Crushed glass chip chart calculator
Put your area, depth and waste allowance in: 750 sq ft at 3 inches with 10% waste needs 825.00 sq ft, 7.64 cubic yards exact — order 8 yards.
★ CONSTRUCTION · GARDEN · CRUSHED GLASS CHIP CHART
On the defaults — 750 square feet of crushed glass chips at 3 inches deep with 10% waste — you need 825.00 square feet of cover, 7.64 cubic yards exact, so order 8 cubic yards. This is reference table #444 — the quartz-chip-chart page is table #443 — 900 square feet at 3 inches with 10% waste; the basalt-chip-chart page is the basalt version; the granite-chip-chart page is the granite version; and the construction hub collects the whole chip-chart library.
Put your area, depth and waste allowance in: 750 sq ft at 3 inches with 10% waste needs 825.00 sq ft, 7.64 cubic yards exact — order 8 yards.
It means that a 750-square-foot bed at 3 inches deep, with 10% allowed for waste, needs 825.00 square feet of cover, which works out to 7.64 cubic yards before rounding — and since chips are ordered by the whole yard, you order 8. The three numbers are the whole story in miniature: the waste allowance lifts the measured area to the area you actually have to cover, the depth turns that area into a volume, and the rounding turns an exact volume into an order you can place. The part people get wrong is ordering the exact figure: 7.64 cubic yards cannot be delivered as 7.64, so ordering 7 leaves the bed short, and the shortfall shows up at the far end of the bed where it is hardest to fix. The other part people get wrong is skipping the waste allowance: a 750-square-foot bed ordered without it is 6.94 cubic yards, and the missing 0.70 cubic yards is exactly the spillage and edge trimming the allowance exists to cover.
Is 750 square feet really the bed? Seven hundred fifty square feet is the measured area, and it is the figure the whole calculation turns on: the 1000-square-foot branch orders 11 yards against the 8-yard headline, so a 250-square-foot measuring difference is 3 whole yards. Measure at the widest points, split irregular beds into sections and add them, and re-measure after edging is set — edging moves the boundary and the boundary moves the area.
Is 3 inches really the finished depth? Three inches is the settled layer, and it is the figure the volume turns on: the 2-inch branch orders 6 yards against the 8-yard headline, so a 1-inch depth difference is 2 whole yards. Chips settle and spread under foot traffic, so set the depth after compaction, not from the loose pile — a loose 3 inches that settles to 2 leaves the bed thin within a season.
Is 10% really the right waste allowance? Ten percent is the middle allowance, and it is the figure the needed area turns on: the 0%-waste branch orders 7 yards against the 8-yard headline, so the allowance alone is worth a whole yard here. A tidy flat bed can run 5%, while a sloped bed, a bed with many edges, or a first-time spreader may need 15% — and the waste reverse shows 15% still ordering 8 yards, so the extra allowance here costs nothing in whole yards.
On the defaults: 750 square feet, 3-inch depth, 10% waste.
And the other way: the area behind 7.64 cubic yards is 750 square feet, the depth behind it is 3 inches, and the waste behind it is 10%. With 324 square feet at 0% waste the model honestly shows 3.00 cubic yards exact and an order of 3 — the one case where the exact figure is already whole, so rounding changes nothing.
Every row below is the same formula at 10% waste: needed area is area × 1.10, exact cubic yards are needed area × depth ÷ 324, and the order is the exact figure rounded up. Find your area row and depth column, or use the calculator above for any size the table does not list.
| Area (sq ft) | Depth (inches) | Needed area (sq ft) | Exact cubic yards | Order |
|---|---|---|---|---|
| 500 | 2 | 550.00 | 3.40 | 4 cubic yards |
| 500 | 3 | 550.00 | 5.09 | 6 cubic yards |
| 500 | 4 | 550.00 | 6.79 | 7 cubic yards |
| 500 | 6 | 550.00 | 10.19 | 11 cubic yards |
| 1000 | 2 | 1,100.00 | 6.79 | 7 cubic yards |
| 1000 | 3 | 1,100.00 | 10.19 | 11 cubic yards |
| 1000 | 4 | 1,100.00 | 13.58 | 14 cubic yards |
| 1000 | 6 | 1,100.00 | 20.37 | 21 cubic yards |
| 1500 | 2 | 1,650.00 | 10.19 | 11 cubic yards |
| 1500 | 3 | 1,650.00 | 15.28 | 16 cubic yards |
| 1500 | 4 | 1,650.00 | 20.37 | 21 cubic yards |
| 1500 | 6 | 1,650.00 | 30.56 | 31 cubic yards |
| 2000 | 2 | 2,200.00 | 13.58 | 14 cubic yards |
| 2000 | 3 | 2,200.00 | 20.37 | 21 cubic yards |
| 2000 | 4 | 2,200.00 | 27.16 | 28 cubic yards |
| 2000 | 6 | 2,200.00 | 40.74 | 41 cubic yards |
The defaults are 750 square feet, 3-inch depth and 10% waste, so the headline is one medium garden bed dressed with crushed glass chips at a standard mulch depth. The model is a multiplication, a division and a rounding up: the needed area is area times one plus waste over 100, the exact volume is needed area times depth divided by 324 — the constant that converts square feet times inches into cubic yards — and the order is that volume rounded up to the next whole yard. The area reverse is checked at 50 square feet either side, because 50 square feet at 3 inches is about 0.46 cubic yards; the depth reverse is checked at 0.5 inches either side, because half an inch over 825 square feet is about 1.27 cubic yards; the waste reverse is checked at 5% either side, because 5% of 750 square feet at 3 inches is about 0.35 cubic yards. The model does not include delivery minimums, the weight of the load, or any base layer under the chips — price those separately, and re-check the order when the bed size or the depth changes.
| Output | Formula | What it means |
|---|---|---|
| Needed area | area × (1 + waste ÷ 100) | 825.00 sq ft — 750 × 1.10. |
| Coverage per cubic yard | 324 ÷ depth in inches | 108 sq ft — 324 ÷ 3. |
| Exact cubic yards | needed area × depth ÷ 324 | 7.64 — 825.00 × 3 ÷ 324. |
| Order | exact cubic yards, rounded up | 8 cubic yards — 7.64 rounded up. |
| 750 square feet, 3-inch depth, 0% waste | same model | 6.94 cubic yards exact — order 7 cubic yards. |
| 750 square feet, 2-inch depth, 10% waste | same model | 5.09 cubic yards exact — order 6 cubic yards. |
| 1000 square feet, 3-inch depth, 10% waste | same model | 10.19 cubic yards exact — order 11 cubic yards. |
| 400 square feet, 3-inch depth, 10% waste | same model | 4.07 cubic yards exact — order 5 cubic yards. |
| Area behind 7.64 cubic yards | reverse | 750 sq ft: 7.64 cubic yards exact — order 8 cubic yards. |
| Depth behind 7.64 cubic yards | reverse | 3 inches: 7.64 cubic yards exact — order 8 cubic yards. |
| Waste behind 7.64 cubic yards | reverse | 10% waste: 7.64 cubic yards exact — order 8 cubic yards. |
| 0 square feet | same model | 0.00 cubic yards exact — order 0 cubic yards. |
| Negative area | same model | Area — 0 or more. |
| Zero depth | same model | Depth — more than 0. |
| Negative waste | same model | Waste allowance — 0 or more. |
| 324 square feet, 0% waste | same model | 3.00 cubic yards exact — order 3 cubic yards. |
Figures are the model’s own arithmetic on the numbers you type, computed from unrounded values and displayed rounded HALF_UP to 2dp, with the order rounded up to the next whole yard. The main limitation is the inputs, not the arithmetic: whether the area is measured at the widest points, whether the depth is the settled layer, and whether the waste allowance fits the ground are all judgement calls, and this page prices the figures you enter without checking them. This page is a calculation tool, not landscaping advice.
750 sq ft of crushed glass chips at 3 inches with 10% waste needs 825.00 sq ft: 7.64 cubic yards exact, order 8 yards. Source: Bright Side Kit, https://brightoolbox.com/crushed-glass-chip-chart/, accessed 29 October 2026.
Because a cubic yard is 27 cubic feet, and a square foot times an inch is one twelfth of a cubic foot: 27 × 12 is 324, so area in square feet times depth in inches divided by 324 gives cubic yards directly. The constant is unit conversion, not a property of crushed glass.
Because a short bed cannot be finished with a fraction of a delivery: 7.64 yards ordered as 7 leaves 0.64 yards of bed bare, while ordering 8 leaves a small surplus that tops up thin spots. Rounding up is the only direction that never leaves the job unfinished.
Split it into rectangles and triangles, measure each section, and add the sections for the total area — then enter that total. A single guessed rectangle over an irregular bed is the most common cause of a short order.
The settled depth: chips compact under foot traffic and weather, so a loose 3-inch spread that settles to 2 inches leaves the bed thin. Measure the depth you want after the chips have settled, and enter that.
10% is the middle default: 5% suits a tidy flat bed, 15% suits a sloped bed, a bed with many edges, or a first-time spreader. On these defaults 15% still orders 8 yards, so the extra allowance costs nothing in whole yards here — check your own size in the calculator before deciding.
Yes, and the model does not price weight: glass chips are far denser than bark mulch, so the same 8 cubic yards is a much heavier load. Check the supplier's weight limits and delivery terms separately before ordering.