Quartzite mulch chart
Put your bed area, quartzite mulch depth and waste allowance in: 5400 sq ft at 3 inches with 10% waste needs 5,940.00 sq ft, 55.00 cubic yards exact — order 55 cubic yards.
★ CONSTRUCTION · MULCH · QUARTZITE MULCH CHART
On the defaults — a 5400 square foot bed at 3 inches deep with a 10% waste allowance — you need 5,940.00 square feet of cover, 55.00 cubic yards exact, so order 55 cubic yards. This is the QUARTZITE version — the mulch chart for quartzite, a hard pale stone that drains well, holds its colour and never breaks down — the sandstone-mulch-chart page is the SANDSTONE version, the granite-mulch-chart page is the GRANITE version, and the mulch-chart page is the GENERAL version for any loose mulch.
Put your bed area, quartzite mulch depth and waste allowance in: 5400 sq ft at 3 inches with 10% waste needs 5,940.00 sq ft, 55.00 cubic yards exact — order 55 cubic yards.
It means a 5400 square foot bed, once the 10% waste allowance is added, needs 5,940.00 square feet of cover at 3 inches deep — 1,485.00 cubic feet, which is 55.00 cubic yards. Because mulch is sold by the whole yard, you order 55 cubic yards: the exact figure lands exactly on a whole yard here, so the headroom is 0.00 yards, and any spillage must come from careful spreading rather than extra stone. At 3 inches, one cubic yard covers 108.0 square feet, so the same bed at 2 inches would need only 36.67 yards, and at 4 inches it would need 73.33 yards.
| Output | Formula | What it means |
|---|---|---|
| Area needed | area × (1 + waste ÷ 100) | 5,940.00 sq ft — 5400 × 1.10. |
| Volume in cubic feet | area needed × depth ÷ 12 | 1,485.00 cubic feet — 5,940.00 × 3 ÷ 12. |
| Exact volume | area needed × depth ÷ 324 | 55.00 cubic yards — 5,940.00 × 3 ÷ 324. |
| Order quantity | round exact volume up to a whole yard | 55 cubic yards — the next whole yard above 55.00, which is 55 itself. |
| Coverage per yard | 324 ÷ depth | 108.0 sq ft per yard — 324 ÷ 3. |
| Area behind a target volume | target volume × 324 ÷ depth ÷ (1 + waste ÷ 100) | 5400 sq ft — 55.00 × 324 ÷ 3 ÷ 1.10, rounded. |
| Depth behind a target volume | area needed × depth ÷ 324, solved for depth | 3 inches — the depth that turns 5,940.00 sq ft into 55.00 yards. |
| Waste behind a target volume | target volume × 324 ÷ depth ÷ area − 1, as a percent | 10% — the allowance that turns 5400 sq ft into 5,940.00 sq ft. |
First, measure the bed honestly: length times width for each bed, added together, with L-shaped beds split into rectangles. A guessed area moves the order by the same percentage as the guess. Second, keep the depth honest: quartzite does not break down, so the layer you spread is the layer that stays — but the stones scatter onto paths and lawns when raked or walked on, so edge the bed if you want the depth to hold. Third, do not skip the waste allowance on quartzite: the stones are angular and lock together, so they stay put better than round gravel on slopes, but spillage at the edges and uneven ground still eat into the load, so the 10% allowance is the difference between finishing the bed and running short with the truck already gone. Note the headline lands exactly on 55.00 yards with 0.00 headroom, so on a bed like this one, consider ordering one yard extra if your ground is uneven.
Area 5400 sq ft, depth 3 inches, waste 10%. Area needed: 5400 × 1.10 = 5,940.00 sq ft. Exact volume: 5,940.00 × 3 ÷ 324 = 55.00 cubic yards. Order: round 55.00 up to 55 cubic yards. Drop the waste to 0% and the exact volume falls to 50.00 yards, order 50; raise the waste to 5% and it is 52.50 yards, order 53; raise it to 15% and it is 57.50 yards, order 58. Drop the depth to 2 inches and it falls to 36.67 yards, order 37; raise it to 4 inches and it climbs to 73.33 yards, order 74. Depth moves the answer faster than waste does, because every inch adds a full layer across the whole bed.
Every row below applies 10% waste to the area first, then divides by 324: yards = area needed × depth ÷ 324, rounded up to the next whole yard for the order. Find your bed size and depth, read across, and order the last column.
| Area (sq ft) | Depth (inches) | Area needed (sq ft, 10% waste) | Exact (cubic yards) | Order |
|---|---|---|---|---|
| 250 | 2 | 275.00 | 1.70 | 2 cubic yards |
| 250 | 3 | 275.00 | 2.55 | 3 cubic yards |
| 500 | 2 | 550.00 | 3.40 | 4 cubic yards |
| 500 | 3 | 550.00 | 5.09 | 6 cubic yards |
| 750 | 3 | 825.00 | 7.64 | 8 cubic yards |
| 750 | 4 | 825.00 | 10.19 | 11 cubic yards |
| 1000 | 2 | 1,100.00 | 6.79 | 7 cubic yards |
| 1000 | 3 | 1,100.00 | 10.19 | 11 cubic yards |
| 1200 | 2 | 1,320.00 | 8.15 | 9 cubic yards |
| 1400 | 3 | 1,540.00 | 14.26 | 15 cubic yards |
| 1500 | 3 | 1,650.00 | 15.28 | 16 cubic yards |
| 1500 | 4 | 1,650.00 | 20.37 | 21 cubic yards |
| 1750 | 2 | 1,925.00 | 11.88 | 12 cubic yards |
| 2000 | 3 | 2,200.00 | 20.37 | 21 cubic yards |
| 2500 | 3 | 2,750.00 | 25.46 | 26 cubic yards |
| 3000 | 2 | 3,300.00 | 20.37 | 21 cubic yards |
A 5400 square foot bed at 3-inch depth with 0% waste gives 50.00 cubic yards exact, order 50 cubic yards. The same bed at 2-inch depth with 10% waste gives 36.67 cubic yards exact, order 37 cubic yards. A 5150 square foot bed at 3-inch depth with 10% waste gives 52.45 cubic yards exact, order 53 cubic yards. A 5650 square foot bed at 3-inch depth with 10% waste gives 57.55 cubic yards exact, order 58 cubic yards. Each branch changes exactly one input, so the difference from 55.00 isolates that input.
The area behind 55.00 cubic yards is 5400 sq ft: at 5150 sq ft the figures are 52.45 cubic yards exact, order 53 cubic yards, and at 5650 sq ft they are 57.55 cubic yards exact, order 58 cubic yards. The depth behind 55.00 cubic yards is 3 inches: at 2 inches the figures are 36.67 cubic yards exact, order 37 cubic yards, and at 4 inches they are 73.33 cubic yards exact, order 74 cubic yards — one inch either way moves the order by about 18.0 yards. The waste behind 55.00 cubic yards is 10%: at 5% the figures are 52.50 cubic yards exact, order 53 cubic yards, and at 15% they are 57.50 cubic yards exact, order 58 cubic yards — waste moves the exact volume, and at 15% it lifts the order to 58 yards.
The defaults assume a flat 5400 square foot bed, a uniform 3-inch layer, and a 10% waste allowance. Real quartzite beds are rarely flat: slopes shed stones downhill, paths and tree trunks eat into the area, and loose stones wander into the lawn, so measure the planted area only and keep the waste allowance on sloped ground. Zero square feet is the honest edge: 0.00 cubic yards exact, order 0. A depth of zero or below, a negative area, or a negative waste allowance is rejected, because none of them describes a real bed.
A gardener dressing beds with quartzite: the 5400 square foot headline is a large garden bed, and the table covers everything from a 250 square foot border to a 3000 square foot yard. A landscaper quoting a quartzite job: the waste column protects the quote, and the order column is the number given to the supplier. A homesteader spreading bulk quartzite on paths: the 3-inch rows are the bed depths, and the 2-inch rows are the path depths. A community garden coordinator splitting a bulk delivery: each plot reads its own row, and the orders add up to the truckload.
The arithmetic is exact for the inputs entered; the judgement is in the inputs. A guessed area, a depth measured before the stones scatter, or a skipped waste allowance will each move the answer by exactly the amount of the error, every load. The model does not include stones scattering into lawns, delivery minimums, or compaction — a supplier may sell only in whole yards or charge extra below a minimum, so confirm the order quantity with the supplier. This page is a calculation tool, not landscaping advice.
Quartzite mulch 5400 sq ft at 3-inch depth with 10% waste needs 5,940.00 sq ft, 55.00 cubic yards exact, order 55 yards. Free calculator, plus 16-row table. Source: Bright Side Kit, https://brightoolbox.com/quartzite-mulch-chart/, accessed 31 October 2026 (2026-10-31).
Because waste is lost cover: spillage, scattering and uneven ground mean you need more covered area than the bed measures. Adding 10% to the area, then converting to yards, keeps the waste in the same units as the bed. Applying it after the conversion gives the same number here, but the area-first order keeps the table readable.
Three inches is the standard bed layer on this page, and 2 inches suit paths and top-ups. Quartzite does not break down, so a 3-inch spread stays 3 inches; if stones scatter, rake them back or top up the thin spots.
Quartzite is mineral, so it carries no weed seeds at all; weeds can still root in the dust and debris that collects on top of it, so use fabric underneath and clear the debris. This calculator prices volume only and does not judge the gardening choice.
Split it into rectangles, measure each, and add the areas before entering the total. A circle uses radius times radius times 3.14. Guessing one number for an irregular bed is the most common reason orders come up short.
Because mulch is sold by the whole yard, and 55.00 already lands on a whole yard — the order is 55, with 0.00 yards of headroom. On uneven ground, consider one extra yard, because there is no spare stone in the headline figure to cover spillage.
The volume math is the same for any loose mulch — area, depth and waste convert the same way — but settling and coverage differ by material. Quartzite does not settle like bark, so use the quartzite rows for quartzite and the matching chart for bark or wood chips.