Concrete curing time chart — days to strength
How long does concrete take to cure? Enter the curing temperature and target strength to see the days to 50%, 70% and full strength — plus the full chart below.
★ CONSTRUCTION · CONCRETE · REFERENCE TABLE #240
7 days to 70% strength at 70°F — walk on after 3 days, drive on after 7 days. At 70°F concrete reaches 70% of its 28-day design strength in 7 days; at 40°F the same strength takes 21 days. Enter your temperature to see your days.
How long does concrete take to cure? Enter the curing temperature and target strength to see the days to 50%, 70% and full strength — plus the full chart below.
Concrete does not dry — it cures. The cement reacts with water in a chemical reaction called hydration, and that reaction builds strength over days and weeks. The warmer the concrete, the faster the reaction: at 70°F a standard mix reaches 70% of its 28-day design strength in 7 days, but at 40°F the same strength takes 21 days — three times as long. Below 40°F the reaction effectively stops, and water in the fresh concrete can freeze and crack it. The chart gives typical days to 50%, 70% and 100% of design strength at curing temperatures from 40°F to 80°F, per ACI 308 curing guidance, for a standard mix (water-cement ratio about 0.50). On the defaults — curing temperature 70°F, target strength 70% — the answer is 7 days; walk on after 3 days, drive on after 7 days.
| Curing temperature | 50% strength | 70% strength | 100% strength |
|---|---|---|---|
| 80°F | 2 days | 5 days | 21 days |
| 70°F | 3 days | 7 days | 28 days |
| 60°F | 4 days | 10 days | 35 days |
| 50°F | 6 days | 14 days | 42 days |
| 40°F | 9 days | 21 days | 56 days |
| 32°F | — | — | — |
At the defaults — curing temperature 70°F, target strength 70% — the days to target strength are 7, the walk-on days are 3 and the drive-on days are 7. Check the identities: days to target = the table value at the curing temperature, interpolated between rows; walk-on days = days to 50% strength at the same temperature; drive-on days = days to 70% strength at the same temperature. Between rows the days are interpolated linearly — at 65°F, halfway between the 60°F and 70°F rows, 70% takes 8.5 days. Above 80°F the 70/80°F slope is extrapolated up to 90°F; below 40°F the answer is —, curing effectively stops. Rounding convention: totals are computed from unrounded values, so rounded parts may differ by a cent from their rounded sum.
Setup: curing temperature 70°F, target strength 70%.
Line 1 — the days. 70°F is a table row, so the 70% column reads 7 days exactly — no interpolation needed.
Line 2 — walk on. The 50% column at 70°F reads 3 days — the slab is strong enough to walk on after 3 days.
Line 3 — drive on. The 70% column at 70°F reads 7 days — the slab is strong enough for a car after 7 days.
Line 4 — full strength. The 100% column at 70°F reads 28 days — the design strength the mix is sold by.
Line 5 — the cold check. At 40°F the same 70% takes 21 days — three times as long — and below 40°F the answer is —: curing effectively stops, so protect the slab from freezing.
Reverse: the temperature for 7 days at 70% strength is 70°F; at that temperature the days are 7. The temperature for 10 days at 70% is 60°F; at that temperature the days are 10. The temperature for 3 days at 50% is 70°F; at that temperature the days are 3. The temperature for 28 days at 100% is 70°F; at that temperature the days are 28.
50°F, target 70%: 14 days to 70% strength (walk-on 6 days, drive-on 14 days). At 50°F the concrete takes 14 days to reach 70% strength — twice as long as at 70°F. Walk on after 6 days, drive on after 14.
60°F, target 70%: 10 days to 70% strength (walk-on 4 days, drive-on 10 days). At 60°F it takes 10 days to reach 70% strength. Walk on after 4 days, drive on after 10.
80°F, target 70%: 5 days to 70% strength (walk-on 2 days, drive-on 5 days). At 80°F it takes 5 days to reach 70% strength. Walk on after 2 days, drive on after 5.
65°F, target 70%: 8.5 days to 70% strength (walk-on 3.5 days, drive-on 8.5 days). At 65°F, halfway between the 60°F and 70°F rows, it takes 8.5 days to reach 70% strength — the interpolation between 10 and 7 days.
55°F, target 70%: 12 days to 70% strength (walk-on 5 days, drive-on 12 days). At 55°F it takes 12 days to reach 70% strength — halfway between 14 days at 50°F and 10 days at 60°F.
45°F, target 50%: 7.5 days to 50% strength (walk-on 7.5 days, drive-on 17.5 days). At 45°F, target 50%, it takes 7.5 days to reach half strength — halfway between 9 days at 40°F and 6 days at 50°F.
70°F, target 50%: 3 days to 50% strength (walk-on 3 days, drive-on 7 days). At 70°F, target 50%, it takes 3 days to reach half strength — you can walk on the slab after 3 days.
70°F, target 100%: 28 days to 100% strength (walk-on 3 days, drive-on 7 days). At 70°F, target 100%, it takes 28 days to reach full strength — the 28-day design strength the mix is sold by.
75°F, target 70%: 6 days to 70% strength (walk-on 2.5 days, drive-on 6 days). At 75°F it takes 6 days to reach 70% strength — halfway between 7 days at 70°F and 5 days at 80°F.
85°F, target 70%: 4 days to 70% strength (walk-on 1.5 days, drive-on 4 days). At 85°F it takes 4 days to reach 70% strength — extrapolating the 70/80°F slope past the top row.
90°F, target 70%: 3 days to 70% strength (walk-on 1 days, drive-on 3 days). At 90°F it takes 3 days to reach 70% strength — the top of the extrapolation, and the cap: hotter than 90°F is clamped to 90°F.
72°F, target 70%: 6.6 days to 70% strength (walk-on 2.8 days, drive-on 6.6 days). At 72°F it takes 6.6 days to reach 70% strength — a fifth of the way from 7 days at 70°F toward 5 days at 80°F.
90°F, target 100%: 14 days to 100% strength (walk-on 1 days, drive-on 3 days). At 90°F, target 100%, it takes 14 days to reach full strength — extrapolating the 70/80°F slope for full strength.
68°F, target 100%: 29.4 days to 100% strength (walk-on 3.2 days, drive-on 7.6 days). At 68°F, target 100%, it takes 29.4 days to reach full strength — a fifth of the way from 28 days at 70°F toward 35 days at 60°F.
The model assumes a standard mix with a water-cement ratio of about 0.50, cured per ACI 308 guidance — kept moist and at temperature. It assumes the curing temperature is the average temperature over the first days, not a single reading: a slab poured at 70°F that drops to 45°F overnight cures slower than the 70°F row says. It assumes no accelerators, retarders or supplementary cementitious materials — admixtures shift every number. It assumes the concrete is kept moist: drying out stops hydration the same way cold does. With a curing temperature of 32°F the answer is — (curing effectively stops). With 35°F the answer is —. With 39°F the answer is —. With 40°F and a 70% target the answer is 21 days. With 100°F the temperature is clamped to 90°F and the answer is 3 days at 70%. Rounding convention: totals are computed from unrounded values, so rounded parts may differ by a cent from their rounded sum; the reverses are nearest-value solutions, and the exact unrounded figures (8.5, 7.5, 6.6, 29.4 days) are stated wherever the rounded figures appear.
| Output | Formula | What it means |
|---|---|---|
| Days to target strength | the table value at the curing temperature, interpolated between rows | 7. |
| Walk-on days | days to 50% strength at the same temperature | 3. |
| Drive-on days | days to 70% strength at the same temperature | 7. |
| Temperature for 7 days at 70% | the temperature where the 70% column reads 7 days | 70°F → 70°F. |
| Temperature for 10 days at 70% | the temperature where the 70% column reads 10 days | 60°F → 60°F. |
| Temperature for 3 days at 50% | the temperature where the 50% column reads 3 days | 70°F → 70°F. |
| Temperature for 28 days at 100% | the temperature where the 100% column reads 28 days | 70°F → 70°F. |
| 50°F, target 70% | same model | 14 days to 70% strength (walk-on 6 days, drive-on 14 days). |
| 60°F, target 70% | same model | 10 days to 70% strength (walk-on 4 days, drive-on 10 days). |
| 80°F, target 70% | same model | 5 days to 70% strength (walk-on 2 days, drive-on 5 days). |
| 65°F, target 70% | same model | 8.5 days to 70% strength (walk-on 3.5 days, drive-on 8.5 days). |
| 55°F, target 70% | same model | 12 days to 70% strength (walk-on 5 days, drive-on 12 days). |
| 45°F, target 50% | same model | 7.5 days to 50% strength (walk-on 7.5 days, drive-on 17.5 days). |
| 70°F, target 50% | same model | 3 days to 50% strength (walk-on 3 days, drive-on 7 days). |
| 70°F, target 100% | same model | 28 days to 100% strength (walk-on 3 days, drive-on 7 days). |
| 75°F, target 70% | same model | 6 days to 70% strength (walk-on 2.5 days, drive-on 6 days). |
| 85°F, target 70% | same model | 4 days to 70% strength (walk-on 1.5 days, drive-on 4 days). |
| 90°F, target 70% | same model | 3 days to 70% strength (walk-on 1 days, drive-on 3 days). |
| 72°F, target 70% | same model | 6.6 days to 70% strength (walk-on 2.8 days, drive-on 6.6 days). |
| 90°F, target 100% | same model | 14 days to 100% strength (walk-on 1 days, drive-on 3 days). |
| 68°F, target 100% | same model | 29.4 days to 100% strength (walk-on 3.2 days, drive-on 7.6 days). |
The math is exact arithmetic on your two inputs: days to target = the table value at the curing temperature, interpolated linearly between rows; walk-on days = days to 50% strength at the same temperature; drive-on days = days to 70% strength at the same temperature. The 1-decimal exact is shown where the interpolation matters: at 65°F the 70% time is 8.5 days; at 45°F the 50% time is 7.5 days; at 72°F the 70% time is 6.6 days; at 68°F the 100% time is 29.4 days. What the model cannot do is certify your slab: the values are typical for a standard mix per ACI 308 curing guidance, not a mix-design guarantee — your mix, your admixtures and your weather all move the numbers. For the mix itself, see the concrete mix calculator; for bag counts, see the concrete bag chart; for block work on the same job, see the concrete block size chart; for the joists above the slab, see the joist span chart; for the drywall inside, see the drywall screw spacing chart. This is a chart, not engineering advice.
Bright Side Kit. "Concrete Curing Time Chart: Days to Strength by Temp 2026" https://brightoolbox.com/concrete-curing-time-chart/ Accessed October 25, 2026.At 70°F, 7 days to 70% strength and 28 days to full strength. You can walk on it after 3 days and drive on it after 7. At 50°F, 70% takes 14 days; at 40°F it takes 21 days; below 40°F curing effectively stops.
Curing is a chemical reaction — cement reacting with water — not drying. The concrete needs water to cure: if it dries out, hydration stops and the concrete never reaches its strength. That is why fresh concrete is kept moist, not left to bake in the sun.
Hydration is a chemical reaction, and cold slows chemical reactions. At 40°F the reaction runs about a third as fast as at 70°F: 70% strength takes 21 days instead of 7. Below 40°F it effectively stops, and water in the fresh concrete can freeze and crack it — so cold-weather pours need blankets and insulation.
When it reaches 50% of its design strength — 3 days at 70°F, 6 days at 50°F, 9 days at 40°F. Walking on it earlier can scuff the surface and leave footprints that never come out.
When it reaches 70% of its design strength — 7 days at 70°F, 14 days at 50°F, 21 days at 40°F. A car is heavy: driving on a slab that has only reached 50% can crack it. Wait for the 70% number, not the walk-on number.
When the concrete is strong enough to hold its own shape — usually at 50% strength, the walk-on number. At 70°F that is 3 days; at 50°F it is 6 days. In cold weather, leave the forms on longer: they insulate the concrete while it cures.
Blankets, insulation, and keeping it above 40°F. Below 40°F curing effectively stops, so a slab poured in freezing weather needs insulated blankets or a heated enclosure. Never pour on frozen ground, and never let fresh concrete freeze in its first 24 hours.
Yes — but faster is not always better. At 80°F, 70% takes 5 days; at 90°F it takes 3 days. But hot concrete sets fast, cracks more easily, and can lose water before it cures. In heat, pour early in the day, keep the slab moist, and cure it under plastic or wet burlap.