Crushed stone chip chart calculator
Put your area, depth and waste allowance in: 750 sq ft at 3 inches with 10% waste needs 825.00 sq ft — 7.64 cubic yards exact, order 8 cubic yards.
★ CONSTRUCTION · LANDSCAPING · CRUSHED STONE
On the defaults — 750 square feet of crushed stone chips at 3 inches deep with a 10% waste allowance — you need 825.00 square feet of cover, which is 7.64 cubic yards exact, so order 8 cubic yards. This is the CRUSHED STONE chart — plain crushed stone chips for beds, paths and borders priced by the yard — the red-rock-chip-chart page is the RED ROCK version — warm red stone chips for beds and borders priced the same way; the pea-gravel-chip-chart page is the PEA GRAVEL version — small rounded stone for paths and beds priced the same way; the volcanic-rock-chip-chart page is the VOLCANIC ROCK version — dark porous stone for beds priced the same way; and the terracotta-chip-chart page is the TERRACOTTA version — warm clay chips for beds priced the same way.
Put your area, depth and waste allowance in: 750 sq ft at 3 inches with 10% waste needs 825.00 sq ft — 7.64 cubic yards exact, order 8 cubic yards.
It means that 750 square feet at 3 inches deep, plus a 10% waste allowance, needs 825.00 square feet of cover — and at 108 square feet per cubic yard at this depth, that is 7.64 cubic yards exact, so 8 yards ordered. The three lines are the whole story in miniature: the waste line grows the area, the coverage line converts depth into square feet per yard, and the order line rounds up so the job is never left short. The part people get wrong is ordering the exact figure: 7.64 yards ordered as 7 leaves part of the bed bare, while ordering 8 leaves a small surplus that tops up thin spots. The other part people get wrong is the reverse — measuring the loose depth off the truck instead of the settled depth, which understates the order by exactly the settling gap.
Is 750 square feet really the area? Seven hundred fifty square feet is the bed size, and it is the figure the needed area turns on: the 900-square-foot branch needs 9.17 cubic yards against the 7.64 headline, so a 150-square-foot measuring difference is about 1.5 yards. Measure at the widest points, split irregular shapes into rectangles, and re-check any area paced out rather than taped — a guessed area is the fastest way to misstate the order.
Is 3 inches really the settled depth? Three inches is the finished layer, and it is the figure the coverage turns on: the 2-inch branch needs only 5.09 cubic yards against the 7.64 headline, so a 1-inch depth difference is about 2.5 yards. A depth taken loose off the truck settles thinner, so enter the depth the bed should hold after compacting and rain, not the depth it holds on delivery day.
Does 10% waste fit your ground? Ten percent is the allowance, and it is the figure the needed area turns on: the 0%-waste branch needs 6.94 cubic yards against the 7.64 headline, so the allowance itself is about 0.7 of a yard here. Flat, edged beds hold close to 10%; rough, sloped or unedged ground spills more, and a bigger allowance is cheaper than a second delivery fee.
On the defaults: 750 square feet, 3-inch depth, 10% waste.
And the other way: the area behind 7.64 cubic yards is 750 square feet, the depth behind it is 3 inches, and the waste behind it is 10%. With 0 square feet the model honestly shows 0.00 cubic yards, because an empty bed needs no stone — an edge that shows the area is entered independently of the depth.
Every row below is the same formula at 10% waste: needed area is area × 1.10, exact cubic yards are needed area × depth ÷ 324, and the order is the exact figure rounded up. Find your area row and depth column, or use the calculator above for any size the table does not list.
| Area (sq ft) | Depth (inches) | Needed area (sq ft) | Exact cubic yards | Order |
|---|---|---|---|---|
| 500 | 2 | 550.00 | 3.40 | 4 cubic yards |
| 500 | 3 | 550.00 | 5.09 | 6 cubic yards |
| 500 | 4 | 550.00 | 6.79 | 7 cubic yards |
| 500 | 6 | 550.00 | 10.19 | 11 cubic yards |
| 750 | 2 | 825.00 | 5.09 | 6 cubic yards |
| 750 | 3 | 825.00 | 7.64 | 8 cubic yards |
| 750 | 4 | 825.00 | 10.19 | 11 cubic yards |
| 750 | 6 | 825.00 | 15.28 | 16 cubic yards |
| 1000 | 2 | 1,100.00 | 6.79 | 7 cubic yards |
| 1000 | 3 | 1,100.00 | 10.19 | 11 cubic yards |
| 1000 | 4 | 1,100.00 | 13.58 | 14 cubic yards |
| 1000 | 6 | 1,100.00 | 20.37 | 21 cubic yards |
| 1500 | 2 | 1,650.00 | 10.19 | 11 cubic yards |
| 1500 | 3 | 1,650.00 | 15.28 | 16 cubic yards |
| 1500 | 4 | 1,650.00 | 20.37 | 21 cubic yards |
| 1500 | 6 | 1,650.00 | 30.56 | 31 cubic yards |
The defaults are 750 square feet at 3 inches with 10% waste, so the headline is one bed, path or border with a common working depth and a standard allowance for spillage and uneven ground. The model is a multiplication, a division and a round-up: the needed area is area times one plus waste, the exact yards are needed area times depth divided by 324, and the order is the exact figure rounded up to the next whole yard. The area reverse is checked at 50 square feet either side, because 50 square feet at 3 inches with waste is about half a yard; the depth reverse is checked at half an inch either side, because half an inch over 825 square feet is about 1.3 yards; the waste reverse is checked at 5 points either side, because 5 points on 750 square feet at 3 inches is about 0.35 of a yard. The model does not include delivery fees, edging, landscape fabric, or compaction beyond the settled depth — price those separately, and re-check the order when the bed size or the depth changes.
| Output | Formula | What it means |
|---|---|---|
| Needed area | area × (1 + waste ÷ 100) | 825.00 sq ft — 750 × 1.10. |
| Coverage per cubic yard | 324 ÷ depth in inches | 108 sq ft — 324 ÷ 3. |
| Exact cubic yards | needed area × depth ÷ 324 | 7.64 — 825.00 × 3 ÷ 324. |
| Order | exact cubic yards, rounded up | 8 cubic yards — 7.64 rounded up. |
| 750 square feet, 3-inch depth, 0% waste | same model | 6.94 cubic yards exact — order 7 cubic yards. |
| 750 square feet, 2-inch depth, 10% waste | same model | 5.09 cubic yards exact — order 6 cubic yards. |
| 900 square feet, 3-inch depth, 10% waste | same model | 9.17 cubic yards exact — order 10 cubic yards. |
| 500 square feet, 3-inch depth, 10% waste | same model | 5.09 cubic yards exact — order 6 cubic yards. |
| Area behind 7.64 cubic yards | reverse | 750 sq ft: 7.64 cubic yards exact — order 8 cubic yards. |
| Depth behind 7.64 cubic yards | reverse | 3 inches: 7.64 cubic yards exact — order 8 cubic yards. |
| Waste behind 7.64 cubic yards | reverse | 10% waste: 7.64 cubic yards exact — order 8 cubic yards. |
| 0 square feet | same model | 0.00 cubic yards exact — order 0 cubic yards. |
| Negative area | same model | Area — 0 or more. |
| Zero depth | same model | Depth — more than 0. |
| Negative waste | same model | Waste allowance — 0 or more. |
| 324 square feet, 0% waste | same model | 3.00 cubic yards exact — order 3 cubic yards. |
Figures are the model’s own arithmetic on the numbers you type, computed from unrounded values and displayed rounded HALF_UP to 2dp, with the order rounded up to the next whole yard. The main limitation is the inputs, not the arithmetic: whether the area is measured at the widest points, whether the depth is the settled layer, and whether the waste allowance fits the ground are all judgement calls, and this page prices the figures you enter without checking them. This page is a calculation tool, not landscaping advice.
750 sq ft of crushed stone chips at 3 inches with 10% waste needs 825.00 sq ft: 7.64 cubic yards exact, order 8 yards. Source: Bright Side Kit, https://brightoolbox.com/crushed-stone-chip-chart/, accessed 29 October 2026.
Because a cubic yard is 27 cubic feet, and a square foot times an inch is one twelfth of a cubic foot: 27 × 12 is 324, so area in square feet times depth in inches divided by 324 gives cubic yards directly. The constant is unit conversion, not a property of crushed stone.
Because a short bed cannot be finished with a fraction of a delivery: 7.64 yards ordered as 7 leaves 0.64 yards of bed bare, while ordering 8 leaves a small surplus that tops up thin spots. Rounding up is the only direction that never leaves the job unfinished.
Split it into rectangles and triangles, work out each piece, and add the areas before typing the total in: a curved bed measured as one big rectangle overstates the order, while a winding bed measured at its widest points alone does the same. Measure twice, order once.
Yes — a loose layer compacts under foot traffic and rain, so the depth to enter is the finished, settled depth, not the fluffy depth straight off the truck. If you order for 3 inches loose and it settles to 2.5, the bed ends up thin; the waste allowance helps, but it does not replace measuring the settled layer.
Three inches is the usual working depth for a garden path: deep enough to stay put and drain well, shallow enough to keep the surface even without burying edging. Driveways and heavy-use areas go deeper, and anything under 2 inches tends to scatter and expose the ground beneath within a season.
Yes, when your size is listed: every row is the same formula at 10% waste, so find your area and depth and read the order straight off. For any size the table does not list, or any waste allowance other than 10%, use the calculator above — it runs the identical arithmetic on your exact numbers.