10,000.00 — Hiring wins by $4.00; at the lower neighbor the figures are DIY $10,000.00; pro $10,000.00 — exact tie — verdict: STEP. Reverse: The smallest whole-hour hours where hiring WINS is 145 hours; at 145 hours the figures are DIY $10,025.00; pro $10,000.00 — Hiring wins by $25.00; at the lower neighbor the figures are DIY $9,980.00; pro $10,000.00 — DIY wins by $20.00 — verdict: STEP. Reverse: The smallest whole-dollar pro price per square foot where DIY wins at all is $14; at $14 the figures are DIY $5,300.00; pro $5,600.00 — DIY wins by $300.00; at the lower neighbor the figures are DIY $5,300.00; pro $5,200.00 — Hiring wins by $100.00 — verdict: STEP.

Edges: Square feet 0, materials $0, supplies $0, hours 0, hourly value $0 gives DIY $0.00; pro $0.00 — exact tie. Square feet 100, materials $10.00, supplies $50, hours 5, hourly value $30, pro $20.00 per square foot gives DIY $1,200.00; pro $2,000.00 — DIY wins by $800.00. Square feet 250, materials $12.375, supplies $215.75, hours 18.5, hourly value $42.25, pro $28.50 per square foot gives DIY $4,091.13; pro $7,125.00 — DIY wins by $3,033.88. Materials $30.00 per square foot, supplies $500, hours 60, hourly value $75, pro $20.00 per square foot gives DIY $17,000.00; pro $8,000.00 — Hiring wins by $9,000.00. Hours 0 gives DIY $3,500.00; pro $10,000.00 — DIY wins by $6,500.00. Hours 12.5 gives DIY $4,062.50; pro $10,000.00 — DIY wins by $5,937.50. Win-by bars — DIY $5,300.00 gives hourly value for a $500.00 DIY win $150.00; pro price per square foot for a $1,000.00 DIY win $15.75; materials per square foot for a $1,000.00 DIY win $17.25.

Is $5,300.00 the right DIY cost for building a 400 sq ft deck?

On the defaults — 400 square feet at $8.00 of materials each, $300.00 of supplies and 40 hours of your time at $45.00 an hour — building the deck costs $5,300.00 to do yourself, against a $10,000.00 pro cost, so DIY wins by $4,700.00. The DIY cost is the square feet times the materials per square foot plus the supplies plus your hours valued at your hourly rate; the pro cost is the square feet times the pro price per square foot. A pro deck build is usually priced per square foot — and a typical backyard deck is 300–500 square feet. Pressure-treated pine installed by a pro usually runs $15–$25 per square foot, cedar or redwood $20–$35, and composite $25–$45, so a 400 sq ft pro job commonly lands between $6,000 and $14,000 depending on the material and the site.

Four things about the model are worth stating plainly. First, the materials are $8.00 a square foot — 400 square feet is $3,200.00 of decking. Second, the DIY cost is $5,300.00 — $3,200.00 of materials + $300.00 of supplies + 40 × $45.00 of your time. Third, the pro cost is $10,000.00 — 400 × $25.00 a square foot. And fourth, DIY wins by $4,700.00 — but the answer turns on your hourly value: at $163.00 an hour hiring wins; all listed in Accuracy & limitations.

The worked example, line by line

Setup: 400 square feet at $8.00 of materials each, $300.00 of supplies, 40 hours at $45.00 an hour, pro price $25.00 a square foot.

Line 1 — the DIY cost. The DIY cost is 400 × $8.00 + $300.00 + 40 × $45.00 = $5,300.00.

Line 2 — the pro cost. The pro cost is 400 × $25.00 = $10,000.00.

Line 3 — the winner. $10,000.00 − $5,300.00 = $4,700.00 — DIY wins by $4,700.00.

Line 4 — the check. $3,200.00 + $300.00 + $1,800.00 = $5,300.00, the DIY cost; and $5,300.00 + $4,700.00 = $10,000.00, the pro cost.

Every branch, checked

Hours 20: DIY $4,400.00; pro $10,000.00 — DIY wins by $5,600.00 — With 20 hours the DIY cost is $4,400.00 — DIY wins by $5,600.00.

Hours 60: DIY $6,200.00; pro $10,000.00 — DIY wins by $3,800.00 — With 60 hours the DIY cost is $6,200.00 — DIY wins by $3,800.00.

Materials $5.00 per square foot: DIY $4,100.00; pro $10,000.00 — DIY wins by $5,900.00 — With $5.00 of materials a square foot the DIY cost is $4,100.00 — DIY wins by $5,900.00.

Materials $15.00 per square foot: DIY $8,100.00; pro $10,000.00 — DIY wins by $1,900.00 — With $15.00 of materials a square foot the DIY cost is $8,100.00 — DIY wins by $1,900.00.

Hours 80: DIY $7,100.00; pro $10,000.00 — DIY wins by $2,900.00 — With 80 hours the DIY cost is $7,100.00 — DIY wins by $2,900.00.

Materials $19.75 per square foot: DIY $10,000.00; pro $10,000.00 — exact tie — With $19.75 of materials a square foot the DIY cost is $10,000.00 — a dead heat, a TIE, not a hiring win.

Hours 30: DIY $4,850.00; pro $10,000.00 — DIY wins by $5,150.00 — With 30 hours the DIY cost is $4,850.00 — DIY wins by $5,150.00.

The reverses, worked backwards

Smallest whole-dollar hourly value where hiring WINS: At the displayed $163 the figures are DIY $10,020.00; pro $10,000.00 — Hiring wins by $20.00. At the displayed $163 the DIY cost is $10,020.00 and hiring wins by $20.00. At $162 the DIY cost is $9,980.00 and DIY wins by $20.00 — so $163 is the smallest whole-dollar hourly value where hiring wins.

Largest whole-dollar hourly value where DIY still wins by at least $500.00: At the displayed $150 the figures are DIY $9,500.00; pro $10,000.00 — DIY wins by $500.00. At the displayed $150 the DIY cost is $9,500.00 and DIY wins by $500.00. At $151 the DIY cost is $9,540.00 and DIY wins by only $460.00 — below $500 — so $150 is the largest whole-dollar hourly value where DIY still wins by at least $500.00.

Smallest whole-dollar supplies where hiring WINS: At the displayed $5,001 the figures are DIY $10,001.00; pro $10,000.00 — Hiring wins by $1.00. At the displayed $5,001 the DIY cost is $10,001.00 and hiring wins by $1.00. At $5,000 the DIY cost is $10,000.00 — a dead heat, a TIE, not a hiring win — so $5,001 is the smallest whole-dollar supplies where hiring wins.

Smallest whole-cent materials per square foot where hiring WINS: At the displayed $19.76 the figures are DIY $10,004.00; pro $10,000.00 — Hiring wins by $4.00. At the displayed $19.76 the DIY cost is $10,004.00 and hiring wins by $4.00. At $19.75 the DIY cost is $10,000.00 — a dead heat, a TIE, not a hiring win — so $19.76 is the smallest whole-cent materials per square foot where hiring wins.

Smallest whole-hour hours where hiring WINS: At the displayed 145 hours the figures are DIY $10,025.00; pro $10,000.00 — Hiring wins by $25.00. At the displayed 145 hours the DIY cost is $10,025.00 and hiring wins by $25.00. At 144 hours the DIY cost is $9,980.00 and DIY wins by $20.00 — so 145 hours is the smallest whole-hour hours where hiring wins.

Smallest whole-dollar pro price per square foot where DIY wins at all: At the displayed $14 the figures are DIY $5,300.00; pro $5,600.00 — DIY wins by $300.00. At the displayed $14 the pro cost is $5,600.00 and DIY wins by $300.00. At $13 the pro cost is $5,200.00 and hiring wins by $100.00 — so $14 is the smallest whole-dollar pro price per square foot where DIY wins at all.

A note on the ties: at $19.75 of materials a square foot the DIY cost is $10,000.00 — exactly the pro cost — so it is a dead heat, not a hiring win; hiring only wins at $19.76. The same holds for supplies: at $5,000.00 the DIY cost is $10,000.00, a dead heat, and hiring only wins at $5,001.00. One more edge: with 250 square feet, materials of $12.375, supplies of $215.75, 18.5 hours at $42.25 an hour and a $28.50 pro price, the DIY cost is 4091.125 unrounded — shown as $4,091.13 after rounding — and DIY wins by 3033.875 unrounded — shown as $3,033.88 after rounding. With materials at $30.00 a square foot, supplies of $500, 60 hours at $75.00 an hour and a $20.00 pro price, the DIY cost is $17,000.00 — pro wins by $9,000.00.

What the defaults assume

The defaults are 400 square feet at $8.00 of materials each, $300.00 of supplies, 40 hours at $45.00 an hour and a $25.00 pro price per square foot — DIY $5,300.00; pro $10,000.00 — DIY wins by $4,700.00. With Hours 20, DIY $4,400.00; pro $10,000.00 — DIY wins by $5,600.00. With Hours 60, DIY $6,200.00; pro $10,000.00 — DIY wins by $3,800.00. With Materials $5.00 per square foot, DIY $4,100.00; pro $10,000.00 — DIY wins by $5,900.00. With Materials $15.00 per square foot, DIY $8,100.00; pro $10,000.00 — DIY wins by $1,900.00. With Hours 80, DIY $7,100.00; pro $10,000.00 — DIY wins by $2,900.00. With Materials $19.75 per square foot, DIY $10,000.00; pro $10,000.00 — exact tie. With Hours 30, DIY $4,850.00; pro $10,000.00 — DIY wins by $5,150.00. With Square feet 0, materials $0, supplies $0, hours 0, hourly value $0, DIY $0.00; pro $0.00 — exact tie. With Square feet 100, materials $10.00, supplies $50, hours 5, hourly value $30, pro $20.00 per square foot, DIY $1,200.00; pro $2,000.00 — DIY wins by $800.00. With Square feet 250, materials $12.375, supplies $215.75, hours 18.5, hourly value $42.25, pro $28.50 per square foot, DIY $4,091.13; pro $7,125.00 — DIY wins by $3,033.88. With Materials $30.00 per square foot, supplies $500, hours 60, hourly value $75, pro $20.00 per square foot, DIY $17,000.00; pro $8,000.00 — Hiring wins by $9,000.00. With Hours 0, DIY $3,500.00; pro $10,000.00 — DIY wins by $6,500.00. With Hours 12.5, DIY $4,062.50; pro $10,000.00 — DIY wins by $5,937.50. With Win-by bars — DIY $5,300.00, hourly value for a $500.00 DIY win $150.00; pro price per square foot for a $1,000.00 DIY win $15.75; materials per square foot for a $1,000.00 DIY win $17.25.

Output · formula · meaning

OutputFormulaWhat it means
Square feetinput400.
Materials per square footinput$8.00.
Suppliesinput$300.00.
Hoursinput40.
Hourly valueinput$45.00.
Pro price per square footinput$25.00.
DIY costsquare feet × materials per square foot + supplies + hours × hourly value$5,300.00.
Pro costsquare feet × pro price per square foot$10,000.00.
Winnerlower total winsDIY wins by $4,700.00.
Reverse: Smallest whole-dollar hourly value where hiring WINSstep$163 → $163.
Below the revr1 starneighborDIY $9,980.00; pro $10,000.00 — DIY wins by $20.00.
Above the revr1 starneighborDIY $10,060.00; pro $10,000.00 — Hiring wins by $60.00.
Reverse: Largest whole-dollar hourly value where DIY still wins by at least $500.00step$150 → $150.
Below the revr2 starneighborDIY $9,460.00; pro $10,000.00 — DIY wins by $540.00.
Above the revr2 starneighborDIY $9,540.00; pro $10,000.00 — DIY wins by $460.00.
Reverse: Smallest whole-dollar supplies where hiring WINSstep$5,001 → $5,001.
Below the revr3 starneighborDIY $10,000.00; pro $10,000.00 — exact tie.
Above the revr3 starneighborDIY $10,002.00; pro $10,000.00 — Hiring wins by $2.00.
Reverse: Smallest whole-cent materials per square foot where hiring WINSstep$19.76 → $19.76.
Below the revr4 starneighborDIY $10,000.00; pro $10,000.00 — exact tie.
Above the revr4 starneighborDIY $10,008.00; pro $10,000.00 — Hiring wins by $8.00.
Reverse: Smallest whole-hour hours where hiring WINSstep145 hours → 145 hours.
Below the revr5 starneighborDIY $9,980.00; pro $10,000.00 — DIY wins by $20.00.
Above the revr5 starneighborDIY $10,070.00; pro $10,000.00 — Hiring wins by $70.00.
Reverse: Smallest whole-dollar pro price per square foot where DIY wins at allstep$14 → $14.
Below the revr6 starneighborDIY $5,300.00; pro $5,200.00 — Hiring wins by $100.00.
Above the revr6 starneighborDIY $5,300.00; pro $6,000.00 — DIY wins by $700.00.
Hours 20same modelDIY $4,400.00; pro $10,000.00 — DIY wins by $5,600.00.
Hours 60same modelDIY $6,200.00; pro $10,000.00 — DIY wins by $3,800.00.
Materials $5.00 per square footsame modelDIY $4,100.00; pro $10,000.00 — DIY wins by $5,900.00.
Materials $15.00 per square footsame modelDIY $8,100.00; pro $10,000.00 — DIY wins by $1,900.00.
Hours 80same modelDIY $7,100.00; pro $10,000.00 — DIY wins by $2,900.00.
Materials $19.75 per square footsame modelDIY $10,000.00; pro $10,000.00 — exact tie.
Hours 30same modelDIY $4,850.00; pro $10,000.00 — DIY wins by $5,150.00.

Who uses this

  • The homeowner building a 400 sq ft deck: they learn building it costs $5,300.00 to do themselves against a $10,000.00 pro cost — and they check the $163 reverse to see where hiring takes over.
  • The homeowner whose time is pricey: they learn at $150.00 an hour DIY wins by $500.00 — and they check the $14 reverse to see how low the pro price must fall before hiring wins.
  • The homeowner facing a $19.76 materials bill: they learn hiring wins by $4.00 at that materials cost — and they check the $19.75 tie to see that one cent less is a dead heat, not a hiring win.
  • The homeowner with a 145-hour job: they learn at 145 hours hiring wins by $25.00 — and they check the $5,001 reverse to see how much supplies must cost before hiring wins.

Accuracy & limitations

The math is first-principles: the DIY cost is the square feet times the materials per square foot plus the supplies plus the hours times the hourly value; the pro cost is the square feet times the pro price per square foot; the winner is the lower total. The reverses are judged on the UNROUNDED totals: at $19.75 of materials a square foot the DIY cost is $10,000.00, exactly the pro cost, so it ties; at $19.76 the DIY cost is $10,004.00, so hiring wins by $4.00. The same rounding shows in the fractional edge: the DIY cost is 4091.125 unrounded, shown as $4,091.13 after rounding, and the win is 3033.875 unrounded, shown as $3,033.88 after rounding. What the model cannot do is price your deck: the $15–$25 pressure-treated pine, $20–$35 cedar or redwood and $25–$45 composite per-square-foot pro ranges and the $6,000–$14,000 full-deck range are typical figures, not quotes; footings that are too shallow heave in winter, railings that are too low or too far apart fail inspection, a deck that is not level or not properly flashed against the house rots the framing, and a big deck takes a pro crew days but a DIYer several weekends — are the risks of doing it yourself; and the hourly value is yours to set — an hour of a Saturday is not worth the same to everyone. A deck is worth building yourself when it is small and low to the ground, the design is a simple rectangle, and you have a helper — boards are long and awkward alone, and a second pair of hands halves the time. A pro is worth it for a raised or second-story deck, composite decking (special fasteners and expansion gaps), tight deadlines, or when the permit and inspection process matters — most pro jobs carry a labour warranty the DIY route does not. Use it to see which side wins on your numbers — then get a real quote before you book.

Cite this calculatorBright Side Kit. “DIY vs Hire Deck Building: Cost Comparison Calculator” brightoolbox.com, 2026. Method: DIY cost = square feet × materials per square foot + supplies + hours × your hourly value; pro cost = square feet × pro price per square foot; the winner is the lower total. Reverses: smallest whole-dollar hourly value where hiring WINS is $163 (at $163 the DIY cost is $10,020.00 and hiring wins by $20.00; at $162 the DIY cost is $9,980.00 and DIY still wins by $20.00); largest whole-dollar hourly value where DIY still wins by at least $500.00 is $150 (at $150 the DIY cost is $9,500.00 and DIY wins by $500.00; at $151 the DIY cost is $9,540.00 and DIY wins by only $460.00); smallest whole-dollar supplies where hiring WINS is $5,001 (at $5,001 the DIY cost is $10,001.00 and hiring wins by $1.00; at $5,000 the DIY cost is $10,000.00, a dead heat, a TIE, not a hiring win); smallest whole-cent materials per square foot where hiring WINS is $19.76 (at $19.76 the DIY cost is $10,004.00 and hiring wins by $4.00; at $19.75 the DIY cost is $10,000.00, a dead heat, a TIE, not a hiring win); smallest whole-hour hours where hiring WINS is 145 hours (at 145 hours the DIY cost is $10,025.00 and hiring wins by $25.00; at 144 hours the DIY cost is $9,980.00 and DIY wins by $20.00); smallest whole-dollar pro price per square foot where DIY wins at all is $14 (at $14 the pro cost is $5,600.00 and DIY wins by $300.00; at $13 the pro cost is $5,200.00 and hiring wins by $100.00). Defaults: DIY $5,300.00; pro $10,000.00 — DIY wins by $4,700.00 Bright Side Kit. "DIY vs Hire Deck Building: Cost Comparison Calculator" https://brightoolbox.com/diy-vs-hire-deck-building/ Accessed October 27, 2026.
Embed this calculator

Frequently asked questions

Is it cheaper to build a deck yourself or hire a pro?

DIY on the defaults, by $4,700.00. Building a 400 sq ft deck costs $5,300.00 to do yourself — $8.00 of materials each, $300.00 of supplies and 40 hours at $45.00 an hour — against a $10,000.00 pro cost. With $15.00 of materials a square foot DIY still wins by $1,900.00, and with 80 hours DIY still wins by $2,900.00.

How much does a pro deck build cost?

Typically $6,000–$14,000 for 400 sq ft. Pressure-treated pine installed by a pro usually runs $15–$25 per square foot, cedar or redwood $20–$35, and composite $25–$45. At a $14.00 pro price per square foot DIY wins by $300.00; at a $13.00 pro price hiring wins by $100.00.

How much do the materials cost to build a deck yourself?

It depends on the decking. Common DIY materials: decking boards by the square foot, joists and beams, posts and concrete footings, screws and hidden fasteners, stain or sealant, and a permit in most towns. At $19.76 of materials a square foot hiring wins by $4.00; at $19.75 the two ways tie exactly.

How much is my time worth in the comparison?

Whatever an hour of your time is worth to you. At $45.00 an hour DIY wins by $4,700.00; at $163.00 an hour hiring wins by $20.00; and at $0.00 an hour — your time is free — DIY costs $3,500.00 and wins by $6,500.00.

When does hiring win?

With pricey materials, pricey time or a long job. Hiring wins by $4.00 when materials are $19.76 a square foot, hiring wins by $1.00 when supplies are $5,001.00, hiring wins by $9,000.00 when materials are $30.00 a square foot and your time is $75.00 an hour for 60 hours, and hiring wins by $25.00 when the job takes 145 hours. The smallest whole-dollar hourly value where hiring wins is $163 — at $162 DIY still wins by $20.00.

What if the two ways cost exactly the same?

Then it is a dead heat, a TIE. At $19.75 of materials a square foot the DIY cost is $10,000.00, exactly the pro cost. At $5,000.00 of supplies the DIY cost is $10,000.00 too.

Why does the calculator say $4,091.13 when the exact DIY cost is 4091.125?

Rounding. With 250 square feet, materials of $12.375, supplies of $215.75, 18.5 hours at $42.25 an hour and a $28.50 pro price, the DIY cost is 4091.125 unrounded — shown as $4,091.13 after rounding — and DIY wins by 3033.875 unrounded — shown as $3,033.88 after rounding. The win is judged on the unrounded DIY cost, so $3,033.88 is the displayed win, not $3,033.87.

Should I build a whole deck myself?

A pro is worth it for a raised or second-story deck and composite. A deck is worth building yourself when it is small and low to the ground, the design is a simple rectangle, and you have a helper — boards are long and awkward alone, and a second pair of hands halves the time. A pro is worth it for a raised or second-story deck, composite decking (special fasteners and expansion gaps), tight deadlines, or when the permit and inspection process matters — most pro jobs carry a labour warranty the DIY route does not.