Wood Chip mulch chart
Put your wood chip mulch area, depth and waste in: 900 sq ft at 2-inch depth with 10% waste needs 990.00 sq ft — 6.11 cubic yards exact, order 7.
★ CONSTRUCTION · REFERENCE TABLE #476 · WOOD CHIP MULCH
On the defaults — 900 square feet at a 2-inch depth with 10% waste — you need 990.00 square feet of coverage, which is 6.11 cubic yards exact, so order 7 cubic yards. This is reference table #476 — the wood chip version, where chunky wood chips hold moisture, keep weeds down, and last longer than shredded mulches — the bamboo-mulch-chart page is the bamboo version (850 sq ft, 4 inches, order 12 yards), the black-mulch-chart page is the black version (600 sq ft, 4 inches, order 9 yards), the cocoa-mulch-chart page is the cocoa version (450 sq ft, 3 inches, order 5 yards), and the spruce-mulch-chart page is the spruce version (600 sq ft, 3 inches, order 7 yards).
Put your wood chip mulch area, depth and waste in: 900 sq ft at 2-inch depth with 10% waste needs 990.00 sq ft — 6.11 cubic yards exact, order 7.
It means 990.00 square feet of coverage at 3 inches deep: the 900 square feet you measured, plus 10% for settling and spreading loss. One cubic yard covers 324 square feet at 1 inch, so at 2 inches one yard covers 162.0 square feet — that is why even a middling bed orders several yards. The exact figure is 6.11 yards; you cannot order a fraction of a yard from most suppliers, so the order rounds up to 7. The extra 0.89 yard is not waste — it is the top-up the beds will need as the wood chips settle and shift.
| Output | Formula | What it means |
|---|---|---|
| Needed area | area × (1 + waste ÷ 100) | 990.00 sq ft — 900 × 1.10. |
| Coverage per cubic yard | 324 ÷ depth in inches | 162.0 sq ft per yard — 324 ÷ 2. |
| Exact cubic yards | needed area × depth ÷ 324 | 6.11 — 990.00 × 2 ÷ 324. |
| Order | exact cubic yards rounded up | 7 cubic yards — 6.11 rounded up. |
| Area behind a target order | target yards × 324 ÷ depth ÷ (1 + waste ÷ 100) | 900 sq ft behind 6.11 yards at 2 inches and 10% waste. |
| Depth behind a target order | target yards × 324 ÷ needed area | 2 inches behind 6.11 yards over 990.00 sq ft. |
| Waste behind a target order | (target yards × 324 ÷ depth ÷ area − 1) × 100 | 10% behind 6.11 yards over 900 sq ft at 2 inches. |
First, measure only the beds and borders you will cover: wood chip mulch on lawn or bare soil is not mulch, it is litter, and measuring the whole garden overstates the order. Second, depth is installed depth, not settled depth: wood chip mulch shifts under foot traffic, and rain thins the layer further over a season — the 10% waste covers spreading loss, and a top-up after the first season keeps beds evenly covered. Third, wood chip mulch is chunky and slow-breaking: wood chips keep weeds down and hold moisture, and they last longer than shredded mulches, though fresh chips can borrow a little nitrogen at the surface — check the garden’s planting needs, not just the volume, before ordering by the yard.
Area 900 square feet, depth 2 inches, waste 10%. Needed area: 900 × 1.10 = 990.00 square feet. Coverage per yard at 2 inches: 324 ÷ 2 = 162.0 square feet. Exact yards: 990.00 ÷ 162.0 = 6.11. Order: 7 cubic yards. The same area at 3 inches would need 9.17 yards (order 10), and at 1 inch it would need 3.06 yards (order 4) — depth drives this chart more than area does, because every extra inch multiplies the whole surface.
Every row below is the same formula at 10% waste: needed area is area × 1.10, exact cubic yards are needed area × depth ÷ 324, and the order is the exact figure rounded up. Rows vary in both area and depth, so a shallow small bed and a deep large one can both be read off directly. Find your row, or use the calculator above for any size the table does not list.
| Area (sq ft) | Depth (inches) | Needed area (sq ft) | Exact cubic yards | Order |
|---|---|---|---|---|
| 100 | 2 | 110.00 | 0.68 | 1 cubic yard |
| 200 | 2 | 220.00 | 1.36 | 2 cubic yards |
| 100 | 3 | 110.00 | 1.02 | 2 cubic yards |
| 200 | 3 | 220.00 | 2.04 | 3 cubic yards |
| 300 | 2 | 330.00 | 2.04 | 3 cubic yards |
| 400 | 2 | 440.00 | 2.72 | 3 cubic yards |
| 300 | 3 | 330.00 | 3.06 | 4 cubic yards |
| 400 | 3 | 440.00 | 4.07 | 5 cubic yards |
| 650 | 2 | 715.00 | 4.41 | 5 cubic yards |
| 650 | 3 | 715.00 | 6.62 | 7 cubic yards |
| 500 | 2 | 550.00 | 3.40 | 4 cubic yards |
| 650 | 4 | 715.00 | 8.83 | 9 cubic yards |
| 1000 | 2 | 1100.00 | 6.79 | 7 cubic yards |
| 650 | 5 | 715.00 | 11.03 | 12 cubic yards |
| 600 | 3 | 660.00 | 6.11 | 7 cubic yards |
| 800 | 2 | 880.00 | 5.43 | 6 cubic yards |
At 0% waste, 900 square feet at 2 inches needs 5.56 yards exact — order 6. At 3 inches with 10% waste, the same area needs 9.17 yards exact — order 10. At 1100 square feet with 2 inches and 10% waste, the order is 7.47 yards exact — order 8. At 700 square feet with 2 inches and 10% waste, the order is 4.75 yards exact — order 5. Each branch changes exactly one input, so the difference from 6.11 isolates that input.
The area behind 6.11 yards is 900 square feet: at 800 square feet the figures are 5.43 yards exact — order 6, and at 1000 square feet they are 6.79 yards exact — order 7. The depth behind 6.11 yards is 2 inches: at 1 inch the figures are 3.06 yards exact — order 4, and at 3 inches they are 9.17 yards exact — order 10. The waste behind 6.11 yards is 10%: at 5% the figures are 5.83 yards exact — order 6, and at 15% they are 6.39 yards exact — order 7 — waste moves the exact figure here without changing the order at either neighbor, which is why the order alone never tells you the waste. A 100-square-foot step moves the exact figure by about 0.68 yards at this depth; a 1-inch step moves it by about 3.06 yards.
The defaults assume a flat 900-square-foot mulched area, a uniform 2-inch installed depth, and 10% waste for settling and uneven ground. Real beds slope, have edging that holds wood chips, and lose material to wind and foot traffic — open, sloped beds deserve more waste, and sheltered beds with edging deserve less. Zero area is the honest edge: 0.00 yards, order 0. Negative area, zero depth, and negative waste are rejected. This chart prices volume only: it does not certify wood chip mulch as suited to any plant, soil, or bed condition.
A gardener mulching beds and paths for a long-lasting finish: the beds are measured once, the depth is set by the planting, and the order is the budget line. A landscaper quoting a wood chip mulch install: the lookup table prices common sizes on the spot, and the calculator handles the odd shape. A homeowner covering a new border under trees: the border area, not the whole yard, is the area to enter. A groundskeeper topping up beds: the same formula prices the top-up if the area and the missing depth are measured first.
The arithmetic is exact for the inputs entered; the judgement is in the area and the depth. An area measured at the whole garden instead of the beds overstates the order badly, and an installed depth that later settles is not the depth plants enjoy. The model does not account for edging, drainage, weed fabric, delivery minimums, or how fast wood chip mulch breaks down in damp shade — confirm the mulch suits the garden before ordering. This page is a calculation tool, not gardening advice.
Wood chip mulch for 900 sq ft at 2-inch depth with 10% waste: 990.00 sq ft needed, 6.11 cubic yards exact, order 7 yards. Lookup table, branches, reverses. Source: Bright Side Kit, https://brightoolbox.com/wood-chip-mulch-chart/, accessed 30 October 2026 (2026-10-30).
Because suppliers sell whole yards and the chips settle: the 0.46 yard of rounding is the first top-up. Ordering exactly 6.11 is impossible, and ordering 6 leaves the beds short before settling even starts.
Just the beds and borders you will cover. Lawn, patios, and bare soil you leave unmulched need no wood chip mulch, and measuring them inflates the order by the whole unmulched area.
For wood chip mulch on beds, 2 inches is a light top-up depth: wood chips hold moisture and keep weeds down for a season, but beds that need real weed suppression want 3 to 4 inches. On beds with heavy rain, check the depth each season, because washing and settling thin the layer faster than sheltered beds do.
It suits beds and paths that want a long-lasting cover: wood chips break down slowly, so one install lasts longer than leaf or wood chip, but fresh chips can borrow a little nitrogen at the soil surface while they break down.
Break it into rectangles and add the areas, or measure the longest length times the longest width and accept a small overestimate. For an L-shaped bed, two rectangles are exact; a single bounding rectangle overstates the order, which is safer than understating it.
Check it each season: wood chip mulch settles slowly, so a bed laid at 2 inches is often nearer 1.5 inches a year later. Top up to the installed depth rather than adding a fresh full layer on top of the old one.