Limestone chart calculator
Put your area, depth and waste allowance in: 400 square feet at 2 inches with 10% waste needs 440.00 square feet, 2.72 cubic yards exact, order 3 cubic yards.
★ CONSTRUCTION · MATERIALS · LIMESTONE CHART
On the defaults — 400 square feet at 2 inches deep with a 10% waste allowance — you need 440.00 square feet of coverage, 2.72 cubic yards exact, so order 3 cubic yards of limestone. This is the LIMESTONE version of the coverage chart — the river-rock-chart page is the RIVER ROCK version — 400 square feet at 2 inches with 10% waste; the pea-gravel-chart page is the PEA GRAVEL version — 300 square feet at 3 inches with 10% waste; the sand-chart page is the SAND version — 400 square feet at 1 inch with 10% waste; and the stone-coverage-chart page is the STONE version — 100 square feet at 3 inches with 10% waste, quoted in tons.
Put your area, depth and waste allowance in: 400 square feet at 2 inches with 10% waste needs 440.00 square feet, 2.72 cubic yards exact, order 3 cubic yards.
It means that a 400-square-foot bed at 2 inches deep needs 440.00 square feet of coverage once a 10% waste allowance is added, and one cubic yard of limestone covers 162 square feet at that depth, so the exact figure is 2.72 cubic yards and the order is 3 cubic yards. The two steps are the whole story in miniature: the waste step turns the measured area into the area you must actually cover, and the coverage step turns that area into yards. The part people get wrong is ordering the exact figure: 2.72 yards cannot be delivered as a fraction by most suppliers, and rounding down to 2 yards leaves 0.72 yards — about 117 square feet — uncovered. The other part people get wrong is skipping the waste allowance: 400 square feet at 2 inches with no waste is 2.47 yards, which still orders 3, but on a larger bed the same omission can drop the order a full yard short.
Is 400 square feet really the bed, or the whole garden? Four hundred square feet is the ground the limestone actually covers, and it is the figure the whole calculation turns on: the 600-square-foot branch needs 4.07 yards against the 2.72 headline, so 200 extra square feet are 1.35 yards and a whole extra yard on the order. Measure length times width of the bed itself, and leave paths, planting holes, and edging strips out of the area — every square foot counted twice is coverage bought twice.
Is 2 inches really the depth, or the depth at the middle? Two inches is the finished depth across the whole bed, and it is the figure the coverage turns on: the 4-inch branch needs 5.43 yards against the 2.72 headline, so doubling the depth doubles the order. A bed that is 2 inches at the edges and 4 inches in the dips averages deeper than 2 inches — measure the depth in several places and use the honest average, not the shallowest reading.
Is 10% waste right for your ground? Ten percent is the allowance for spreading loss, uneven ground, and edging gaps, and it is the figure the needed area turns on: the 0%-waste branch needs 2.47 yards against the 2.72 headline, so the waste line is 0.25 yards on this bed. Use 0% only for a perfectly flat, measured area; uneven ground, a long wheelbarrow haul, or a bed with many curves usually earns the full 10%, and a supplier minimum load may round the order up further.
On the defaults: 400 square feet, 2 inches deep, 10% waste.
And the other way: the area behind 2.72 cubic yards is 400 square feet, the depth behind 2.72 cubic yards is 2 inches, and the waste behind 2.72 cubic yards is 10%. With 0 square feet the model honestly shows 0.00 cubic yards and an order of 0, because a bed with no area needs no limestone — an edge that shows the area is entered independently of the depth. And 162 square feet at 2 inches with 0% waste lands exactly on 1.00 cubic yard and orders exactly 1, not 2, because an exact integer is already a whole load.
Every row below is the same model at 10% waste: needed area is the area times 1.10, coverage is 324 divided by depth, and the order is the exact figure rounded up. Find your area and depth, read across, and order the figure in the last column — do not round down, because a short load leaves the bed thin at the far end.
| Area (sq ft) | Depth (inches) | Needed area (sq ft) | Exact cubic yards | Order |
|---|---|---|---|---|
| 150 | 1 | 165.00 | 0.51 | 1 cubic yard |
| 150 | 2 | 165.00 | 1.02 | 2 cubic yards |
| 150 | 3 | 165.00 | 1.53 | 2 cubic yards |
| 150 | 4 | 165.00 | 2.04 | 3 cubic yards |
| 300 | 1 | 330.00 | 1.02 | 2 cubic yards |
| 300 | 2 | 330.00 | 2.04 | 3 cubic yards |
| 300 | 3 | 330.00 | 3.06 | 4 cubic yards |
| 300 | 4 | 330.00 | 4.07 | 5 cubic yards |
| 450 | 1 | 495.00 | 1.53 | 2 cubic yards |
| 450 | 2 | 495.00 | 3.06 | 4 cubic yards |
| 450 | 3 | 495.00 | 4.58 | 5 cubic yards |
| 450 | 4 | 495.00 | 6.11 | 7 cubic yards |
| 600 | 1 | 660.00 | 2.04 | 3 cubic yards |
| 600 | 2 | 660.00 | 4.07 | 5 cubic yards |
| 600 | 3 | 660.00 | 6.11 | 7 cubic yards |
| 600 | 4 | 660.00 | 8.15 | 9 cubic yards |
The defaults are 400 square feet at 2-inch depth with 10% waste, so the headline is one modest limestone bed — a path border, a drainage strip, or a small garden bed. The model is a multiplication and a division: the needed area is area times the waste factor, the coverage per cubic yard is 324 divided by depth in inches, and the exact figure is needed area divided by coverage, rounded up to order. The area reverse is checked at 50 square feet either side, because 50 square feet at 2 inches with 10% waste is 0.34 yard; the depth reverse is checked at 0.5 inches either side, because half an inch either way moves the coverage by a wide margin at shallow depths; the waste reverse is checked at 5% either side, because 5% of 400 square feet is 20 square feet, or 0.12 yard. The model does not include limestone size, moisture weight, compaction, or delivery minimums — a supplier may round an order of 3 cubic yards up to a minimum load, and wet limestone weighs far more than dry limestone per yard.
| Output | Formula | What it means |
|---|---|---|
| Coverage per cubic yard | 324 ÷ depth in inches | 162 sq ft — 324 ÷ 2, one cubic yard covers 162 square feet at 2 inches. |
| Needed area | area × (1 + waste ÷ 100) | 440.00 sq ft — 400 × 1.10. |
| Exact cubic yards | needed area ÷ coverage per cubic yard | 2.72 — 440.00 ÷ 162. |
| Order | exact cubic yards rounded up | 3 cubic yards — 2.72 rounded up, never down. |
| 400 square feet, 2-inch depth, 0% waste | same model | 2.47 cubic yards exact — order 3 cubic yards. |
| 400 square feet, 4-inch depth, 10% waste | same model | 5.43 cubic yards exact — order 6 cubic yards. |
| 600 square feet, 2-inch depth, 10% waste | same model | 4.07 cubic yards exact — order 5 cubic yards. |
| 200 square feet, 2-inch depth, 10% waste | same model | 1.36 cubic yards exact — order 2 cubic yards. |
| Area behind 2.72 cubic yards | reverse | 400 sq ft: 2.72 cubic yards exact — order 3 cubic yards. |
| Depth behind 2.72 cubic yards | reverse | 2 inches: 2.72 cubic yards exact — order 3 cubic yards. |
| Waste behind 2.72 cubic yards | reverse | 10% waste: 2.72 cubic yards exact — order 3 cubic yards. |
| 0 square feet | same model | 0.00 cubic yards exact — order 0 cubic yards. |
| Negative area | same model | Area — 0 or more. |
| Zero depth | same model | Depth — more than 0. |
| 162 square feet, 0% waste | same model | 1.00 cubic yards exact — order 1 cubic yard. |
Figures are the model’s own arithmetic on the numbers you type, computed from unrounded values and displayed rounded HALF_UP to 2dp. The main limitation is the inputs, not the arithmetic: whether the area is the bed alone, whether the depth is an honest average, and whether the waste allowance fits the ground are all judgement calls, and this page prices the figures you enter without checking them. This page is a calculation tool, not a landscaping or construction specification.
Limestone for 400 sq ft at 2 inches with 10% waste needs 440.00 sq ft, 2.72 cubic yards exact, order 3 cubic yards, plus a 16-row lookup table. Source: Bright Side Kit, https://brightoolbox.com/limestone-chart/, accessed 29 October 2026.
Crushed limestone is used as a decorative ground cover, a drainage layer, and a path base: it drains well, suppresses weeds under a bed, and compacts into a firm surface. This chart prices it by volume, the way bulk suppliers sell it.
Two inches is the usual decorative depth, and it is the default here; a path or parking strip that takes weight is usually 3 to 4 inches, and the lookup table prices those depths directly. A thinner layer shows the ground through it, so depth is worth measuring honestly.
Because suppliers deliver whole yards, and rounding down leaves part of the bed uncovered: 0.72 yards short is about 117 square feet at 2 inches. The leftover from rounding up spreads thinner at the edges or tops up the next bed.
On flat, measured ground you can use less, but spreading loss, uneven ground, and edging gaps consume real material, and the allowance is only 0.25 yards on this bed. The 0%-waste branch is shown so you can compare the two figures before deciding.
Ask the supplier for the tons-per-yard conversion for their limestone before ordering, because density varies by stone size and moisture. This chart works in cubic yards, so convert the exact figure — 2.72 yards — with the supplier’s own factor, not a guess.
Yes, and the chart does not model it: freshly spread limestone settles under rain and foot traffic, so a bed can look thinner after a few weeks. Ordering the rounded-up figure, rather than the exact one, is the usual buffer against that settling.