Cedar Bark mulch chart
Put your bed area, cedar bark mulch depth and waste allowance in: 1800 sq ft at 3 inches with 10% waste needs 1,980.00 sq ft, 18.33 cubic yards exact — order 19 cubic yards.
★ CONSTRUCTION · MULCH · CEDAR BARK MULCH CHART
On the defaults — a 1800 square foot bed at 3 inches deep with a 10% waste allowance — you need 1,980.00 square feet of cover, 18.33 cubic yards exact, so order 19 cubic yards. This is the CEDAR BARK version — the mulch chart for cedar bark, which holds moisture, suppresses weeds and breaks down slowly over several seasons — the seaweed-mulch-chart page is the SEAWEED version, the rice-hull-mulch-chart page is the RICE HULL version, and the mulch-chart page is the GENERAL version for any loose mulch.
Put your bed area, cedar bark mulch depth and waste allowance in: 1800 sq ft at 3 inches with 10% waste needs 1,980.00 sq ft, 18.33 cubic yards exact — order 19 cubic yards.
It means a 1800 square foot bed, once the 10% waste allowance is added, needs 1,980.00 square feet of cover at 3 inches deep — 495.00 cubic feet, which is 18.33 cubic yards. Because mulch is sold by the whole yard, you order 19 cubic yards: the extra 0.67 yard covers settling and the thin spots every bed has. At 3 inches, one cubic yard covers 108.0 square feet, so the same bed at 2 inches would need only 12.22 yards, and at 4 inches it would need 24.44 yards.
| Output | Formula | What it means |
|---|---|---|
| Area needed | area × (1 + waste ÷ 100) | 1,980.00 sq ft — 1800 × 1.10. |
| Exact volume | area needed × depth ÷ 324 | 18.33 cubic yards — 1,980.00 × 3 ÷ 324. |
| Order quantity | round exact volume up to a whole yard | 14 cubic yards — the next whole yard above 18.33. |
| Coverage per yard | 324 ÷ depth | 108.0 sq ft per yard — 324 ÷ 3. |
| Area behind a target volume | target volume × 324 ÷ depth ÷ (1 + waste ÷ 100) | 1800 sq ft — 18.33 × 324 ÷ 3 ÷ 1.10, rounded. |
| Depth behind a target volume | area needed × depth ÷ 324, solved for depth | 3 inches — the depth that turns 1,980.00 sq ft into 18.33 yards. |
| Waste behind a target volume | target volume × 324 ÷ depth ÷ area − 1, as a percent | 10% — the allowance that turns 1800 sq ft into 1,980.00 sq ft. |
First, measure the bed honestly: length times width for each bed, added together, with L-shaped beds split into rectangles. A guessed area moves the order by the same percentage as the guess. Second, keep the depth honest: cedar bark breaks down slowly over several seasons, so a layer spread at 3 inches may sit thinner within weeks — if you want 3 inches after settling, spread a little deeper and say so. Third, do not skip the waste allowance on cedar bark: it is light, dries in sun and blows in wind, so the 10% allowance is the difference between finishing the bed and running short with the truck already gone.
Area 1800 sq ft, depth 3 inches, waste 10%. Area needed: 1800 × 1.10 = 1,980.00 sq ft. Exact volume: 1,980.00 × 3 ÷ 324 = 18.33 cubic yards. Order: round 18.33 up to 19 cubic yards. Drop the waste to 0% and the exact volume falls to 16.67 yards, order 17; drop the depth to 2 inches and it falls to 12.22 yards, order 13. Depth moves the answer faster than waste does, because every inch adds a full layer across the whole bed.
Every row below applies 10% waste to the area first, then divides by 324: yards = area needed × depth ÷ 324, rounded up to the next whole yard for the order. Find your bed size and depth, read across, and order the last column.
| Area (sq ft) | Depth (inches) | Area needed (sq ft, 10% waste) | Exact (cubic yards) | Order |
|---|---|---|---|---|
| 250 | 2 | 275.00 | 1.70 | 2 cubic yards |
| 250 | 3 | 275.00 | 2.55 | 3 cubic yards |
| 500 | 2 | 550.00 | 3.40 | 4 cubic yards |
| 500 | 3 | 550.00 | 5.09 | 6 cubic yards |
| 750 | 2 | 825.00 | 5.09 | 6 cubic yards |
| 750 | 3 | 825.00 | 7.64 | 8 cubic yards |
| 1000 | 2 | 1,100.00 | 6.79 | 7 cubic yards |
| 1000 | 3 | 1,100.00 | 10.19 | 11 cubic yards |
| 1200 | 3 | 1,320.00 | 12.22 | 13 cubic yards |
| 1400 | 2 | 1,540.00 | 9.51 | 10 cubic yards |
| 1500 | 2 | 1,650.00 | 10.19 | 11 cubic yards |
| 1500 | 4 | 1,650.00 | 20.37 | 21 cubic yards |
| 1750 | 3 | 1,925.00 | 17.82 | 18 cubic yards |
| 2000 | 3 | 2,200.00 | 20.37 | 21 cubic yards |
| 2500 | 2 | 2,750.00 | 16.98 | 17 cubic yards |
| 3000 | 3 | 3,300.00 | 30.56 | 31 cubic yards |
A 1800 square foot bed at 3-inch depth with 0% waste gives 16.67 cubic yards exact, order 17 cubic yards. The same bed at 2-inch depth with 10% waste gives 12.22 cubic yards exact, order 13 cubic yards. A 1550 square foot bed at 3-inch depth with 10% waste gives 15.79 cubic yards exact, order 16 cubic yards. A 2050 square foot bed at 3-inch depth with 10% waste gives 20.88 cubic yards exact, order 21 cubic yards. Each branch changes exactly one input, so the difference from 18.33 isolates that input.
The area behind 18.33 cubic yards is 1800 sq ft: at 1550 sq ft the figures are 15.79 cubic yards exact, order 16 cubic yards, and at 2050 sq ft they are 20.88 cubic yards exact, order 21 cubic yards. The depth behind 18.33 cubic yards is 3 inches: at 2 inches the figures are 12.22 cubic yards exact, order 13 cubic yards, and at 4 inches they are 24.44 cubic yards exact, order 25 cubic yards — one inch either way moves the order by about 6 yards. The waste behind 18.33 cubic yards is 10%: at 5% the figures are 17.50 cubic yards exact, order 18 cubic yards, and at 15% they are 19.17 cubic yards exact, order 20 cubic yards — waste moves the exact volume, and at 15% it lifts the order to 20 yards.
The defaults assume a flat 1800 square foot bed, a uniform 3-inch layer, and a 10% waste allowance. Real cedar bark beds are rarely flat: slopes shed mulch downhill, paths and tree trunks eat into the area, and cedar bark breaks down slowly over several seasons, so measure the planted area only and keep the waste allowance on sloped ground. Zero square feet is the honest edge: 0.00 cubic yards exact, order 0. A depth of zero or below, a negative area, or a negative waste allowance is rejected, because none of them describes a real bed.
A gardener mulching a vegetable bed with cedar bark: the 1800 square foot headline is a large kitchen-garden bed, and the table covers everything from a 250 square foot border to a 3000 square foot orchard floor. A landscaper quoting a cedar bark job: the waste column protects the quote, and the order column is the number given to the supplier. A homesteader spreading bulk cedar bark on paths: the 3-inch rows are the bed depths, and the 2-inch rows are the path depths. A community garden coordinator splitting a bulk delivery: each plot reads its own row, and the orders add up to the truckload.
The arithmetic is exact for the inputs entered; the judgement is in the inputs. A guessed area, a depth measured before settling, or a skipped waste allowance will each move the answer by exactly the amount of the error, every load. The model does not include nitrogen drawdown in soil, compaction over the season, or delivery minimums — a supplier may sell only in whole yards or charge extra below a minimum, so confirm the order quantity with the supplier. This page is a calculation tool, not landscaping advice.
Cedar Bark mulch 1800 sq ft at 3-inch depth with 10% waste needs 1,980.00 sq ft, 18.33 cubic yards exact, order 19 yards. Free calculator, plus 16-row table. Source: Bright Side Kit, https://brightoolbox.com/cedar-bark-mulch-chart/, accessed 30 October 2026 (2026-10-30).
Because waste is lost cover: spillage, wind and uneven ground mean you need more covered area than the bed measures. Adding 10% to the area, then converting to yards, keeps the waste in the same units as the bed. Applying it after the conversion gives the same number here, but the area-first order keeps the table readable.
Three inches is the standard bed layer on this page, and 2 inches suit paths and top-ups. Cedar Bark breaks down slowly over several seasons, so a 3-inch spread may sit thinner; if you want a lasting 3-inch layer, spread slightly deeper and expect to top up during the season.
Cedar bark is naturally aromatic and slow to break down, so it lasts longer than straw mulches; it suits ornamental beds and paths, so use it on beds or paths. This calculator prices volume only and does not judge the gardening choice.
Split it into rectangles, measure each, and add the areas before entering the total. A circle uses radius times radius times 3.14. Guessing one number for an irregular bed is the most common reason orders come up short.
Because mulch is sold by the whole yard and you cannot buy 0.67 of a yard from most suppliers. Rounding up also covers settling and thin spots; the 0.67 yard of headroom is cheaper than a second delivery for a shortfall.
The volume math is the same for any loose mulch — area, depth and waste convert the same way — but settling and coverage differ by material. Bark holds its depth longer than cedar bark, so use the cedar bark rows for cedar bark and the matching chart for bark or wood chips.