CALCULATOR · CONSTRUCTION · CONCRETE

Concrete Slab Calculator

A 12 × 10 ft slab, 4 inches thick, with 10% waste: that is 40.00 cubic feet of concrete (44.00 with waste), or 1.63 cubic yards. In bags: 74 eighty-pound bags, 98 sixty-pound, or 147 forty-pound. As ready-mix at $150 a cubic yard: $244.44. Enter your slab below — yards, all three bag sizes, and the ready-mix price in one click.

412

Concrete for a slab

Cubic yards, 40/60/80-lb bag counts, and ready-mix cost for any rectangular slab, with waste priced in.

The slab's long side in feet. 12 is a typical shed or small patio. Must be positive.

The slab's short side in feet. Must be positive.

Slab thickness in inches. 4 is standard for patios and sheds; 6 for driveways. 1 to 24.

Extra concrete for spillage, uneven forms, and over-excavation. 10% is the professional default. 0 to 100.

Your local ready-mix price per cubic yard. $150 is a 2026 estimate — call your plant for the real number. Cannot be negative.

Result—Enter values above

Enter values to see the result.

The 60-second rule

Cubic feet = length × width × (thickness ÷ 12). Cubic yards = cubic feet ÷ 27. Bags = round up (cubic feet ÷ yield per bag), with waste added first. At the defaults: 12 × 10 × (4÷12) = 40.00 ft³; with 10% waste, 44.00 ft³ = 1.63 yd³; 44 ÷ 0.6 = 74 eighty-pound bags; at $150/yd³, $244.44 of ready-mix.

The worked example, line by line

Setup: 12 × 10 ft slab, 4 inches thick, 10% waste, $150 per cubic yard.

Volume. 12 × 10 × (4 ÷ 12) = 40.00 cubic feet. Waste: 40 × 1.10 = 44.00 cubic feet. Cubic yards: 44 ÷ 27 = 1.63 yd³ — the number the ready-mix plant wants.

Bags. An 80-lb bag yields 0.6 ft³: 44 ÷ 0.6 = 73.33 → 74 bags. A 60-lb bag yields 0.45 ft³: 44 ÷ 0.45 = 97.78 → 98 bags. A 40-lb bag yields 0.3 ft³: 44 ÷ 0.3 = 146.67 → 147 bags. Always rounded up — you cannot buy a third of a bag.

Ready-mix cost. 1.6296 yd³ × $150 = $244.44. Seventy-four bags at roughly $6 each would run you about $444 in materials plus a long afternoon of mixing — this is why anything over a yard usually goes ready-mix.

Branch — 6-inch driveway slab (12 × 10): 12 × 10 × 0.5 = 60.00 ft³; with waste, 66.00 ft³ = 2.44 yd³; bags 110 / 147 / 220; ready-mix $366.67. Two extra inches of thickness adds 50% to everything — thickness is the multiplier people underestimate.

Branch — 24 × 24 patio, 4 inches: 24 × 24 × (4÷12) = 192.00 ft³; with waste, 211.20 ft³ = 7.82 yd³; bags 353 / 470 / 705; ready-mix $1,173.33. Seven hundred five 40-lb bags — nobody is mixing this by hand.

Branch — 0% waste baseline: 40.00 ft³ = 1.48 yd³; bags 67 / 89 / 134; ready-mix $222.22. The waste factor is the difference between $222.22 and $244.44 — cheap insurance against coming up short mid-pour.

Output · formula · meaning

OutputFormulaWhat it means
Cubic feetlength × width × (thickness ÷ 12)40.00 ft³ at the defaults — the raw volume before waste.
Cubic yards (with waste)ft³ × (1 + waste%) ÷ 271.63 yd³ — what you order from the plant.
Bag counts⌈waste-adjusted ft³ ÷ yield per bag⌉74 eighty-lb (0.6 ft³), 98 sixty-lb (0.45), 147 forty-lb (0.3) — always rounded up.
Ready-mix costcubic yards × price per yard$244.44 at $150/yd³.

Who uses this

  • The DIY patio builder: a 12 × 10 slab is a weekend project — 1.63 yd³ tells you this sits right on the bags-vs-truck line.
  • The shed-foundation pourer: 4-inch slab math with waste included, so the last wheelbarrow doesn't come up empty.
  • The driveway estimator: switch thickness to 6 inches and watch the volume jump 50% — $366.67 of concrete for the 12 × 10 example.
  • The budget checker: comparing the $244.44 ready-mix quote against 74 bags at the hardware store before committing.

Accuracy & limitations

Bag yields (0.6 / 0.45 / 0.3 ft³) are standard nominal figures — real yield varies by mix and water content, so treat bag counts as minimums. Waste covers spillage, form bulge, and uneven subgrade; on a rough dig, 10% can be light — pros often use 10–15%. Ready-mix plants have minimum loads and short-load fees (often 2–3 yards); a 1.63-yd³ order may carry a surcharge — the price field is where you absorb it. This is a rectangular slab only; see our concrete tube calculator for piers and footings.

Cite this calculatorBright Side Kit. “Concrete Slab Calculator.” brightoolbox.com, 2026.Bright Side Kit. "Concrete Slab Calculator." https://brightoolbox.com/concrete-slab-calculator/ Accessed October 23, 2026.
Embed this calculator

Paste this into any web page to embed the live calculator. The “Bright Side Kit” link below it must stay intact.

Frequently asked questions

How much concrete do I need for a 12x10 slab?

At 4 inches thick with 10% waste: 1.63 cubic yards — or 74 eighty-pound bags, 98 sixty-pound bags, or 147 forty-pound bags. As ready-mix at $150 a yard, $244.44.

How many bags of concrete per cubic yard?

A cubic yard is 27 ft³. At a 0.6 ft³ yield, one yard takes 45 eighty-pound bags; 60 sixty-pound bags (0.45 ft³ each); 90 forty-pound bags (0.3 ft³ each).

Should I order ready-mix or mix bags myself?

The rough rule: over 1 cubic yard, ready-mix wins. This slab's 1.63 yd³ costs $244.44 as ready-mix vs about $444 in 80-lb bags — plus hours of mixing. Under a yard, bags are cheaper once the plant's short-load fee lands.

How thick should a concrete slab be?

4 inches for patios, sheds, and walkways; 6 inches for driveways and anything carrying vehicles. Going from 4 to 6 inches adds 50% to the concrete — the 12 × 10 example jumps from 1.63 to 2.44 yd³.

What does the 10% waste cover?

Spillage, forms that bulge under the pour, and subgrade that isn't perfectly level. It is the difference between $222.22 and $244.44 on this slab — cheap insurance against a short load mid-pour.

Can this handle a 24x24 patio?

Yes: 24 × 24 at 4 inches with 10% waste needs 7.82 cubic yards — 353 eighty-pound bags — at a ready-mix cost of $1,173.33. That's a truck job, not a bag job.